Tags:
view all tags
---++Keck NGAO Team Meeting #2 ---++++++8:30a - 5:30p ---++++++Tuesday, November 14, 2006 ---++++++012 Robinson Laboratory, Caltech ---++++++Telecon attendees: 877-280-4645 passcoed 540030 Directions: [[http://www.oir.caltech.edu/twiki_oir/bin/view.cgi/Keck/NGAO/getting-to-caltech.html][Getting to Caltech]] (.html) and [[http://caltech.edu/maps][Caltech campus map]] (.pdf) --- |*In propria persona*:|Adkins, Bouchez, Cameron (am), Dekany, Gavel, Ireland (am), Max, Moore, Neyman, Velur, Wizinowich| |*In effigie (e.g. on the phone)*:|Bauman (potential), Flicker, Johannson, Le Mignant, Liu, Marchis| --- Goals: * Introduce team structure and responsibilities * Review System Requirements Document (Release 1) * Review key drivers for each of the NGAO performance and efficiency budgets * Review recent trade studies * Review Keck Interferometer requirements (N.B. these are _not_ (yet) NGAO requirements imposed by KI) * Review instrumentation study strategy for NGAO system design phase Agenda: * 8:00 am Refreshments * 8:30 am Welcome and Team Introductions (*All*) * 9:00 am Management Report (*Wizinowich*) [[%ATTACHURL%/filename][.ppt]] * Review study overall progress, progress against milestones, and summary financial situation * 9:30 am Science Requirements Document (Release 1) (*Max*) [[%ATTACHURL%/filename][.ppt]] * From the SD SEMP: The SRD describes the new system in terms of the needed scientific and technical performance. The document also expresses specific requirements for implementation or design where those requirements are essential to satisfactory integration and interoperation of the new system with other observatory systems. * Review _changes_ to science requirements contained in SRD (Release 1) compared to June NGAO proposal * Discuss science / engineering team interactions * 10:30 am *Break* * 10:45 am Key Performance Drivers (*Dekany*) [[%ATTACHURL%/filename][.ppt]] * Review the NGAO Required Observing Modes * Review the key architecture and technology drivers for each of the 7 Performance and 2 Efficiency Budgets * Astrometric Precision (*Cameron*) * Background (*Bouchez*) * Encircled Energy (*Gavel*) * High-Contrast (*Macintosh*) * Photometric Precision (*Britton*) * Polarimetric Precision (*Ireland*) * Transmission (*Bouchez*) * Wavefront Error (*Dekany*) * Observing Efficiency (*LeMignant*) * Observing Uptime (*Johansson*) * 12:15 pm *Lunch* * 1:00 pm Trade Study Report: LGS Asterism Geometry and Size (*Flicker*) [[%ATTACHURL%/filename][.ppt]] * From the WBS Dictionary: Find the simplest LGS asterism geometry meeting the performance budget goals (e.g. quincunx, ring, 1+triangle, or hex) and the asterism radii. Consider optimization of the Strehl of the tip/tilt stars and the resultant sky coverage as well. Complete when LGS asterism, HO WFS, and LO WFS requirements have been documented. * 1:30 pm Trade Study Report: Fixed vs. Variable LGS Asterism (*Velur*) [[%ATTACHURL%/filename][.ppt]] * From the WBS DIctionary: Consider the cost/benefit of continually varying the LGS asterism radius vs. a fixed number of radii (e.g. 5", 25", 50"). Complete when LGS asterism requirements have been documented. * 2:00 pm Keck Interferometry Requirements (*Neyman*) [[%ATTACHURL%/KI_req_NGAO_crn.ppt][KI_req_NGAO_crn.ppt]] * Review the KI requirements on delivered wavefront, including wavefront error and polarization * 2:30 pm NGAO Instrument Study Strategy (*Adkins - RD suggests + Moore*) [[%ATTACHURL%/filename][.ppt]] * Review the strategy, scope, organization, and expectations for instrument "proposal-level" development within the NGAO system design phase * Discuss science /engineering team interactions * Review schedule for initial NGAO instrument concepts (proposed:) * Near-infrared Imager * Visible Imager * Deployable Near-Infrared IFU Spectrograph * Review scope of upcoming Trade Study: Science Instrument Reuse * 3:45 *Break* * 4:00 Discussion: Upcoming tasks and milestones (*Wizinowich*) [[%ATTACHURL%/filename][.ppt]] * 4:30 General Discussion (*All*) * 5:30 Adjourn * Evening NGAO Dinner in Old Town Pasadena (6:30p) * Akbar Cuisine of India ($20) (_Wizinowich_) * Gaucho Grill (Argentinian) ($20) (_vote here_) * Il Fornaio (Italian) ($30) (_Dekany_) * Twin Palms (Californian) ($40) (_vote here_) * [[%ATTACHURL%/KI_req_NGAO_crn.ppt][KI_req_NGAO_crn.ppt]]: Interferometer requirements for NGAO
Attachments
Attachments
Topic attachments
I
Attachment
History
Action
Size
Date
Who
Comment
ppt
KI_req_NGAO_crn.ppt
r1
manage
3290.0 K
2006-11-11 - 18:23
UnknownUser
Interferometer requirements for NGAO
Edit
|
Attach
|
Watch
|
P
rint version
|
H
istory
:
r24
|
r6
<
r5
<
r4
<
r3
|
B
acklinks
|
V
iew topic
|
Raw edit
|
More topic actions...
Topic revision: r4 - 2006-11-11
-
ChrisNeyman
Home
Site map
Antarctica web
Gattini web
SPRITE web
Cahill web
Gemini web
Keck web
MOSFIRE web
NGAO web
Main web
Palomar web
GASP web
PTF web
PalmLGS web
RoboAO web
SDC web
SEDM web
SWIFT web
TMAS web
Triplespec web
WaSP web
ZTF web
SNAP web
Sandbox web
Subaru web
PFS web
TMT web
More...
NGAO Web
Create New Topic
Index
Search
Changes
Notifications
RSS Feed
Statistics
Preferences
View
Raw View
Print version
Find backlinks
History
More topic actions
Edit
Raw edit
Attach file or image
Edit topic preference settings
Set new parent
More topic actions
Account
Log In
Register User
Edit
Attach
Copyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback