Difference: Variablefollowup (1 vs. 7)

Revision 72021-06-09 - JanVanRoestel

Line: 1 to 1
 
META TOPICPARENT name="VariableWorkingGroup"
  • Lulin Observatory: 1m and 0.4m for photometric follow-up (sent request to Ngeow)
  • KPED 2.2 meter: high cadence photometry (PI: Coughlin)
Added:
>
>
  • Keck LRIS/ESI (Prince, vanRoestel, Caiazzo)
  • Chimera/DBSP P200 (Prince, vanRoestel, Caiazzo)
 

Semester 2019B

  • LCO (PI: Kupfer) 32h on 2meter, 128 h on 1meter, 80 on 0.3 meter

Revision 62019-05-29 - JanVanRoestel

Line: 1 to 1
 
META TOPICPARENT name="VariableWorkingGroup"
  • Lulin Observatory: 1m and 0.4m for photometric follow-up (sent request to Ngeow)
Added:
>
>
  • KPED 2.2 meter: high cadence photometry (PI: Coughlin)
 
Changed:
<
<

Semester 2018B

>
>

Semester 2019B

  • LCO (PI: Kupfer) 32h on 2meter, 128 h on 1meter, 80 on 0.3 meter
  • LCO (PI: van Roestel) 30h on 2meter, 60 h on 1meter
  • DBSP (PI: Prince) 8 nights
  • Keck LRIS&ESI (PI: Prince) 6 nights

Semester 2019A

  • Lick Shane (PI: Kupfer) 4 nights
  • WHT (PI: van Roestel) 3 nights
  • DBSP (PI: Prince) 8 nights
  • Keck LRIS&ESI (PI: Prince) 6 nights
 
Added:
>
>

Semester 2018B

 

Semester 2018A

  • LCO (2018A; PI Kupfer): We were allocated 64 hours 1m and 16 hours 2m time for imaging follow-up

Revision 52018-04-19 - ChowChoongNgeow

Line: 1 to 1
 
META TOPICPARENT name="VariableWorkingGroup"
Added:
>
>
  • Lulin Observatory: 1m and 0.4m for photometric follow-up (sent request to Ngeow)
 

Semester 2018B

Revision 42018-04-19 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="VariableWorkingGroup"

Semester 2018B

Line: 10 to 10
 
  • APO 1 (2nd quarter; Szkody) 1 half-night per month (Apr 16, May 14, June 16 with DIS for sky surveys followup)
Deleted:
<
<
-- ThomasKupfer - 11 Apr 2018 -- PaulaSzkody - 19 Apr 2018
 \ No newline at end of file
Added:
>
>
  • APO 2 (2nd quarter; Bellm) 2 half-nights per month with DIS--mainly transient classification but can easily fit other targets in
 \ No newline at end of file

Revision 32018-04-19 - PaulaSzkody

Line: 1 to 1
 
META TOPICPARENT name="VariableWorkingGroup"
Deleted:
<
<
 

Semester 2018B

Line: 7 to 6
 

Semester 2018A

  • LCO (2018A; PI Kupfer): We were allocated 64 hours 1m and 16 hours 2m time for imaging follow-up
Added:
>
>
  • LCO (2018A; PI Szkody): allocated 12 hrs 2m time for various sky survey followup including ZTF
 
Added:
>
>
  • APO 1 (2nd quarter; Szkody) 1 half-night per month (Apr 16, May 14, June 16 with DIS for sky surveys followup)
  -- ThomasKupfer - 11 Apr 2018 \ No newline at end of file
Added:
>
>
-- PaulaSzkody - 19 Apr 2018
 \ No newline at end of file

Revision 22018-04-11 - ThomasKupfer

Line: 1 to 1
 
META TOPICPARENT name="VariableWorkingGroup"
Added:
>
>

Semester 2018B

Semester 2018A

 
  • LCO (2018A; PI Kupfer): We were allocated 64 hours 1m and 16 hours 2m time for imaging follow-up

Revision 12018-04-11 - ThomasKupfer

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="VariableWorkingGroup"
  • LCO (2018A; PI Kupfer): We were allocated 64 hours 1m and 16 hours 2m time for imaging follow-up

-- ThomasKupfer - 11 Apr 2018

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.