Difference:
Variablefollowup
(5 vs. 6)
Revision 6
2019-05-29 -
JanVanRoestel
Line: 1 to 1
META TOPICPARENT
name="VariableWorkingGroup"
Lulin Observatory: 1m and 0.4m for photometric follow-up (sent request to Ngeow)
Added:
>
>
KPED 2.2 meter: high cadence photometry (PI: Coughlin)
Changed:
<
<
Semester 2018B
>
>
Semester 2019B
LCO (PI: Kupfer) 32h on 2meter, 128 h on 1meter, 80 on 0.3 meter
LCO (PI: van Roestel) 30h on 2meter, 60 h on 1meter
DBSP (PI: Prince) 8 nights
Keck LRIS&ESI (PI: Prince) 6 nights
Semester 2019A
Lick Shane (PI: Kupfer) 4 nights
WHT (PI: van Roestel) 3 nights
DBSP (PI: Prince) 8 nights
Keck LRIS&ESI (PI: Prince) 6 nights
Added:
>
>
Semester 2018B
Semester 2018A
LCO (2018A; PI Kupfer): We were allocated 64 hours 1m and 16 hours 2m time for imaging follow-up
View topic
|
H
istory
:
r7
<
r6
<
r5
<
r4
|
More topic actions...
Copyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback