Difference: CosmoTelecon20180111 (1 vs. 3)

Revision 32018-01-11 - UlrichFeindt

Line: 1 to 1
 
META TOPICPARENT name="CosmoTelecons"

Agenda:

  • Brief update on the Machine Learning work group (Ashish)
Line: 10 to 10
 

Minutes

Attendance:
Added:
>
>

ML

  • Star/Galaxy separation (Adam Miller)
    • Will be run at IPAC and included in alerts
    • Currently mostly based on PANSTARRS (among others) but ZTF will be included later on
  • Real/Bogus is being tested using Zooniverse: https://www.zooniverse.org/projects/rswcit/ztf-rb-project
    • Trying to get a good sample of SNe from that
    • Everybody is encouraged to contribute a bit of their time to clicking through some candidates (15 minutes a week would be great already)
    • Some candidates classified as real were ingested into GROWTH marshal but not many made it through the filters yet
    • By March it should be working

Survey Planning

  • First couple of weeks will be given to asteroids
  • Can this time also be used for commissioning? A: That should probably be engineering time.
  • There will also be two weeks in August for the galactic plane survey, in which the high-cadence and i-band will stop.
  • MSIP is fixed and will start in March.
  • Partnership plan to be fixed by Jan 20th.
  • i-band will come in February (Hooray!) and thus be available from survey start.

SEDm

  • SEDm will be fitted with new micro-lensed array in March.
  • Hopefully done within a day.
  • Based on review of White Papers, all extragalactic proposals can be accomodated for.
  • Since exposure length will potentially go down, we may be able to go deeper.

AMPEL

  • There is a first version in the repository.
  • More information/documentation will be distributed soon.

i-band Fields

  • See link above for summary of the first field selection attempt
  • Biggest problem currently is scheduling that many fields in summer when the Galaxy is up.
  • Currently adjusting the E(B-V) cut for that time but those fields may be useless for cosmology.
  • Maybe we can go to a three day cadence in summer. (Need to check with Eric.)
  • We would also like to put a single epoch inside the summer gap due to the galactic plane survey.
 

Connection:

Join from PC, Mac, Linux, iOS or Android: https://zoom.us/j/272828651

Revision 22018-01-09 - UlrichFeindt

Line: 1 to 1
 
META TOPICPARENT name="CosmoTelecons"

Agenda:

Deleted:
<
<
  • New version of simsurvey (Uli)
 
  • Status of SWG tasks (and time to ask questions about your task if things are unclear)

Minutes

Revision 12018-01-09 - UlrichFeindt

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="CosmoTelecons"

Agenda:

Minutes

Attendance:

Connection:

Join from PC, Mac, Linux, iOS or Android: https://zoom.us/j/272828651

Or iPhone one-tap (US Toll): +16468769923,,272828651# or +16699006833,,272828651#

Or Telephone: Dial: +1 646 876 9923 (US Toll) or +1 669 900 6833 (US Toll) Meeting ID: 272 828 651 International numbers available: https://zoom.us/zoomconference?m=yUACqd9q0rOg7icOHZs3wWcqWHdt5lib

-- UlrichFeindt - 09 Jan 2018

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback