NGAO Functional Requirements SD Phase (Old) This page presents various drafts and background information on the NGAO functional requirements: 1. Background information...
Irregular Asterisms Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman 05 Mar 2009...
NGAO Observing Scenarios Information This page is used to summarize the work for the observing scenarios. The observing scenarios and example observations are used...
This collection is for maintaining the Preliminary Design Phase Management Plan. Preliminary Design (PD) Phase Plan from System Design Review (SDR) Systems Engineering...
NGAO Development Process Standards Posted below is some material that document the W. M. Keck Observatory Development Phases. The author of these documents is the...
NGAO Science Operations 0. Science Operations during the SD phase (up to April 2008) Follow link to access the Twiki page that presents the work studies performed...
This collection is for supporting the development of a Plan for Phased Implementation and Descopes. 594 Plan to Address Phased Implementation and Descope Options...
Science Simulations This page presents various simulations in progress or completed for the NGAO Science Cases: 1 PSF Libraries 1 PSF Simulation Parameters...
This collection is for producing the Systems Engineering Management Plan to be presented at the System Design Review. WBS 4.1.1 Work Breakdown Structure Task Definitions...
AO System Diagnostics (WBS 3.2.3.9, WBS 3.2.3.10, WBS3.2.12) Integrated with AO (WBS 3.2.3.9) Proposed subsystems Radiometric calibration of instrument and...
NGAO LGS Object Selection Mechanism page Nomenclature LGS WFS assembly This is the entire LGS WFS package containing the 9 LGS WFS units, LGS OSM and all structure...