Commissioning Activities

Engineering (Sept 6 - Oct 2, 2017)

Added:
>
>
Cryostat Arrival
Trim Plate Arrival
First Light
Flatfield Illuminator Arrival
Filter Exchanger Arrival
 

Science capability (Oct 2 - Dec 31, 2017)

astrometric test: follow field through the night and look at astrometric residuals as a function of airmass

Added:
>
>
I-band Filter Arrival
 \ No newline at end of file

Revision 22017-08-07 - MatthewGraham

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
Added:
>
>

Commissioning Activities

 
Changed:
<
<
(in preparation for an actual commissioning plan, here's a scratchpad for tests we need to do.)
>
>

Engineering (Sept 6 - Oct 2, 2017)

Science capability (Oct 2 - Dec 31, 2017)

 

astrometric test: follow field through the night and look at astrometric residuals as a function of airmass

Revision 12017-01-09 - EricBellm

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"

(in preparation for an actual commissioning plan, here's a scratchpad for tests we need to do.)

astrometric test: follow field through the night and look at astrometric residuals as a function of airmass

 