October 14-16, 2008 LGS observing run
Nightly Summaries
10/14/08 UT
10/15/08 UT
10/16/08 UT
All-Sky Camera
|
|
|
10/15/08 UT |
10/16/08 UT |
10/17/08 UT |
Safety Documents
- Laser projection schedule (FAA Letter of Non-Objection):
- 19:09:00 10/14/08 - 05:58:00 10/15/08 PDT
- 19:08:00 10/15/08 - 05:59:00 10/16/08 PDT
- 19:07:00 10/16/08 - 06:00:00 10/17/08 PDT
- Securitas spotters are schedule to be on site 18:00-06:00 PDT on 10/14-10/16.
- US-STRATCOM documents:
Personnel schedule
|
Tue 10/14 |
Wed 10/15 |
Thu 10/16 |
Bouchez |
X |
? |
? |
Roberts |
X |
X |
X |
Velur |
X |
|
|
Peffer |
X |
X |
X |
Test Plans and Procedures
Please post your test plans on the
Test Plan Library page, and add a link below.
- AO setup
- AO system internal focus: doc, pdf
- AO bench setup and checkout: doc, pdf
- BTO procedures
- BTO setup (v2.4): doc, pdf
- BTO alignment (v2.4): doc, pdf
- BTO alignment, abbreviated version (v1.0): doc, pdf
- BTO shutdown (v1.1): doc, pdf
- Laser procedures
- Laser startup (v2.0): doc, pdf
- Laser shutdown (v1.0): doc, pdf
- Observing procedures:
- LGS science night checklist (v1.0): doc, pdf
- NGS Checkout (v3.1): doc, pdf
- LGS Checkout (v1.0): doc, pdf
- LGS target acquisition (v4.0): doc, pdf