August 15-22, 2007 LGS observing run
Night logs and results
Safety Documents
- Laser projection schedule (FAA Letter of Non-Objection):
- 19:48:00 9/15/08 - 05:38:00 9/16/08 PDT
- 19:46:00 9/16/08 - 05:38:00 9/17/08 PDT
- 19:43:00 9/18/08 - 05:40:00 9/19/08 PDT
- 19:42:00 9/19/08 - 05:40:00 9/20/08 PDT
- 19:41:00 9/20/08 - 05:41:00 9/21/08 PDT
- 19:39:00 9/21/08 - 05:42:00 9/22/08 PDT
- 19:38:00 9/22/08 - 05:43:00 9/23/08 PDT
- Securitas spotters are schedule to be on site 18:45-05:45 PDT on 9/15-9/20, 18:30-05:45 on 9/21-9/22.
- US-STRATCOM documents:
Personnel and engineering schedules
|
Mon 9/15 |
Tue 9/16 |
Thu 9/18 |
Fri 9/19 |
Sat 9/20 |
Sun 9/21 |
Mon 9/22 |
Bouchez |
X |
X |
X |
X |
X |
X |
X |
Cromer |
X |
X |
? |
? |
|
|
|
Roberts |
X |
X |
X |
X |
X |
X |
X |
Velur |
? |
|
|
|
|
|
|
Kajsa |
X |
X |
X |
X |
X |
X |
X |
Possible JPL visitors on 9/22.
Target lists and finding charts
Engineering Schedule and Test Plans
Please post your test plans on the
Test Plan Library page, and add a link below.
- AO setup
- AO system internal focus: doc, pdf
- AO bench setup and checkout: doc, pdf
- BTO procedures
- BTO setup (v2.4): doc, pdf
- BTO alignment (v2.4): doc, pdf
- BTO alignment, abbreviated version (v1.0): doc, pdf
- BTO shutdown (v1.1): doc, pdf
- Laser procedures
- Laser setup (v1.0): doc, pdf
- Laser shutdown (v1.0): doc, pdf
- Observing procedures:
- NGS Checkout (v3.1): doc, pdf
- LGS Checkout (v1.0): doc, pdf
- LGS target acquisition (v4.0): doc, pdf
- Engineering experiments:
- AO Optimization on the laser at zenith: doc, pdf
- Low-order loop optimization: doc, pdf