May 23-26, 2007 LGS observing run
Safety documents
- FAA documents:
- US-STRATCOM documents:
Schedules
Procedures and test plans
Please post your test plans on the
Test Plan Library page, and add a link below.
- AO setup
- AO system internal focus: doc, pdf
- AO bench setup and checkout: doc, pdf
- BTO setup
- BTO setup (v2.1): doc, pdf
- BTO alignment: doc (v2.1), pdf (v2.2!)
- BTO shutdown (v1.1): doc, pdf
- Observing procedures:
- NGS Checkout (v3.1): doc, pdf
- Laser Acquisition (v5.1): doc, pdf
- LGS target acquisition (v3.4): doc, pdf
- Engineering experiments:
- AO Optimization on the laser at zenith: doc, pdf
- Low-order loop optimization: doc, pdf
Night logs and results
5/24/07 UT
Laser and BTO setup until 10:00pm. Then checked LLT boresighting no adjustments necessary) and performed some LGS performance tests in partly cloudy conditions. Imaged two science targets at the end of the night. Partly cloudy, seeing ~0.50" in V.
5/24/07 night log