April 23-27, 2007 LGS observing run
Safety documents
- FAA documents:
- US-STRATCOM documents:
Schedules
Procedures and test plans
Please post your test plans on the
Test Plan Library page, and add a link below.
- AO setup
- AO system internal focus: doc, pdf
- AO bench setup and checkout: doc, pdf
- BTO setup
- Observing procedures:
- NGS Checkout (v3.1): doc, pdf
- Laser Acquisition (v5.1): doc, pdf
- LGS target acquisition (v3.4): doc, pdf
- Engineering experiments:
- AO Optimization on the laser at zenith: doc, pdf
- LOWFS field curvature: doc
- Low-order loop optimization: doc, pdf
Night logs and results
This topic: Palomar/PalmLGS
> Eng_070423
Topic revision: r6 - 2007-04-23 - AntoninBouchez