Recent Changes in Keck/NGAO Web retrieved at 21:41 (GMT)
Acquisition Cameras (WBS 3.2.3.7.1 WBS 3.2.3.7.2) WSPS NGAO acq WBS 32371v2.doc: Draft plan for WBS report NGAO WBS32371 dlm.doc: DLM`s working draft...
AO System Diagnostics (WBS 3.2.3.9, WBS 3.2.3.10, WBS3.2.12) Integrated with AO (WBS 3.2.3.9) Proposed subsystems Radiometric calibration of instrument and...
NGAO LGS Object Selection Mechanism page Nomenclature LGS WFS assembly This is the entire LGS WFS package containing the 9 LGS WFS units, LGS OSM and all structure...
This collection is for System Design Phase Planning and Tracking Documents EC Telecon Dial in Number 877 280 4645 with passcode 540030 (via WMKO) Systems Engineering...
Keck NGAO Team Meeting #14 10:00a 3:00p PST (Tentative) 8:00a 1:00p HST (Tentative) Tuesday, February 19, 2008 Tele/Videoconference Dial in Number: 877...
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
Keck NGAO Team Meeting #13 10:00a 4:15p PST 8:00a 2:15p HST Friday, January 25, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030...
Keck NGAO Cost Estimation Assignments Links Team Meeting #13 Estimator Template Workbooks (MS Excel) https://www.oir.caltech.edu/twiki oir/pub/Keck...
Keck NGAO Team Meeting #12 10:00a 5:30p PST 8:00a 3:30p HST Thursday, December 13, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
NGAO LOWFS Object Selection Mechanism Nomenclature: NGAO LOWFS OSM This is a interim OSM for the NGAO system, likely required for first light before the d IFS is...
Show
10,
20,
50,
100,
500,
1000 results per page, or
show all.
Related topics: RSS feed,
ATOM feed,
WebNotify,
site changes,
site map
This topic: Keck/NGAO
> WebHome > WebChanges
Topic revision: r2 - 2005-03-28 - TWikiContributor