This collection is for producing the Systems Engineering Management Plan to be presented at the System Design Review.
WBS 4.1.1 Work Breakdown Structure & Task Definitions:
WBS 4.1.2 Cost Estimation:
- The spreadsheet developed to produce a budget estimate for Chapter 6 of the NGAO proposal. See the "Budget" tab for the summary budget. This estimate was based on costs for each of the major subsystems developed in the tabs labelled "AO System", "Non-RT Control", "Laser System" and "Operations Tools".
- The cost estimate from the system architecture phase and accompanying notes (9/6/07).
- Initial thoughts on the cost estimation process from the 12/13/07 team telecon.
- Initial draft cost estimation KAON from the 12/13/07 team telecon, containing proposed costing guidelines.
WBS 4.1.3 Major Project Milestones:
WBS 4.1.4 Full MS Project Plan:
WBS 4.2 Risk Assessment & Management Plan:
WBS 4.3 Preliminary Design Phase Plan:
WBS 4.4 Integration and Test Plans:
WBS 4.5 Configuration Management:
WBS 4.6 Project Management Plan:
WBS 4.7 Systems Engineering Management Plan (SEMP) Document:
This topic: Keck/NGAO
> SEMPforSDR
Topic revision: r4 - 2008-01-19 - PeterWizinowich