
| Line: 1 to 1 | ||||||||
|---|---|---|---|---|---|---|---|---|
Lightcurve Simulations | ||||||||
| Line: 11 to 11 | ||||||||
Status/Results | ||||||||
| Changed: | ||||||||
| < < | Simulation parameters | |||||||
| > > | Simulation parametershttps://www.dropbox.com/sh/6zi50u0daw8iahr/AAAAlvZuVSsph7JgO3asG_Sua?dl=0 | |||||||
The most current simulation is for the SEDm white papers. It assumes 6 months of MSIP gR survey but I have also simulated a fast g-band survey starting in mid-February.
| ||||||||
| Added: | ||||||||
| > > |
| |||||||
ResultsRate of new discoveries | ||||||||