September 18 21, 2007 LGS observing run Night logs and results 9/19/07 UT Never opened due to high humidity and AO dynamic aperture device (DAD) failure. Laser...
October 22 27, 2007 LGS Observing Run Night logs and results 10/23/07 UT Observing cancelled due to fire danger and high winds. 10/24/07 UT Observing cancelled...
Solidworks Models of the LLT bench LLT FULL ASSEMBLY 18 Inch Diagnostics.EASM: Edrawings file of full LLT model H. Petrie, 2/25/08. Externally supplied SW part...
Zemax Models of the LLT bench Original models of LLT optical path by Chris Shelton (as designed): ZMX: telescope through the FSM, and a star camera. This has...
From C. Shelton, 06/02/06: Here`s a to do list, at least what I can remember. Is there anything else you can think of? Finish the `tasks left for next week` from...
Statistics for Palomar/PalmLGS Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic...
Beam Transfer Optics The beam transfer optics subsystem delivers the 589nm laser beam from the Coude lab to the laser launch telescope located behind the Hale telescope...
September 5 7, 2006 LGS Engineering Run Project schedules and task lists laser upgrade schedule LGS IPT meeting minutes, with task list JPL AO meeting...
Laser IPT Meeting Minutes Laser integrated produce team meetings are held Mondays 9:00 10:00am in 012 Robinson. The call in number is: 866 674 1191 x8203140....
PALMAO bench The PALMAO optical bench is placed onto the Cassegrain focus of the 200` Hale telescope. The system contains (1) the AO science instrument; (2) the deformable...
Error budgets and Performance Models LGS flux analysis v2.1 A. Bouchez Old versions: https://www.oir.caltech.edu/twiki oir/pub/Palomar/PalmLGS/ErrorBudget...
July 23 28, 2007 LGS observing run Night logs and results 7/24/07 UT Clear, excellent seeing. Completed laser and BTO setup for first 4 hrs. Then measured bright...
April 23 27, 2007 LGS observing run Night logs and results 4/24/07 UT Closed due to fog until 2:30am, then opened for NGS engineering due to low laser power...
May 23 26, 2007 LGS observing run Night logs and results 5/24/07 UT Laser and BTO setup until 10:00pm. Then checked LLT boresighting no adjustments necessary...
LGS Diagnostic Benches by Anna Moore on behalf of the LGS team (COO, JPL and Univ. of Chicago) Update ppt 040909 by Anna Moore and Hal Petrie summary SW.ppt:...
Management IPT Meeting Minutes Management integrated produce team meetings are held biweekly, Wednesdays 8:00 10:00am, at JPL. Management Mtg. (v2, edited 6/...
Welcome to Michael Martin`s twiki page LabVIEW Laser Diagnostics GUI.bmp:LabVIEW Laser Diagnostics GUI AnnaMoore 16 Jun 2007
MitchTroy 10 Apr 2007 JPG:
April 2 6, 2007 LGS observing run Safety documents FAA documents: letter of non objection (0 45 deg. zenith angle). Securitas spotters are scheduled...
Drawings Path for Feb `07(EASM) bench, WFS section As built April `07 (ao bench 070401.tar.gz) JennyRoberts 30 Jan 2007
June 12 14, 2006 LGS Engineering Run Pre run engineering work 6/5 6/6 BTO work schedule laser sched 060606.pdf: CSFL tasks for 6/06 LGS engineering run...
Palomar AO engineering run summary (2005 2006) Semester 06B UT Date Mode Conditions Seeing Log Comments 10/14/06 LGS rain link...
LGS Team Meetings Team meetings are held once per month, on 3:30pm 5:00pm on Thursdays in 023 Robinson on the Caltech campus. A video conference system is available...
AO Acquistion Camera Pulnix LGS platescale: Acq LGS platescale.txt A. Bouchez 7/17/06
Dynamic Aperture Device JennyRoberts 30 Jan 2007
PALM LGS High Order Wavefront Sensor AWFS Dynamic Aperture.doc: Two page summary of the Dynamic Aperture Device (Trash.Palomar PalmLGSDAD) RichardDekany...
January 5 7, 2007 LGS engineering run Safety documents Cleared by FAA for laser projection 18:00 05:45 PST. Spotters scheduled to be on site 20:00 06:...
December 6 8, 2006 LGS engineering run Schedules and calendars Dec. engineering run personnel schedule (v3) A. Bouchez 12/05/06 (v2) Safety documents...
LGS Project Schedules FY07 lgs 0612 personnel shed v2.pdf: 12/06 Palomar LGS schedule v2 AB 11/29/06 FY06 laser 060510.pdf: Laser schedule May June...
August 2006 Laser Move from Coude to AO lab Laser move preparations Pictures taken at Palomar by VNV: JPG: ID of connector 0.155` (may need to be reamed...
October 11 13, 2006 LGS Engineering Run Project schedules and task lists task schedule, v1 A. Bouchez 10/2/06 Oct. engineering run personnel schedule...
Cabling and Data Transfer by Anna Moore and John Henning The following summarises the current cabling installed on the 200inch telescope. We describe how signals from...
Components for the data communcation by Anna Moore and John Henning AnnaMoore 30 Sep 2006
Zemax Models of the Coude bench AnnaMoore 28 Sep 2006
Solidworks Models of the LLT bench by Anna Moore and Hal Petrie Externally supplied SW part models of components Newport U100 A2K NL.SLDPRT: Newport 1` kinematic...
Palomar Science Meeting 2006 Presentations PALAO LGS Science meeting CS.ppt: AO presentation part 1 C. Shelton PALAO LGS Science meeting AB.ppt: AO presentation...
OIR 1 Project Publications Available Information SPIE Conference #5490, Glassgow, Scotland, U.K. (2004) SPIE Conference #6272, Orlando, FL, U.S.A (...
July 11 13, 2006 LGS Engineering Run Project schedules and task lists plan for new CSFL etalons LGS IPT meeting minutes Safety documents letter of...
PALAO bench subsystem The PALAO bench is placed onto the 200` Hale telescope at the Cassegrain focus and contains (1) the science instrument; (2) the adaptive optics...
LGS AO Library LGS AO system characterization Dam et al. 2006, The W.M. Keck Observatory laser guide star adaptive optics system: Performance characterization...
Astronomical Telescopes and Instrumentation 2006 mgsu paper.pdf: Velur et al., Multiple Guide Star Unit: Palomar`s Tomograph, 6272 188 (preprint). MGSU poster...
Spie2006 Orlando, 24 31 May 2006 Presentations and posters spie06 palomarlgs.pdf: Bouchez et al., Laser Guide Star Adaptive Optics at Palomar Observatory,...
05/16/06 Experiments and Analysis Conclusions I suggest replacing the M2 mirror with an enhanced aluminum version, such as CVI part EAV PM 4050 C ($730). This will...
Version 2 (5:15pm, 6/2/06) Monday 6/5 0800 AB arrives at Palomar 0800 1000 AB: Complete BTO breadboard setup and 660nm laser alignment. 1000 CS arrives at Palomar...
All, I just returned from a long day at Palomar. Here`s what I got done on the BtO: (I will also post this on the TWiki site BtO page...) 1. Checked stability and...
Chicago Sum Frequency Laser CSFL upgrade CSFL operational documents
Testing 1, 2, 3.... AntoninBouchez 02 Jun 2006
CSFL upgrade purchase list: 1. Coarse Filter parts : a. Filter enclosure : Mc Master CArr # 6882K1 Bttm Load Hi Purity Single Cartridge Housing for 9 3/4 To...
ViswaVelur 13 May 2006 Optics.xls: Optics inventory EEC, VNV 5/12/06 Inventory.xls: General inventory (sans optics) EEC, VNV 5/12/06
Vendor list Non linear Crystal databaseDocument Actions last edited 3 months ago by abouchez Conex systems, Inc. San Ramon, CA Ph: 925 735 8825 Contact Ting...

«Previous   1  2  3   Next»

Show 10, 20, 50, 100, 500, 1000 results per page, or show all.

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2005-03-28 - TWikiContributor
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback