December 11-12, 2008 LGS observing run
Nightly Summaries
12/12/08 UT
Mostly cloudy, 1.0" seeing in R. Performed NGS observations with SWIFT most of night. Performance good on bright stars (FWHM ~0.30" in R). LOWFS camera inoperable; will trouble-shoot in morning. Laser not ready (IR powers: 15W @ 1.06 um, 9W @ 1.32 um).
12/13/08 UT
All-Sky Camera
|
|
12/12/08 UT |
12/13/08 UT |
Safety Documents
- Laser projection schedule (FAA Letter of Non-Objection,LOD amendment):
- 17:39:00 12/11/08 - 05:44:00 12/12/08 PDT
- 17:39:00 12/12/08 - 05:44:00 12/13/08 PDT
- Securitas spotters are schedule to be on site 17:00-05:45 PDT.
- US-STRATCOM documents:
Personnel schedule
|
Wed 12/10 |
Thu 12/11 |
Fri 12/12 |
Bouchez |
Arrive late |
X |
X |
Kibblewhite |
X |
X |
X |
Roberts |
X |
X |
|
Peffer |
X |
X |
X |
Test Plans and Procedures
Please post your test plans on the
Test Plan Library page, and add a link below.
- AO setup
- AO system internal focus: doc, pdf
- AO bench setup and checkout: doc, pdf
- BTO procedures
- BTO setup (v2.4): doc, pdf
- BTO alignment (v2.4): doc, pdf
- BTO alignment, abbreviated version (v1.0): doc, pdf
- BTO shutdown (v1.1): doc, pdf
- Laser procedures
- Laser startup (v2.0): doc, pdf
- Laser shutdown (v1.0): doc, pdf
- Observing procedures:
- LGS science night checklist (v1.1): doc, pdf
- NGS Checkout (v3.1): doc, pdf
- LGS Checkout (v1.0): doc, pdf
- LGS target acquisition (v4.0): doc, pdf