May 18, 2008 NGS Engineering
Goals
While some basic checkout of the NGS-AO system was accomplished on
April 9, 2008, performance tests were not possible due to clouds and poor seeing. The primary goal of this additional NGS engineering night is to complete the performance characterization of the NGS-AO system after the winter 07/08 optical bench relayout. A secondary goal is the testing of a new iterative reconstructor by L. Lessard and D. MacMynowski.
Personnel schedule
Planning to be present on 5/12/08 (local): Bouchez, Lessard, Roberts, MacMynowski.
Procedures and test plans
Please post your test plans on the
Test Plan Library page, and add a link below.
- Daytime tests
- AO bench setup and checkout (1 hrs) - J. Roberts
- Test iterative reconstructor with AO stimulus - L. Lessard
- Nighttime tests
Results