2005-2006 Palomar AO engineering nights

UT Date Conditions Seeing(1) Mode Log Comments
04/14/06 5h clear, 4h fog 1.00 (06:42) LGS link First HO lock on LGS (zenith)
04/13/06 fog, rain LGS
04/12/06 5h clear, 4h cloudy 0.75 (03:48) LGS link Collimated and tested LLT w/ 10" mirror
02/12/06 clear 1.50 (09:10) NGS link MGSU, LOWFS performance tests
02/11/06 clear 0.35 (08:20) NGS link MGSU, NGSAO performance tests
02/10/06 clear ~0.70 (11:10) NGS link MGSU tests, first dual-NGS lock
01/13/06 clear NGS MGSU tests
01/12/06 clear NGS MGSU tests
12/14/05
12/13/05
11/19/05 Clear 1.28 (04:00) LGS link LLT performance tests, BTO calibration
11/18/05 6h clear, 4h cloudy 1.17 (03:35) LGS link First uplink tip/tilt lock on LGS
11/17/05 clear 1.05 (03:45) LGS link BTO optimization, LLT collimation
11/16/05 clear 1.60 (05:27) LGS link BTO optimization
11/15/05 cloudy
09/23/05
09/22/05
09/21/05
09/20/05
08/21/05
08/20/05
08/19/05
08/18/05

(1): FWHM in arcseconds of 30s Br-gamma (2.18 mum) image, with tip-tilt loop closed and an optimized static figure on the DM. UT time is shown in parentheses.

-- AntoninBouchez - 12 May 2006

Edit | Attach | Watch | Print version | History: r10 | r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r2 - 2006-05-12 - AntoninBouchez
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback