AO System Diagnostics (WBS 3.2.3.9, WBS 3.2.3.10, WBS3.2.12) Integrated with AO (WBS 3.2.3.9) Proposed subsystems Radiometric calibration of instrument and...
NGAO LGS Object Selection Mechanism page Nomenclature LGS WFS assembly This is the entire LGS WFS package containing the 9 LGS WFS units, LGS OSM and all structure...
This collection is for System Design Phase Planning and Tracking Documents EC Telecon Dial in Number 877 280 4645 with passcode 540030 (via WMKO) Systems Engineering...
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
NGAO LOWFS Object Selection Mechanism Nomenclature: NGAO LOWFS OSM This is a interim OSM for the NGAO system, likely required for first light before the d IFS is...
Meeting Minutes Team Meeting #9 Agenda AO and Laser System Design Kickoff, August 24, 2007 group meeting September 28, 2007 Keck NGAO opto mechanical...
Keck NGAO Team Meeting #8 9:00 a 6:00 p (Pacific Daylight Time) Mon, July 9 to Fri, July 13, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
WBS 3.3 LGS Facility (NGAO System Design Collection) Work Package Meetings Kick off meeting held on 4th Sept., 2007 (attendees: J. Bell, J. Chin, C. Neyman, Erik...
NGAO Systems Architecture Excel spreadsheets for Systems architecture pickoff options and dithering options K mirror versus instrument rotators Additional...
070705 NGAO WBS 3.1.3 Meeting 10:00a 5:30p PDT Thursday, July 5, 2007 In person with Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 (only...
NGAO related site for Anna Moore Welcome! Instrument re use trade study Systems Architecture This is a link to the studies relating to NGAo systems architecture...
NGAO Systems Architecture Excel spreadsheets for LOWFS pickoffs, nodding and dithering and k mirror versus instrumet field de rotators PeterWizinowich...
NGAO High Contrast IPT Performance Budget Development Meeting Minutes 061121 NGAO high contrast minutes.pdf: Kickoff meeting 061212 NGAO high contrast...
WBS 3.1.3 Kickoff Meeting Meeting Materials NGAO Architecture Taxonomy.pdf: A shorthand nomenclature for discussion of potential NGAO architectures R. Dekany...
Keck NGAO Team Meeting #6 9:00 a 6:00 p (Pacific Daylight Time) Wed, April 25 and Thurs, April 26, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
NGAO Model Validation Parameter and data file exchange for testing the disparate tomography codes. Don Gavel 24 Aug 2006 Draft plan: Code Comparison Tests Report...
Optical Relay and Field Rotation Trade Study Working Optical Design Requirements See the corresponding Section on Optical Design Requirements in the latest SRD...
Photometric Precision Error Budget Development to Matthew Britton`s Photometric Precision page Includes first draft of Photometric Error Budget Technical...
07 Dec. 2006 Observing efficiency Meeting notes Agenda: Quick intro on the NGAO and background info for this meeting Introduce WBS for Observing Efficiency...