NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
PSF Reconstruction (PSF R) Project Scope: 1) Demonstrate NGS AO PSF Reconstruction with the Gemini Altair Keck AO systems (near term funded work). 2) Understand...
Notes on Keck AO for PSF Recovery Project AO General AO documentation can be found here Keck AO public Webpage AO Sign Conventions and Geometry Keck DM to WFS geometry...
This collection is for maintaining the Preliminary Design Phase Reports and tracked versions of the schedule. NGAO Project Schedules Tracked version of the Build...
Near IR Tip Tilt Sensor System Design Review (SDR): Date: Tuesday, December 7, 2010 Time: 10:30am 4:00pm HST / 12:30pm 6:00pm PST Reviewers: Corinne...
Reduced Focal Anisoplanatism Error Demonstration at Keck Team Lead: Chris Neyman Scientific Team: Peter Wizinowich, Rich Dekany, Don Gavel, Brent Ellerbroek...
NGWFC Parametric Oscillator for tip/tilt vibration reduction Project on hold as of Sept 9, 2010 Parametric Oscillator delayed for now.pdf: Chris` email regarding...
NGWFC Lab Environment MVME6100 Boot parameters Uses oneo (128.171.96.192) as the boot host instead of deprecated kuhio. Oneo is a solaris 8 container setup specifically...
NGAO Controls Systems Home Page NGAO Background Information Multi Systems Command Sequencer (MCS) SW Architecture Work (KCSF) Control Systems Software Preliminary...
DAVINCI Mini Review Final Reviewer Report 743 Final Report on the NGAO DAVINCI Instrument Mini Design Review Agenda and Scope/Objectives DAVINCI Mini review...
Control Systems Software Mini Review: April 16, 2010 Review Schedule Material to web site: COB Tue April 6, 2010 Response from reviewers due: COB Tue...
This collection is for maintaining the Systems Engineering Management Plan (SEMP) documentation for the PDR. Breakdown Structure (PBS) (2/26/10) Work...
NGAO Systems Engineering Group Twiki Page A. Mini Design Reviews Actions Lists This list tracks outstanding action items from the PD phase NGAO mini reviews...
NGAO Opto Mechanics Mini Design Review, November 17, 2009 NOTE CHANGE The review date has been changed to November 17 to allow more time for the reviewers to read...
NGAO Real Time Controller Mini Design Review, December 2009 Telecon: 877 280 4645 room 540030 Video: 128.114.22.14 Review Schedule Design group posts material...
Design Standards: 484 Optical Design Practices for NGAO Exporting Zemax as a STEP file: Zemax Export Screen Snapshot Zemax files can be imported to Solidworks...
NGAO Motion Control Architecture Mini Design Review, 11 March 2010 Review Schedule Material to web site: 4 Mar Response from reviewers due: end of day...
NGAO Electronics Architecture Mini Design Review, 26 January 2010 Review Schedule Material to web site: 15 Jan Response from reviewers due: end of day...
NGAO System Architecture WBS 3.1.3 Work Package Schedule Subsystem Evaluation Criteria Form.xls. Please use this form when performing your subsystem evaluations...
NGAO Performance Flowdown Worksheets A performance flowdown is the allocation of error terms to constituent subsystems or components Update (4/25/10): The performance...
NGAO Alignment, Calibration, and Diagnostics mini review Questions and comments from Jim Lyke Responses from Peter in italics. KAON 719 Alignment Plan Sec....
PD Phase Functional Requirements PD Requirements Review Phase II March 2010 Goals The NGAO project will finalize the System and Functional requirements over the...
Working files for 102018 interface meeting Slightly tweeked version of Reni`s layout v9 ZMX Output science fold mirror tilt opened by 5 degrees (from...
This collection is for Opto Mechanical Graphics in support of design and interface control. Telescope: Note: WM Keck DSM team is working on a Solidworks 3D Model...
System Requirements Document Final Version for System Design Review 456 System Requirements Document (pdf) Draft Versions KAON456 NGAO SRD v1.14.doc...
HW Architecture Work 2010jan26: Controls Electronics Architecture Mini Review 2010mar11: Motion Controls Architecture Mini Review HW Architecture Work KAON...
B. Multi Systems Command Sequencer (MCS) Schedule The MCS portion excerpted from the main NGAO project plan (Excel spreadsheet) WBS interrelationships...
AO System Design Effort (WBS 3.2 3.3), System Design Phase PDR Phase Opto Mechanical Design page Opto Mechanical Mini Design Review, Nov 2009 Management...
Real Time Controller (RTC) Design, Preliminary Design Phase Link to mini Design Review Page Project Plan Project Plan Rebaseline (Revision 1, dated June...