Difference: WorkingGroups (1 vs. 43)

Revision 432018-09-27 - ZachGolkhou

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Technical Working Groups

Line: 36 to 38
 
  • interfaces

Machine Learning

Added:
>
>
 mailing list: ztfml@lists.astro.caltech.edu sign up here
Changed:
<
<
Members on list: Ashish M, Anna H, Andy C, Adam M, Brian B, Chris C, Dave C, Dmitry D, Eric B, Frank M, Zeljko I, David K, Kevin B, Lin Y, Mansi K, Matthew G, Nadia B, Nick S, John P, Patrick B, Tom P, Rahul B, Richard W, David S, Suvi G, Yutaro T, Todd B, Tiara H, Thomas K, Ulrich H, Umaa R, Angela VS, Chaoran Z (outdated: 29 Aug 2017)
>
>
Members on list: Ashish M, Anna H, Andy C, Zach G, Adam M, Brian B, Chris C, Dave C, Dmitry D, Eric B, Frank M, Zeljko I, David K, Kevin B, Lin Y, Mansi K, Matthew G, Nadia B, Nick S, John P, Patrick B, Tom P, Rahul B, Richard W, David S, Suvi G, Yutaro T, Todd B, Tiara H, Thomas K, Ulrich H, Umaa R, Angela VS, Chaoran Z (outdated: 29 Aug 2017)
  meeting time: Alternate Thursdays, 2 PM PT; Wednesdays 9am

Revision 422018-04-04 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Technical Working Groups

Changed:
<
<
High-level coordination among working groups is managed by general biweekly telecons, Mondays at 9 am Pacific time. Join the ztfgeneral mailing list for announcements and minutes.
>
>
ECB: Some of these working groups are no longer active now that science operations have begun (March 2018), but the email lists may still be of use for technical topics.
  General projects needing a champion are listed in AvailableTechnicalProjects.
Line: 26 to 25
 

Pipelines & Algorithms

mailing list: ztfpipelines@lists.astro.caltech.edu sign up here
Changed:
<
<
meeting time:
>
>
meeting time: Tuesdays 1pm Pacfic
  Frank (lead), Eran, Jakob, Peter, Robert, Russ, Dave Shupe, Adam, Mansi
  • image simulation & throughput testing
Line: 40 to 39
 mailing list: ztfml@lists.astro.caltech.edu sign up here Members on list: Ashish M, Anna H, Andy C, Adam M, Brian B, Chris C, Dave C, Dmitry D, Eric B, Frank M, Zeljko I, David K, Kevin B, Lin Y, Mansi K, Matthew G, Nadia B, Nick S, John P, Patrick B, Tom P, Rahul B, Richard W, David S, Suvi G, Yutaro T, Todd B, Tiara H, Thomas K, Ulrich H, Umaa R, Angela VS, Chaoran Z (outdated: 29 Aug 2017)
Changed:
<
<
meeting time: Alternate Thursdays, 2 PM PT
>
>
meeting time: Alternate Thursdays, 2 PM PT; Wednesdays 9am
  Ashish (lead), Umaa
  • Real/Bogus
  • classification
Deleted:
<
<
Near-term goals:
  • Classification of artifacts using zooniverse (lead: Richard Walters)
  • Real-bogus classification - preparing priors
 

Cadence & survey strategy group

mailing list: ztfcadence@lists.astro.caltech.edu sign up here
Line: 60 to 55
  Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi, Ashish, Lin
Deleted:
<
<
Near-term goals:
  • finalize collaboration surveys
 

QA group

mailing list: ztfqa@lists.astro.caltech.edu sign up here
Changed:
<
<
meeting time:
>
>
meeting time: Wednesdays, 11 am Pacific
 
Changed:
<
<
Thomas K (lead), Russ, Tom Barlow, Richard Walters
  • metrics & analysis; infrastructure for monitoring
  • efficiency calculations
  • measurement of PTF performance (batch & automated)

Medium-term goals:

  • Implement, verify, test
>
>
Angie van Sistine (lead)
 

Commissioning group

mailing list: ztfcommissioning@lists.astro.caltech.edu sign up here
Changed:
<
<
meeting time: Monday 9am (PT), 1st and 3rd Mondays of each month; next meeting: Monday August 21, 2017
>
>
meeting time:
 plans: Commissioning Activities

Matthew G (lead), Thomas K, Roger Smith, all Caltech personnel

Line: 89 to 75
 
  • Observation Planning
  • Requirements Verification
Deleted:
<
<
Medium-term goals:
  • develop performance verification plan
 

Marshals and Alert Stream

mailing list: ztfmarshal@lists.astro.caltech.edu sign up here
Line: 102 to 85
 Marshal Vision document Marshal Technical document
Deleted:
<
<
Near-term goals:
  • develop architecture design and outline development plan
 

[Operations group]

Tom Barlow, Richard Walters, Richard Dekany

Revision 412017-10-02 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
Changed:
<
<

Other Working Groups

>
>

Technical Working Groups

 
Added:
>
>
High-level coordination among working groups is managed by general biweekly telecons, Mondays at 9 am Pacific time. Join the ztfgeneral mailing list for announcements and minutes.
 
Changed:
<
<
* sign up here
>
>
General projects needing a champion are listed in AvailableTechnicalProjects.
 

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 53 to 54
 

Cadence & survey strategy group

mailing list: ztfcadence@lists.astro.caltech.edu sign up here
Added:
>
>
Twiki page: CadenceStudy. See also the ScienceWhitePapers used to define the partnership cadences.
 meeting time:

Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi, Ashish, Lin

Near-term goals:

Changed:
<
<
  • work on lightcurve/metrics studies [all]
  • code basic simulator [Eric]
>
>
  • finalize collaboration surveys
 

QA group

mailing list: ztfqa@lists.astro.caltech.edu sign up here

Revision 402017-10-02 - MatthewGraham

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
Changed:
<
<

ZTF SWG expression of interest

>
>

Other Working Groups

  * sign up here

Revision 392017-09-06 - SuviGezari

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ZTF SWG expression of interest

Line: 94 to 94
  meeting time:
Changed:
<
<
Brad (lead), Eric, Leo, Ofer, Mansi, Patrick Brady, Russ, Lin, Thomas, Quan-Zhi
>
>
Brad (lead), Eric, Leo, Ofer, Mansi, Patrick Brady, Russ, Lin, Thomas, Quan-Zhi, Suvi
  Marshal Vision document Marshal Technical document

Revision 382017-08-29 - AshishMahabal

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ZTF SWG expression of interest

Line: 36 to 36
 

Machine Learning

mailing list: ztfml@lists.astro.caltech.edu sign up here
Added:
>
>
Members on list: Ashish M, Anna H, Andy C, Adam M, Brian B, Chris C, Dave C, Dmitry D, Eric B, Frank M, Zeljko I, David K, Kevin B, Lin Y, Mansi K, Matthew G, Nadia B, Nick S, John P, Patrick B, Tom P, Rahul B, Richard W, David S, Suvi G, Yutaro T, Todd B, Tiara H, Thomas K, Ulrich H, Umaa R, Angela VS, Chaoran Z (outdated: 29 Aug 2017)
 
Changed:
<
<
meeting time:
>
>
meeting time: Alternate Thursdays, 2 PM PT
  Ashish (lead), Umaa
  • Real/Bogus
  • classification

Near-term goals:

Added:
>
>
  • Classification of artifacts using zooniverse (lead: Richard Walters)
  • Real-bogus classification - preparing priors
 

Cadence & survey strategy group

Revision 372017-08-14 - RichDekany

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ZTF SWG expression of interest

Line: 101 to 101
 

[Operations group]

Deleted:
<
<
Tom Barlow, Richard Walters
 \ No newline at end of file
Added:
>
>
Tom Barlow, Richard Walters, Richard Dekany
 \ No newline at end of file

Revision 362017-08-11 - FrankMasci

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ZTF SWG expression of interest

Line: 34 to 34
 
  • absolute & relative photometry
  • interfaces
Deleted:
<
<
Near-term goals:
  • think about how to allow team to contribute code, analysis [Frank]
  • PTFIDE vs ZOGY image differencing tests [Frank, Eran]
 

Machine Learning

mailing list: ztfml@lists.astro.caltech.edu sign up here

Revision 352017-08-10 - MatthewGraham

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
Added:
>
>

ZTF SWG expression of interest

* sign up here

 

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here

Revision 342017-08-07 - MatthewGraham

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 72 to 72
 

Commissioning group

mailing list: ztfcommissioning@lists.astro.caltech.edu sign up here
Changed:
<
<
meeting time: Monday 9am (PT), 1st and 3rd Mondays of each month; next meeting: Monday August 7, 2017
>
>
meeting time: Monday 9am (PT), 1st and 3rd Mondays of each month; next meeting: Monday August 21, 2017

plans: Commissioning Activities

  Matthew G (lead), Thomas K, Roger Smith, all Caltech personnel
  • Camera & Telescope

Revision 332017-08-03 - MatthewGraham

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Added:
>
>
meeting time:
 Jakob (lead)

  • atmosphere [Marek, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
Line: 17 to 19
 

Pipelines & Algorithms

mailing list: ztfpipelines@lists.astro.caltech.edu sign up here
Added:
>
>
meeting time:
 Frank (lead), Eran, Jakob, Peter, Robert, Russ, Dave Shupe, Adam, Mansi
  • image simulation & throughput testing
  • reference image generation
Line: 32 to 36
 

Machine Learning

mailing list: ztfml@lists.astro.caltech.edu sign up here
Added:
>
>
meeting time:
 Ashish (lead), Umaa
  • Real/Bogus
  • classification
Line: 42 to 48
 

Cadence & survey strategy group

mailing list: ztfcadence@lists.astro.caltech.edu sign up here
Added:
>
>
meeting time:
 Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi, Ashish, Lin

Near-term goals:

Line: 51 to 59
 

QA group

mailing list: ztfqa@lists.astro.caltech.edu sign up here
Added:
>
>
meeting time:
 Thomas K (lead), Russ, Tom Barlow, Richard Walters
  • metrics & analysis; infrastructure for monitoring
  • efficiency calculations
Line: 62 to 72
 

Commissioning group

mailing list: ztfcommissioning@lists.astro.caltech.edu sign up here
Added:
>
>
meeting time: Monday 9am (PT), 1st and 3rd Mondays of each month; next meeting: Monday August 7, 2017
 Matthew G (lead), Thomas K, Roger Smith, all Caltech personnel
  • Camera & Telescope
  • Pipelines
Line: 74 to 86
 

Marshals and Alert Stream

mailing list: ztfmarshal@lists.astro.caltech.edu sign up here
Added:
>
>
meeting time:
 Brad (lead), Eric, Leo, Ofer, Mansi, Patrick Brady, Russ, Lin, Thomas, Quan-Zhi

Marshal Vision document

Revision 322017-08-03 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 71 to 71
 Medium-term goals:
  • develop performance verification plan
Changed:
<
<

Marshals and User Interfaces

>
>

Marshals and Alert Stream

 mailing list: ztfmarshal@lists.astro.caltech.edu sign up here
Changed:
<
<
Eric, Leo, Ofer, Mansi, Patrick Brady, Russ, Brad, Lin, Thomas, Quan-Zhi
>
>
Brad (lead), Eric, Leo, Ofer, Mansi, Patrick Brady, Russ, Lin, Thomas, Quan-Zhi
  Marshal Vision document Marshal Technical document

Revision 312017-06-05 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 22 to 22
 
  • reference image generation
  • database testing
  • image differencing
Deleted:
<
<
  • Real Bogus [Pzremek, Umaa]
 
  • absolute & relative photometry
  • interfaces
Line: 30 to 29
 
  • think about how to allow team to contribute code, analysis [Frank]
  • PTFIDE vs ZOGY image differencing tests [Frank, Eran]
Added:
>
>

Machine Learning

mailing list: ztfml@lists.astro.caltech.edu sign up here

Ashish (lead), Umaa

  • Real/Bogus
  • classification

Near-term goals:

 

Cadence & survey strategy group

mailing list: ztfcadence@lists.astro.caltech.edu sign up here

Revision 302017-05-15 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 10 to 10
 
  • astrometry [Eran, Dave Shupe, Frank, Dmitri]
  • photometry [PS1-ZTF: Mickael, Peter, Frank, Russ]
Deleted:
<
<
Near-term goals:
  • specify requirements for flat field screen [Thomas K]
  • study what (if any) dedicated atmospheric monitoring is needed to reach desired precision [Ariel]
  • test dithered star flats vs. ZPVM with iPTF [Jakob]
 Medium-term goals:
Deleted:
<
<
  • develop calibration infrastructure to PS1 [in progress; document distributed], Gaia [done]
 
  • develop analysis to evaluate/remove scattered light contribution to the flats (dithered star flats correcting flat screen)
Added:
>
>
  • study what (if any) dedicated atmospheric monitoring is needed to reach desired precision [Ariel]
 

Pipelines & Algorithms

mailing list: ztfpipelines@lists.astro.caltech.edu sign up here
Line: 33 to 28
  Near-term goals:
  • think about how to allow team to contribute code, analysis [Frank]
Deleted:
<
<
  • performance analysis on iPTF
 
  • PTFIDE vs ZOGY image differencing tests [Frank, Eran]

Cadence & survey strategy group

Line: 42 to 36
 Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi, Ashish, Lin

Near-term goals:

Deleted:
<
<
  • get PTF->MAF working, give tutorial [Eric]
 
  • work on lightcurve/metrics studies [all]
  • code basic simulator [Eric]
Line: 54 to 47
 
  • efficiency calculations
  • measurement of PTF performance (batch & automated)
Changed:
<
<
Near-term goals:
  • develop work plan for developer
>
>
Medium-term goals:
  • Implement, verify, test
 

Commissioning group

mailing list: ztfcommissioning@lists.astro.caltech.edu sign up here
Changed:
<
<
Thomas K (lead), Roger Smith, all Caltech personnel
>
>
Matthew G (lead), Thomas K, Roger Smith, all Caltech personnel
 
  • Camera & Telescope
  • Pipelines
  • Observation Planning
Line: 72 to 65
 

Marshals and User Interfaces

mailing list: ztfmarshal@lists.astro.caltech.edu sign up here
Changed:
<
<
Yi (co-lead), Nadia (co-lead), Leo, Ofer, Mansi, Patrick Brady, Russ, Brad, Lin, Thomas, Quan-Zhi
>
>
Eric, Leo, Ofer, Mansi, Patrick Brady, Russ, Brad, Lin, Thomas, Quan-Zhi
  Marshal Vision document Marshal Technical document

Revision 292017-04-03 - QuanzhiYe

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 72 to 72
 

Marshals and User Interfaces

mailing list: ztfmarshal@lists.astro.caltech.edu sign up here
Changed:
<
<
Yi (co-lead), Nadia (co-lead), Leo, Ofer, Mansi, Patrick Brady, Russ, Brad, Lin
>
>
Yi (co-lead), Nadia (co-lead), Leo, Ofer, Mansi, Patrick Brady, Russ, Brad, Lin, Thomas, Quan-Zhi
  Marshal Vision document Marshal Technical document

Revision 282017-01-30 - FrankMasci

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 16 to 16
 
  • test dithered star flats vs. ZPVM with iPTF [Jakob]

Medium-term goals:

Changed:
<
<
  • develop calibration infrastructure to PS1, Gaia
>
>
  • develop calibration infrastructure to PS1 [in progress; document distributed], Gaia [done]
 
  • develop analysis to evaluate/remove scattered light contribution to the flats (dithered star flats correcting flat screen)

Pipelines & Algorithms

Revision 272016-12-02 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 36 to 36
 
  • performance analysis on iPTF
  • PTFIDE vs ZOGY image differencing tests [Frank, Eran]
Deleted:
<
<

Requirements generation

Eric (lead), Eran, Adam M, Frank

Near-term goals:

  • draft photometric error budget [Eric, Frank, Eran, Adam]
 

Cadence & survey strategy group

mailing list: ztfcadence@lists.astro.caltech.edu sign up here
Line: 86 to 80
 Near-term goals:
  • develop architecture design and outline development plan
Deleted:
<
<

[Meta group] (working group organization & infrastructure)

Eric (lead), Jakob, Patrick Brady, Marek
 

[Operations group]

Tom Barlow, Richard Walters
Deleted:
<
<

[Followup group]

Mansi
 \ No newline at end of file

Revision 262016-11-30 - YiCao

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 80 to 80
  Yi (co-lead), Nadia (co-lead), Leo, Ofer, Mansi, Patrick Brady, Russ, Brad, Lin
Changed:
<
<
Marshal document
>
>
Marshal Vision document Marshal Technical document
  Near-term goals:
  • develop architecture design and outline development plan

Revision 252016-10-20 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 78 to 78
 

Marshals and User Interfaces

mailing list: ztfmarshal@lists.astro.caltech.edu sign up here
Changed:
<
<
Leo, Ofer, Mansi, Patrick Brady, Russ, Brad, Lin, Nadia
>
>
Yi (co-lead), Nadia (co-lead), Leo, Ofer, Mansi, Patrick Brady, Russ, Brad, Lin
  Marshal document

Revision 242016-08-31 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Line: 32 to 32
 
  • interfaces

Near-term goals:

Deleted:
<
<
  • draft photometric error budget [Eric (Adam, Eran, Frank)]
 
  • think about how to allow team to contribute code, analysis [Frank]
  • performance analysis on iPTF
  • PTFIDE vs ZOGY image differencing tests [Frank, Eran]

Revision 232016-06-02 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Changed:
<
<
Jakub (lead)
>
>
Jakob (lead)
 
  • atmosphere [Marek, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
  • flat fields [Thomas K (flat screen lead), Daniel, Peter, Thomas K, Mickael]
Line: 13 to 13
 Near-term goals:
  • specify requirements for flat field screen [Thomas K]
  • study what (if any) dedicated atmospheric monitoring is needed to reach desired precision [Ariel]
Changed:
<
<
  • test dithered star flats vs. ZPVM with iPTF [Jakub]
>
>
  • test dithered star flats vs. ZPVM with iPTF [Jakob]
  Medium-term goals:
  • develop calibration infrastructure to PS1, Gaia

Revision 222016-06-01 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
Changed:
<
<
  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
>
>
Jakub (lead)

  • atmosphere [Marek, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
 
  • flat fields [Thomas K (flat screen lead), Daniel, Peter, Thomas K, Mickael]
  • astrometry [Eran, Dave Shupe, Frank, Dmitri]
  • photometry [PS1-ZTF: Mickael, Peter, Frank, Russ]
Line: 11 to 13
 Near-term goals:
  • specify requirements for flat field screen [Thomas K]
  • study what (if any) dedicated atmospheric monitoring is needed to reach desired precision [Ariel]
Changed:
<
<
  • improve automated astrometry in the Plane [Dave S]
>
>
  • test dithered star flats vs. ZPVM with iPTF [Jakub]
  Medium-term goals:
Changed:
<
<
  • R&D effort to improve distortion representation [Dave S, Frank]
  • develop calibration infrastructure to PS1
>
>
  • develop calibration infrastructure to PS1, Gaia
 
  • develop analysis to evaluate/remove scattered light contribution to the flats (dithered star flats correcting flat screen)

Pipelines & Algorithms

Line: 31 to 32
 
  • interfaces

Near-term goals:

Changed:
<
<
  • draft photometric requirements document [Eric (Adam, Eran, Frank)]
  • brainstorm ideas for improvement [all]
>
>
  • draft photometric error budget [Eric (Adam, Eran, Frank)]
 
  • think about how to allow team to contribute code, analysis [Frank]
  • performance analysis on iPTF
Added:
>
>
  • PTFIDE vs ZOGY image differencing tests [Frank, Eran]
 

Requirements generation

Eric (lead), Eran, Adam M, Frank

Near-term goals:

Changed:
<
<
  • draft photometric requirements document [Eric, Frank, Eran, Adam]
>
>
  • draft photometric error budget [Eric, Frank, Eran, Adam]
 

Cadence & survey strategy group

mailing list: ztfcadence@lists.astro.caltech.edu sign up here
Line: 55 to 57
 mailing list: ztfqa@lists.astro.caltech.edu sign up here

Thomas K (lead), Russ, Tom Barlow, Richard Walters

Changed:
<
<
  • autometric metrics & analysis; infrastructure for monitoring
>
>
  • metrics & analysis; infrastructure for monitoring
 
  • efficiency calculations
  • measurement of PTF performance (batch & automated)

Near-term goals:

Changed:
<
<
  • poll for information that should be included in central QA system [Thomas K]
>
>
  • develop work plan for developer
 

Commissioning group

mailing list: ztfcommissioning@lists.astro.caltech.edu sign up here
Changed:
<
<
Thomas K, Roger Smith, all Caltech personnel
>
>
Thomas K (lead), Roger Smith, all Caltech personnel
 
  • Camera & Telescope
  • Pipelines
  • Observation Planning
Line: 74 to 76
 Medium-term goals:
  • develop performance verification plan
Deleted:
<
<

Meta group (working group organization & infrastructure)

Eric (lead), Jakob, Patrick Brady, Marek
 

Marshals and User Interfaces

Changed:
<
<
Mansi, Russ, Brad, Lin, Nadia, Patrick Brady, Leo, Ofer
>
>
mailing list: ztfmarshal@lists.astro.caltech.edu sign up here

Leo, Ofer, Mansi, Patrick Brady, Russ, Brad, Lin, Nadia

  Marshal document

Near-term goals:

Changed:
<
<
  • think about what would be needed for a unified marshal
>
>
  • develop architecture design and outline development plan

[Meta group] (working group organization & infrastructure)

Eric (lead), Jakob, Patrick Brady, Marek
 

[Operations group]

Tom Barlow, Richard Walters

Revision 212016-05-25 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

Changed:
<
<
mailing list: ztfcalibration@astro.caltech.edu sign up here
>
>
mailing list: ztfcalibration@lists.astro.caltech.edu sign up here
 
  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
  • flat fields [Thomas K (flat screen lead), Daniel, Peter, Thomas K, Mickael]
Line: 19 to 19
 
  • develop analysis to evaluate/remove scattered light contribution to the flats (dithered star flats correcting flat screen)

Pipelines & Algorithms

Changed:
<
<
mailing list: ztfpipelines@astro.caltech.edu sign up here
>
>
mailing list: ztfpipelines@lists.astro.caltech.edu sign up here
  Frank (lead), Eran, Jakob, Peter, Robert, Russ, Dave Shupe, Adam, Mansi
  • image simulation & throughput testing
Line: 43 to 43
 
  • draft photometric requirements document [Eric, Frank, Eran, Adam]

Cadence & survey strategy group

Added:
>
>
mailing list: ztfcadence@lists.astro.caltech.edu sign up here
 Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi, Ashish, Lin

Near-term goals:

Line: 51 to 52
 
  • code basic simulator [Eric]

QA group

Changed:
<
<
mailing list: ztfqa@astro.caltech.edu sign up here
>
>
mailing list: ztfqa@lists.astro.caltech.edu sign up here
  Thomas K (lead), Russ, Tom Barlow, Richard Walters
  • autometric metrics & analysis; infrastructure for monitoring
Line: 62 to 63
 
  • poll for information that should be included in central QA system [Thomas K]

Commissioning group

Changed:
<
<
mailing list: ztfcommissioning@astro.caltech.edu sign up here
>
>
mailing list: ztfcommissioning@lists.astro.caltech.edu sign up here
  Thomas K, Roger Smith, all Caltech personnel
  • Camera & Telescope
Line: 77 to 78
 Eric (lead), Jakob, Patrick Brady, Marek

Marshals and User Interfaces

Changed:
<
<
Mansi, Russ, Brad, Lin, Nadia, Patrick Brady, Leo
>
>
Mansi, Russ, Brad, Lin, Nadia, Patrick Brady, Leo, Ofer
  Marshal document

Revision 202016-05-22 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@astro.caltech.edu sign up here
Line: 77 to 77
 Eric (lead), Jakob, Patrick Brady, Marek

Marshals and User Interfaces

Changed:
<
<
Mansi, Russ, Brad, Lin, Nadia
>
>
Mansi, Russ, Brad, Lin, Nadia, Patrick Brady, Leo
  Marshal document

Revision 192016-02-17 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@astro.caltech.edu sign up here
Line: 9 to 9
 
  • photometry [PS1-ZTF: Mickael, Peter, Frank, Russ]

Near-term goals:

Changed:
<
<
  • specify requirements for flat field screen, gather information on P60 implementation [Thomas K]
>
>
  • specify requirements for flat field screen [Thomas K]
 
  • study what (if any) dedicated atmospheric monitoring is needed to reach desired precision [Ariel]
  • improve automated astrometry in the Plane [Dave S]

Revision 182016-02-13 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@astro.caltech.edu sign up here
Line: 79 to 79
 

Marshals and User Interfaces

Mansi, Russ, Brad, Lin, Nadia
Changed:
<
<
Marshal document
>
>
Marshal document
  Near-term goals:
  • think about what would be needed for a unified marshal
Line: 89 to 89
 

[Followup group]

Mansi
Deleted:
<
<
META FILEATTACHMENT attachment="design.pdf" attr="" comment="" date="1454549784" name="design.pdf" path="design.pdf" size="116879" stream="design.pdf" user="Main.YiCao" version="1"

Revision 172016-02-04 - YiCao

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@astro.caltech.edu sign up here
Line: 79 to 79
 

Marshals and User Interfaces

Mansi, Russ, Brad, Lin, Nadia
Added:
>
>
Marshal document
 Near-term goals:
  • think about what would be needed for a unified marshal
Line: 87 to 89
 

[Followup group]

Mansi \ No newline at end of file
Added:
>
>
META FILEATTACHMENT attachment="design.pdf" attr="" comment="" date="1454549784" name="design.pdf" path="design.pdf" size="116879" stream="design.pdf" user="Main.YiCao" version="1"

Revision 162016-01-26 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@astro.caltech.edu sign up here
Line: 21 to 21
 

Pipelines & Algorithms

mailing list: ztfpipelines@astro.caltech.edu sign up here
Changed:
<
<
Frank, Eran, Jakob, Peter, Robert, Russ, Dave Shupe, Adam, Mansi
>
>
Frank (lead), Eran, Jakob, Peter, Robert, Russ, Dave Shupe, Adam, Mansi
 
  • image simulation & throughput testing
  • reference image generation
  • database testing
Line: 40 to 40
 Eric (lead), Eran, Adam M, Frank

Near-term goals:

Changed:
<
<
  • draft science requirements document [Eric]
>
>
  • draft photometric requirements document [Eric, Frank, Eran, Adam]
 

Cadence & survey strategy group

Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi, Ashish, Lin

Revision 152015-11-05 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@astro.caltech.edu sign up here
Line: 16 to 16
 Medium-term goals:
  • R&D effort to improve distortion representation [Dave S, Frank]
  • develop calibration infrastructure to PS1
Changed:
<
<
  • develop analysis to evaluate/remove scattered light contribution to the lfats
>
>
  • develop analysis to evaluate/remove scattered light contribution to the flats (dithered star flats correcting flat screen)
 

Pipelines & Algorithms

mailing list: ztfpipelines@astro.caltech.edu sign up here

Revision 142015-10-15 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@astro.caltech.edu sign up here
Line: 43 to 43
 
  • draft science requirements document [Eric]

Cadence & survey strategy group

Changed:
<
<
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi, Ashish
>
>
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi, Ashish, Lin
  Near-term goals:
  • get PTF->MAF working, give tutorial [Eric]

Revision 132015-10-15 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@astro.caltech.edu sign up here
Line: 43 to 43
 
  • draft science requirements document [Eric]

Cadence & survey strategy group

Changed:
<
<
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi
>
>
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi, Ashish
  Near-term goals:
  • get PTF->MAF working, give tutorial [Eric]
Line: 77 to 77
 Eric (lead), Jakob, Patrick Brady, Marek

Marshals and User Interfaces

Changed:
<
<
Mansi, Russ, Brad
>
>
Mansi, Russ, Brad, Lin, Nadia
  Near-term goals:
  • think about what would be needed for a unified marshal

Revision 122015-10-15 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

mailing list: ztfcalibration@astro.caltech.edu sign up here
Line: 8 to 8
 
  • astrometry [Eran, Dave Shupe, Frank, Dmitri]
  • photometry [PS1-ZTF: Mickael, Peter, Frank, Russ]
Added:
>
>
Near-term goals:
  • specify requirements for flat field screen, gather information on P60 implementation [Thomas K]
  • study what (if any) dedicated atmospheric monitoring is needed to reach desired precision [Ariel]
  • improve automated astrometry in the Plane [Dave S]

Medium-term goals:

  • R&D effort to improve distortion representation [Dave S, Frank]
  • develop calibration infrastructure to PS1
  • develop analysis to evaluate/remove scattered light contribution to the lfats
 

Pipelines & Algorithms

mailing list: ztfpipelines@astro.caltech.edu sign up here
Line: 20 to 30
 
  • absolute & relative photometry
  • interfaces
Added:
>
>
Near-term goals:
  • draft photometric requirements document [Eric (Adam, Eran, Frank)]
  • brainstorm ideas for improvement [all]
  • think about how to allow team to contribute code, analysis [Frank]
  • performance analysis on iPTF
 

Requirements generation

Eric (lead), Eran, Adam M, Frank
Added:
>
>
Near-term goals:
  • draft science requirements document [Eric]
 

Cadence & survey strategy group

Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi
Added:
>
>
Near-term goals:
  • get PTF->MAF working, give tutorial [Eric]
  • work on lightcurve/metrics studies [all]
  • code basic simulator [Eric]
 

QA group

mailing list: ztfqa@astro.caltech.edu sign up here
Line: 34 to 58
 
  • efficiency calculations
  • measurement of PTF performance (batch & automated)
Added:
>
>
Near-term goals:
  • poll for information that should be included in central QA system [Thomas K]
 

Commissioning group

mailing list: ztfcommissioning@astro.caltech.edu sign up here
Line: 44 to 70
 
  • Observation Planning
  • Requirements Verification
Added:
>
>
Medium-term goals:
  • develop performance verification plan
 

Meta group (working group organization & infrastructure)

Eric (lead), Jakob, Patrick Brady, Marek
Line: 51 to 79
 

Marshals and User Interfaces

Mansi, Russ, Brad
Added:
>
>
Near-term goals:
  • think about what would be needed for a unified marshal
 

[Operations group]

Tom Barlow, Richard Walters

Revision 112015-10-07 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

Added:
>
>
mailing list: ztfcalibration@astro.caltech.edu sign up here
 
  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
  • flat fields [Thomas K (flat screen lead), Daniel, Peter, Thomas K, Mickael]
  • astrometry [Eran, Dave Shupe, Frank, Dmitri]
  • photometry [PS1-ZTF: Mickael, Peter, Frank, Russ]

Pipelines & Algorithms

Changed:
<
<
mailing list: ztfpipelines@lists.astro.caltech.edu
>
>
mailing list: ztfpipelines@astro.caltech.edu sign up here
  Frank, Eran, Jakob, Peter, Robert, Russ, Dave Shupe, Adam, Mansi
  • image simulation & throughput testing
Line: 25 to 27
 Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi

QA group

Added:
>
>
mailing list: ztfqa@astro.caltech.edu sign up here
 Thomas K (lead), Russ, Tom Barlow, Richard Walters
  • autometric metrics & analysis; infrastructure for monitoring
  • efficiency calculations
Line: 32 to 36
 

Commissioning group

Added:
>
>
mailing list: ztfcommissioning@astro.caltech.edu sign up here
 Thomas K, Roger Smith, all Caltech personnel
  • Camera & Telescope
  • Pipelines

Revision 102015-10-06 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
Line: 7 to 7
 
  • photometry [PS1-ZTF: Mickael, Peter, Frank, Russ]

Pipelines & Algorithms

Changed:
<
<
Frank, Eran, Jakob, Peter, Robert, Russ, Adam, Mansi
>
>
mailing list: ztfpipelines@lists.astro.caltech.edu

Frank, Eran, Jakob, Peter, Robert, Russ, Dave Shupe, Adam, Mansi

 
  • image simulation & throughput testing
  • reference image generation
  • database testing

Revision 92015-10-05 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
Line: 16 to 16
 
  • absolute & relative photometry
  • interfaces
Added:
>
>

Requirements generation

Eric (lead), Eran, Adam M, Frank
 

Cadence & survey strategy group

Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi
Line: 38 to 40
 

Meta group (working group organization & infrastructure)

Eric (lead), Jakob, Patrick Brady, Marek
Changed:
<
<

User Interfaces

Gina, Mansi, Russ, Brad
>
>

Marshals and User Interfaces

Mansi, Russ, Brad
 

[Operations group]

Tom Barlow, Richard Walters

Revision 82015-10-01 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
Line: 7 to 7
 
  • photometry [PS1-ZTF: Mickael, Peter, Frank, Russ]

Pipelines & Algorithms

Changed:
<
<
Frank, Eran, Jakob, Peter, Robert, Russ, Adam
>
>
Frank, Eran, Jakob, Peter, Robert, Russ, Adam, Mansi
 
  • image simulation & throughput testing
  • reference image generation
  • database testing
Line: 18 to 18
 

Cadence & survey strategy group

Changed:
<
<
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Jan
>
>
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Mansi
 

QA group

Thomas K (lead), Russ, Tom Barlow, Richard Walters
Line: 39 to 39
 Eric (lead), Jakob, Patrick Brady, Marek

User Interfaces

Changed:
<
<
Gina, Mansi, Russ, Brad, Yan
>
>
Gina, Mansi, Russ, Brad
 

[Operations group]

Tom Barlow, Richard Walters

[Followup group]

Deleted:
<
<
Mansi, Yan
 \ No newline at end of file
Added:
>
>
Mansi
 \ No newline at end of file

Revision 72015-09-30 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
Line: 7 to 7
 
  • photometry [PS1-ZTF: Mickael, Peter, Frank, Russ]

Pipelines & Algorithms

Changed:
<
<
Frank, Eran, Jakob, Peter, Robert, Russ
>
>
Frank, Eran, Jakob, Peter, Robert, Russ, Adam
 
  • image simulation & throughput testing
  • reference image generation
  • database testing

Revision 62015-09-30 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
Changed:
<
<
  • flat fields [Daniel, Peter, Thomas K, Mickael]
>
>
  • flat fields [Thomas K (flat screen lead), Daniel, Peter, Thomas K, Mickael]
 
  • astrometry [Eran, Dave Shupe, Frank, Dmitri]
  • photometry [PS1-ZTF: Mickael, Peter, Frank, Russ]

Revision 52015-09-23 - EricBellm

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
Line: 18 to 18
 

Cadence & survey strategy group

Changed:
<
<
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Yan
>
>
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Jan
 

QA group

Thomas K (lead), Russ, Tom Barlow, Richard Walters

Revision 42015-09-18 - LinYan

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
Line: 18 to 18
 

Cadence & survey strategy group

Changed:
<
<
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad
>
>
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad, Yan
 

QA group

Thomas K (lead), Russ, Tom Barlow, Richard Walters
Line: 39 to 39
 Eric (lead), Jakob, Patrick Brady, Marek

User Interfaces

Changed:
<
<
Gina, Mansi, Russ, Brad
>
>
Gina, Mansi, Russ, Brad,Yan
 

[Operations group]

Tom Barlow, Richard Walters

[Followup group]

Deleted:
<
<
Mansi
 \ No newline at end of file
Added:
>
>
Mansi, Yan
 \ No newline at end of file

Revision 32015-09-18 - BradCenko

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

Calibration

  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
Line: 18 to 18
 

Cadence & survey strategy group

Changed:
<
<
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group]
>
>
Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group], Brad
 

QA group

Thomas K (lead), Russ, Tom Barlow, Richard Walters
Line: 39 to 39
 Eric (lead), Jakob, Patrick Brady, Marek

User Interfaces

Changed:
<
<
Gina, Mansi, Russ
>
>
Gina, Mansi, Russ, Brad
 

[Operations group]

Tom Barlow, Richard Walters

Revision 22015-09-18 - RussLaher

Line: 1 to 1
 
META TOPICPARENT name="WebHome"
Deleted:
<
<
 

Calibration

  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
  • flat fields [Daniel, Peter, Thomas K, Mickael]
Line: 6 to 4
 
  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
  • flat fields [Daniel, Peter, Thomas K, Mickael]
  • astrometry [Eran, Dave Shupe, Frank, Dmitri]
Changed:
<
<
  • photometry [PS1-ZTF: Mickael, Peter, Frank]
>
>
  • photometry [PS1-ZTF: Mickael, Peter, Frank, Russ]
 

Pipelines & Algorithms

Changed:
<
<
Frank, Eran, Jakob, Peter, Robert
>
>
Frank, Eran, Jakob, Peter, Robert, Russ
 
  • image simulation & throughput testing
  • reference image generation
  • database testing
Line: 41 to 39
 Eric (lead), Jakob, Patrick Brady, Marek

User Interfaces

Changed:
<
<
Gina, Mansi
>
>
Gina, Mansi, Russ
 

[Operations group]

Tom Barlow, Richard Walters

Revision 12015-09-18 - EricBellm

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"

Calibration

  • atmosphere [MAREK, Shri (h20), Goobar (aerosol), Nadia (SEDM)]
  • flat fields [Daniel, Peter, Thomas K, Mickael]
  • astrometry [Eran, Dave Shupe, Frank, Dmitri]
  • photometry [PS1-ZTF: Mickael, Peter, Frank]

Pipelines & Algorithms

Frank, Eran, Jakob, Peter, Robert
  • image simulation & throughput testing
  • reference image generation
  • database testing
  • image differencing
  • Real Bogus [Pzremek, Umaa]
  • absolute & relative photometry
  • interfaces

Cadence & survey strategy group

Eric (lead), Eran, Ariel, Danny, Rahman, Uli, Peter [LBL optimization group]

QA group

Thomas K (lead), Russ, Tom Barlow, Richard Walters
  • autometric metrics & analysis; infrastructure for monitoring
  • efficiency calculations
  • measurement of PTF performance (batch & automated)

Commissioning group

Thomas K, Roger Smith, all Caltech personnel
  • Camera & Telescope
  • Pipelines
  • Observation Planning
  • Requirements Verification

Meta group (working group organization & infrastructure)

Eric (lead), Jakob, Patrick Brady, Marek

User Interfaces

Gina, Mansi

[Operations group]

Tom Barlow, Richard Walters

[Followup group]

Mansi
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback