Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
Technical Projects Needing a Champion* optimize/regularize inputs for ZOGY algorithm; test on iPTF data; in progress and looking better! See latest PTF testing with test products (contacts: Frank & Brad) | ||||||||
Changed: | ||||||||
< < | * contingent on ZOGY performance: research real-bogus classification schemes for point source transients: simple filtering vs machine-learning (contact: Frank) | |||||||
> > | * contingent on ZOGY performance: research real-bogus classification schemes for point source transients: simple filtering vs machine-learning (contact: Frank; Tom Prince to ask JPL team for inputs) | |||||||
* look at proposed pointing grid and evaluate chip gaps, local galaxy positions, Galactic Plane, sufficient calibration information (at chip level) to enable good astrometric and photometric calibration using Gaia and PS1 respectively... (contact: Eric) | ||||||||
Line: 12 to 12 | ||||||||
* flat-fielding tests with new dome screen and lamps that we are about to start building (contact: Thomas) | ||||||||
Changed: | ||||||||
< < | * low-priority: a better streak detector for finding fast-moving objects in individual exposures; e.g., Hough or Radon transform (contact: Frank) | |||||||
> > | * | |||||||
* additional pipeline software modules following detector/optical system characterization; masking of ghosts (see PTF strategy); bright source halos; diffraction spikes; bleeds, other? (contact: Frank) |