PFS Production

Dropbox\PFS_Production\Cobra Database

  • MS access file contains all receiving inspection data for production units (version 2 as of April 6)
  • This folder also contains User's manual for this database.

Dropbox\PFS_Production\Production Procedures

  • Station1: Procedure from receiving shipping notification from NST, receiving boxes, storing Cobras
  • Station2: Procedure for performing receiving inspection on Cobras

Overview of work flow

  1. Receiving FedEx notification from NST
  2. In basecamp, NST uploads motor map data for the Cobras they went
  3. Download zipped NST data and save under Dropbox\PFS_Production\NST_FinalReports.
  4. Right click on the downloaded zipped file and select "Expand all". Choose default location and name
  5. In Matlab, run the script:
     readXLSwriteXML for now.  Probably need new name 
    Select the folder that you just created in previous step with all NST data. At the end, choose file name along the convention, NSTdata_mm_dd_yyyy.xml. This will also create ontime table with the same name from all the NST data. This script can handle up to 58 Cobras.
  6. Import the ontime NST data to Access. Refer to User's manual for the database, "Importing NST duration data" for details.
  7. Enter all serial numbers in database using Receiving Form. Refer to User's manual of database "Using Receiving Form" for details.
  8. Receive the shipping boxes from NST. Follow Station 0 procedure to open the box, deal with packing slips and store Cobras.
  9. Follow Station 1 procedure to perform receiving inspection for all Cobras and decide if they are accepted or rejected
  • Any failed or out of norm observations images to be saved under folders: Dropbox\PFS_Production\Failed Receiving Inspection\77diameter, Dropbox\PFS_Production\Failed Receiving Inspection\Stage2 Contamination, or Dropbox\PFS_Production\Failed Receiving Inspection\YourCobra'sSerialNumber
  1. Enter receiving inspection data into database. Refer to Database user's manual, "Entering data for receiving inspection" chapter.
  2. Create report for NST. Newly open NewScaleReportDetails to see all serial numbers with out of norm observations. Communicate the results to NST.
  3. For rejected Cobras, ask for RMA and then send them back to NST with necessary paperwork.
  4. Open QryReportOntimeTracking and export to excel to perform ontime analysis

How to run production Testbed

-- MitsukoRoberts - 06 Apr 2016
Edit | Attach | Watch | Print version | History: r15 | r8 < r7 < r6 < r5 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r6 - 2016-04-15 - MitsukoRoberts
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback