---+ ZTFC Work Breakdown Structure ---+++++ !WBS * Science * Management * Systems Engineering * System Architecture Document * Instrument Requirements Document (IRD) * Systems Analyses * Survey Sensitivity Analyses * Delivered Image Quality (DIQ) Budget * Mass Budget * Power and Thermal Budgets * Subsystem Requirements Documents (SuRDs) * Interface Control Documents (ICDs) * Alignment Plan * Calibration Plan * Verification Plan * Compliance Matrices * Software Requirements Document (SoRD) * Commissioning Plan * Collaborative Online Environment (TWiki) * Document Control System * Non-deliverable Calibration Equipment * System Verification * Camera * ZTFC Focal Plane Array * ZTFC Cryostat * Exposure Shutter * Filter Exchanger * Detector Control Electronics * Instrument Electronics * Software * Conceptual Software Design * Software Architecture Document * Preliminary Software Design * Software Design Document * Detailed Software Design * Instrument Software * Software Test Reports * Accessories * Assembly, Integration, and Verification (AIV) * Observatory Infrastructure * Commissioning
This topic: Palomar/ZTF
>
WebHome
>
WBS
Topic revision: r1 - 2012-05-16 - RichardDekany
Copyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback