---+!! Commissioning Plans ---++ Outline: Through a series of observing runs, characterize the instrument and develop and test the automated operation. ---+++ Current Major Items: * Calibration Lamps: current system requires intensive human involvement (Don, Jeff) * DRP wavelengths: achieve an acceptable wavelength solution and specify the calibration lamps required to achieve this (Don) * RC photometry: develop photometry pipeline (Nadia) * Instrument Control: achieve operational robustness (Richard Walters) * Instrument Throughput: characterize both spectroscopic and photometric throughputs (Don, Nadia) * Operational Efficiency: characterize procedures that will optimize target observing (Don, Nadia, Richard) ---+++ Commissioning Reports: * [[%ATTACHURL%/SEDMCommissioningReport01.docx][SEDM Commissioning Report01]] -- Main.DonNeill - 19 Nov 2015
Attachments
Attachments
Topic attachments
I
Attachment
History
Action
Size
Date
Who
Comment
docx
SEDMCommissioningReport01.docx
r1
manage
155.9 K
2015-11-19 - 12:47
DonNeill
SEDM Commissioning Report 01
This topic: Palomar/SEDM
>
WebHome
>
CommissioningPlans
Topic revision: r1 - 2015-11-19 - DonNeill
Copyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback