October 11 13, 2006 LGS Engineering Run Project schedules and task lists task schedule, v1 A. Bouchez 10/2/06 Oct. engineering run personnel schedule...
Cabling and Data Transfer by Anna Moore and John Henning The following summarises the current cabling installed on the 200inch telescope. We describe how signals from...
Solidworks Models of the LLT bench by Anna Moore and Hal Petrie Externally supplied SW part models of components Newport U100 A2K NL.SLDPRT: Newport 1` kinematic...
PALAO bench subsystem The PALAO bench is placed onto the 200` Hale telescope at the Cassegrain focus and contains (1) the science instrument; (2) the adaptive optics...
LGS AO Library LGS AO system characterization Dam et al. 2006, The W.M. Keck Observatory laser guide star adaptive optics system: Performance characterization...
Spie2006 Orlando, 24 31 May 2006 Presentations and posters spie06 palomarlgs.pdf: Bouchez et al., Laser Guide Star Adaptive Optics at Palomar Observatory,...
05/16/06 Experiments and Analysis Conclusions I suggest replacing the M2 mirror with an enhanced aluminum version, such as CVI part EAV PM 4050 C ($730). This will...
All, I just returned from a long day at Palomar. Here`s what I got done on the BtO: (I will also post this on the TWiki site BtO page...) 1. Checked stability and...
CSFL upgrade purchase list: 1. Coarse Filter parts : a. Filter enclosure : Mc Master CArr # 6882K1 Bttm Load Hi Purity Single Cartridge Housing for 9 3/4 To...
Vendor list Non linear Crystal databaseDocument Actions last edited 3 months ago by abouchez Conex systems, Inc. San Ramon, CA Ph: 925 735 8825 Contact Ting...