Tags:
create new tag
view all tags

Recent Changes in Palomar/PalmLGS Web retrieved at 10:39 (GMT)

October 11 13, 2006 LGS Engineering Run Project schedules and task lists task schedule, v1 A. Bouchez 10/2/06 Oct. engineering run personnel schedule...
Cabling and Data Transfer by Anna Moore and John Henning The following summarises the current cabling installed on the 200inch telescope. We describe how signals from...
Components for the data communcation by Anna Moore and John Henning AnnaMoore 30 Sep 2006
Zemax Models of the Coude bench AnnaMoore 28 Sep 2006
Solidworks Models of the LLT bench by Anna Moore and Hal Petrie Externally supplied SW part models of components Newport U100 A2K NL.SLDPRT: Newport 1` kinematic...
Palomar Science Meeting 2006 Presentations PALAO LGS Science meeting CS.ppt: AO presentation part 1 C. Shelton PALAO LGS Science meeting AB.ppt: AO presentation...
OIR 1 Project Publications Available Information SPIE Conference #5490, Glassgow, Scotland, U.K. (2004) SPIE Conference #6272, Orlando, FL, U.S.A (...
July 11 13, 2006 LGS Engineering Run Project schedules and task lists plan for new CSFL etalons LGS IPT meeting minutes Safety documents letter of...
PALAO bench subsystem The PALAO bench is placed onto the 200` Hale telescope at the Cassegrain focus and contains (1) the science instrument; (2) the adaptive optics...
LGS AO Library LGS AO system characterization Dam et al. 2006, The W.M. Keck Observatory laser guide star adaptive optics system: Performance characterization...
Astronomical Telescopes and Instrumentation 2006 mgsu paper.pdf: Velur et al., Multiple Guide Star Unit: Palomar`s Tomograph, 6272 188 (preprint). MGSU poster...
Spie2006 Orlando, 24 31 May 2006 Presentations and posters spie06 palomarlgs.pdf: Bouchez et al., Laser Guide Star Adaptive Optics at Palomar Observatory,...
05/16/06 Experiments and Analysis Conclusions I suggest replacing the M2 mirror with an enhanced aluminum version, such as CVI part EAV PM 4050 C ($730). This will...
Version 2 (5:15pm, 6/2/06) Monday 6/5 0800 AB arrives at Palomar 0800 1000 AB: Complete BTO breadboard setup and 660nm laser alignment. 1000 CS arrives at Palomar...
All, I just returned from a long day at Palomar. Here`s what I got done on the BtO: (I will also post this on the TWiki site BtO page...) 1. Checked stability and...
Chicago Sum Frequency Laser CSFL upgrade CSFL operational documents
Testing 1, 2, 3.... AntoninBouchez 02 Jun 2006
CSFL upgrade purchase list: 1. Coarse Filter parts : a. Filter enclosure : Mc Master CArr # 6882K1 Bttm Load Hi Purity Single Cartridge Housing for 9 3/4 To...
ViswaVelur 13 May 2006 Optics.xls: Optics inventory EEC, VNV 5/12/06 Inventory.xls: General inventory (sans optics) EEC, VNV 5/12/06
Vendor list Non linear Crystal databaseDocument Actions last edited 3 months ago by abouchez Conex systems, Inc. San Ramon, CA Ph: 925 735 8825 Contact Ting...

«Previous   1  2  3  4  5  6   Next»

Show 10, 20, 50, 100, 500, 1000 results per page, or show all.

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2005-03-28 - TWikiContributor
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback