Oct. 9, 2009 UT LCROSS Impact Imaging

Contact Information

Schedule (Times UT, updated 10/6/09)

  • ~02:00 Spacecraft separation
  • 08:30 Acquire moon; determine best feature to use for AO lock
  • 10:30 Begin impact imaging sequence
  • 11:31:19 Centaur impact
  • 11:35:45 Shepherding spacecraft impact
  • 12:00 End impact imaging sequence
  • 14:00 NASA ARC press conference (submit graphics by 12:30)

Finder Charts

PHARO 40" field overlaid on NASA GSFC visualization as seen from Palomar. pharo_field.png

Ephemeris, Timelines, Etc.

  • Range to impact site is 3.66936 x 10^5 km.
    • 40" field of view = 71.2 km.
    • .10" resolution = 178 m.
  • cabeus_ephem.txt: Ephemeris for moon lat: 310.95, lon: -84.70, alt:0 km.

Links

Topic attachments
I Attachment History Action Size Date Who Comment
Microsoft Excel Spreadsheetxls LCROSS_Observation_Campaign_Timeline_6Oct.xls r1 manage 20.5 K 2009-10-07 - 05:41 UnknownUser  
Microsoft Word filedoc LCROSS_Observatory_Status_Sheet_6Oct.doc r1 manage 43.5 K 2009-10-07 - 05:41 UnknownUser  
Texttxt cabeus_ephem.txt r1 manage 29.1 K 2009-10-07 - 00:00 UnknownUser  
PNGpng pharo_field.png r1 manage 786.5 K 2009-10-07 - 20:30 UnknownUser  
Edit | Attach | Watch | Print version | History: r9 | r6 < r5 < r4 < r3 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r4 - 2009-10-07 - AntoninBouchez
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback