September 18-21, 2007 LGS observing run

Night logs and results

Safety documents

Personnel and engineering schedules

  Tue 9/18 Wed 9/19 Thu 9/20 Fri 9/21
Angione X      
Bouchez X   X X
Cromer X X X X
Roberts X   X X
Tripathi X   X X

Procedures and test plans

Please post your test plans on the Test Plan Library page, and add a link below.
  • AO setup
    • AO system internal focus: doc, pdf
    • AO bench setup and checkout: doc, pdf
  • BTO setup
    • BTO setup (v2.4): doc, pdf
    • BTO alignment (v2.4): doc, pdf
    • BTO alignment, abbreviated version (v1.0): doc, pdf
    • BTO shutdown (v1.1): doc, pdf
  • Observing procedures:
    • NGS Checkout (v3.1): doc, pdf
    • LGS Checkout (v1.0): doc, pdf
    • LGS target acquisition (v4.0): doc, pdf
  • Engineering experiments:
    • AO Optimization on the laser at zenith: doc, pdf
    • Low-order loop optimization: doc, pdf

Topic attachments
I Attachment History Action Size Date Who Comment
Texttxt PMR-palomar070919.txt r1 manage 13.9 K 2007-09-17 - 16:28 UnknownUser  
Texttxt PMR-palomar070921.txt r1 manage 11.7 K 2007-09-17 - 18:44 UnknownUser  
Texttxt PMR-palomar070922.txt r1 manage 11.7 K 2007-09-17 - 18:44 UnknownUser  
PDFpdf palm_lgs_log_070919.pdf r1 manage 29.8 K 2007-09-21 - 04:52 UnknownUser  
Edit | Attach | Watch | Print version | History: r10 < r9 < r8 < r7 < r6 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r7 - 2007-09-21 - AntoninBouchez
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback