July 23-28, 2007 LGS observing run

Safety documents

Schedules

  • Personnel Schedule:
  • Engineering Schedule:

Procedures and test plans

Please post your test plans on the Test Plan Library page, and add a link below.
  • AO setup
    • AO system internal focus: doc, pdf
    • AO bench setup and checkout: doc, pdf
  • BTO setup
    • BTO setup (v2.1): doc, pdf
    • BTO alignment: doc (v2.1), pdf (v2.2!)
    • BTO shutdown (v1.1): doc, pdf
  • Observing procedures:
    • NGS Checkout (v3.1): doc, pdf
    • Laser Acquisition (v5.1): doc, pdf
    • LGS target acquisition (v3.4): doc, pdf
  • Engineering experiments:
    • AO Optimization on the laser at zenith: doc, pdf
    • Low-order loop optimization: doc, pdf

Night logs and results

Edit | Attach | Watch | Print version | History: r17 | r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2007-06-22 - AntoninBouchez
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback