April 2-6, 2007 LGS observing run
Safety documents
- FAA documents:
- US-STRATCOM documents:
Target lists and finder charts
Schedules
- Personnel Schedule: v2 (3/21)
- Engineering Schedule:
Test Plans
Please post your test plans on the
Test Plan Library page, and add a link below.
- BTO Setup: doc, pdf
- BTO Shutdown: doc, pdf
- NGS Checkout: doc,pdf
- Acquisition camera platescale calibration: doc, pdf
- AO system internal focus: doc, pdf
- AO bench setup and checkout: doc, pdf
- Laser Acquisition: doc, pdf
- AO Optimization on the laser at zenith: doc, pdf
- LGS target acquisition (v3.3): doc, pdf
- LOWFS field curvature: doc
Night logs and results
4/3/07 UT
Thick to patchy high clouds and excellent seeing (~0.75" in V). Boresighted LLT and checked image quality (<1.2" FWHM stars, ~1.6" FWHM LGS). Much debugging of laser and BTO. Major problems with the AO telemetry system. Debugged acquisition procedures and achieved K Strehl=24% on a bright LGS target despite clouds and low laser power (4-5 W).
Night log (pdf)