Beam Transfer Optics

The beam transfer optics subsystem delivers the 589nm laser beam from the Coude lab to the laser launch telescope located behind the Hale telescope secondary. It consists of actively controlled reflective, refractive, and polarization optics.

Reference Documents

Development Notes

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf 060514_palomar_notes.pdf r1 manage 52.2 K 2006-05-15 - 16:21 UnknownUser Notes on 05/14/06 Palomar BTO work - A. Bouchez
Texttxt 060602_bto_tasks.txt r1 manage 4.9 K 2006-06-02 - 18:12 UnknownUser BTO tasks - C. Shelton 06/02/06
Microsoft Word filedoc 060606_bto_update.doc r1 manage 200.5 K 2006-06-08 - 05:07 UnknownUser Description of BTO work June 5-6, 2006 - AB 6/7/06
Microsoft Word filedoc 060606_bto_update_v2.doc r1 manage 161.5 K 2006-06-08 - 18:03 UnknownUser Description of BTO work June 5-6, 2006 v2- CS 6/8/06
Unknown file formatdat 060612_dec_table.dat r1 manage 7.0 K 2006-06-19 - 16:56 UnknownUser BTO meridian look-up table - A. Bouchez 6/19/06
PNGpng 060612_dec_table.png r1 manage 10.4 K 2006-06-19 - 16:57 UnknownUser plot of 6/12/06 meridian look-up table values - A. Bouchez 6/19/06
PDFpdf BTO_Software_Operating_Manual.pdf r1 manage 66.6 K 2006-06-15 - 02:33 UnknownUser  
Texttxt BTO_laser_combining.txt r1 manage 3.0 K 2006-06-04 - 22:34 UnknownUser  
JPEGjpg Slide1.jpg r1 manage 60.6 K 2006-06-04 - 19:25 UnknownUser BTO stimulus package 6/1/06 - A. Bouchez, 6/4/06
PNGpng bto_594_breadboard.png r1 manage 614.3 K 2006-07-27 - 19:04 UnknownUser BTO 594nm breadboard - A. Bouchez 7/26/06
PDFpdf bto_cleaning_log.pdf r1 manage 59.0 K 2007-02-22 - 04:47 UnknownUser BTO cleaning log - A. Bouchez 2/21/07
Microsoft Excel Spreadsheetxls bto_control_v10.xls r1 manage 25.0 K 2006-06-04 - 21:55 UnknownUser BTO trolley position spreadsheet v10 - AB for C. Shelton 6/4/06
PDFpdf bto_control_v11.pdf r1 manage 510.7 K 2006-06-04 - 22:09 UnknownUser BTO control math v11 - AB for C. Shelton 6/4/06
JPEGjpg bto_stim_060601.jpg r1 manage 61.9 K 2006-06-08 - 00:16 UnknownUser BTO stimulus package 6/1/06 - A. Bouchez, 6/4/06
JPEGjpg bto_stim_060606.jpg r1 manage 61.9 K 2006-06-08 - 00:18 UnknownUser BTO stimulus package v2 6/6/06 - A. Bouchez, 6/7/06
PDFpdf cin606_btotrans_v1.pdf r1 manage 89.9 K 2006-07-28 - 00:43 UnknownUser Palomar Beam Transfer Optics Transmission - A. Bouchez 7/27/06
PDFpdf cin606_btotrans_v2.pdf r1 manage 104.0 K 2006-08-07 - 17:00 UnknownUser Palomar Beam Transfer Optics Transmission - A. Bouchez 8/7/06
PDFpdf cin609_laserdiag_v10.pdf r1 manage 30.6 K 2006-08-08 - 06:39 UnknownUser Palomar laser diagnostics requirements - A. Bouchez 8/7/06
Microsoft Word filedoc cin613_bto_calibration.doc r1 manage 182.0 K 2006-10-30 - 20:32 UnknownUser CIN613: Beam Transfer Optics Off-zenith Calibration
PDFpdf cin613_bto_calibration.pdf r1 manage 172.7 K 2006-10-30 - 20:32 UnknownUser CIN613: Beam Transfer Optics Off-zenith Calibration
Texttxt laser_focus_and_pol.txt r1 manage 1.2 K 2006-06-04 - 22:29 UnknownUser Laser focus travel limits - AB for C. Shelton 6/4/06
Edit | Attach | Watch | Print version | History: r18 < r17 < r16 < r15 < r14 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r15 - 2007-02-22 - AntoninBouchez
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback