Version 2 (5:15pm, 6/2/06) Monday 6/5 0800 - AB arrives at Palomar<br> 0800-1000 - AB: Complete BTO breadboard setup and 660nm laser alignment.<br> 1000 - CS arrives at Palomar<br> 1000-1300 - AB, CS: Test BTO signal levels, telescope at zenith (need Coude port unlocked by 10am).<br> 1200 - JA arrives at Palomar<br> 1300-1500 - AB, CS: Improve Q2 alignment and baffling (need a crane operator for 2hr anytime after lunch).<br> 1500-1800 - AB, CS, JA: Test BTO servo loop with telescope moves (Rick will operate telescope)<br> eve. - AB, CS, JA: Finalize dual-beam BTO control strategy.<br> Tuesday 6/6 0900 - VV arrives at Palomar<br> 0900-1000 - LGS IPT meeting.<br> 1000-1100 - VV: Start up CSFL at low power for Coude lab BTO tests.<br> 1000-1300 - JA: Work on BTO software. <br> 1100-1300 - VV, AB, CS: Align CSFL to BTO, measure polarization.<br> 1300 - AB, JA return to Pasadena<br> 1300-eve. - VV: Install NLX pressure control hardware.<br> 1300-eve. - CS: Finish up BTO work.<br> Wednesday 6/7 CS return to Pasadena.<br> EK arrives at Palomar.<br> -- Main.AntoninBouchez - 02 Jun 2006
This topic: Palomar/PalmLGS
>
060506_bto_sched
Topic revision: r1 - 2006-06-03 - AntoninBouchez
Copyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback