Tags:
create new tag
view all tags

Recent Changes in Keck/NGAO Web retrieved at 18:56 (GMT)

NGAO Systems Engineering Group Twiki Page A. Mini Design Reviews Actions Lists This list tracks outstanding action items from the PD phase NGAO mini reviews...
NGAO Opto Mechanics Mini Design Review, November 17, 2009 NOTE CHANGE The review date has been changed to November 17 to allow more time for the reviewers to read...
SW Architecture Review, August 24, 2009 Review Documents: Charter Requirements Design on Middleware Supplementary Material: KAON 671: NGAO...
NGAO Laser Guide Star Facility Main.Jason Chin Originated 29 Oct 2009 Laser Launch Facility Mini Review Final Review Report: KAON 689 NGAO Laser Launch...
NGAO Real Time Controller Mini Design Review, December 2009 Telecon: 877 280 4645 room 540030 Video: 128.114.22.14 Review Schedule Design group posts material...
Keck NGAO PD Phase LGS WFS Mini Review 10:00a 02:00p PDT 08:00a 12:00p HST Monday, December 7, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode...
Design Standards: 484 Optical Design Practices for NGAO Exporting Zemax as a STEP file: Zemax Export Screen Snapshot Zemax files can be imported to Solidworks...
LO WFS PD mini review 11:00a 03:00p PDT 08:00a 12:00p HST Friday, April 2, 2010 Tele/Videoconference Conference Room direct #: 626 395 8884 or 626 395...
Alignment, Calibration Performance Monitoring PD mini review 11:00a 03:00p PDT 08:00a 12:00p HST Tuesday, April 20, 2010 Tele/Videoconference Conference...
NGAO Motion Control Architecture Mini Design Review, 11 March 2010 Review Schedule Material to web site: 4 Mar Response from reviewers due: end of day...
NGAO Electronics Architecture Mini Design Review, 26 January 2010 Review Schedule Material to web site: 15 Jan Response from reviewers due: end of day...
NGAO System Architecture WBS 3.1.3 Work Package Schedule Subsystem Evaluation Criteria Form.xls. Please use this form when performing your subsystem evaluations...
NGAO Performance Flowdown Worksheets A performance flowdown is the allocation of error terms to constituent subsystems or components Update (4/25/10): The performance...
NGAO Wavefront Error Budget Current Content WFE budget documentation WFE budget tool outline overview.pdf: Initial draft of outline form of spreadsheet...
Opto Mechanical Design LOWFS and HOWFS Design Real Time Control Design Supervisory Control Design Acquisition System Design Alignment, Calibration...
NGAO Alignment, Calibration, and Diagnostics mini review Questions and comments from Jim Lyke Responses from Peter in italics. KAON 719 Alignment Plan Sec....
Keck NGAO PD Phase NGS WFS Mini Review 11:00a 03:00p PDT 08:00a 12:00p HST April 1st, 2010 Tele/Videoconference Dial in Number:626 395 8884 Videoconference...
Control Systems Software Preliminary Design Work 2010apr16 Control Systems Software Mini Review
PD Phase Functional Requirements PD Requirements Review Phase II March 2010 Goals The NGAO project will finalize the System and Functional requirements over the...
Working files for 102018 interface meeting Slightly tweeked version of Reni`s layout v9 ZMX Output science fold mirror tilt opened by 5 degrees (from...

«Previous   1  2  3  4  5  6  7  8  9  10  11   Next»

Show 10, 20, 50, 100, 500, 1000 results per page, or show all.

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2005-03-28 - TWikiContributor
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback