LGS pentagon asterism 20` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 10` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 60` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 50` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 40` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 30` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 60` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) GS triangle asterism...
LGS triangle asterism 50` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 40` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 30` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 20` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
Keck NGAO PD Team Meeting #4 10:00a 1:45p PST 8:00a 11:45a HST Friday, December 19, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
NGAO Observing Scenarios Information This page is used to summarize the work for the observing scenarios. The observing scenarios and example observations are used...
Keck NGAO PD Team Meeting #3 9:00a 6:00p PST on Sept. 11; 9:00a 5:00p on Sept. 12. 6:00a 3:00p HST on Sept. 11; 6:00a 2:00p on Sept. 12. Thursday and Friday...
Transmission and Background Budget pages Documents 501: NGAO Background and Transmission Budgets: AHB 8/28/07 Old versions: v1.0 (8/8/07) Modeling software...
This collection is for maintaining the Preliminary Design Phase Management Plan. Preliminary Design (PD) Phase Plan from System Design Review (SDR) Systems Engineering...
Keck NGAO PD Team Meeting #2 12:00p 3:00p PST 9:00a 12:00p HST Tuesday, August 19, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
NGAO Development Process Standards Posted below is some material that document the W. M. Keck Observatory Development Phases. The author of these documents is the...
NGAO Science Operations 0. Science Operations during the SD phase (up to April 2008) Follow link to access the Twiki page that presents the work studies performed...
NGAO Science Operations during the SD phase (approved by EC) WBS 3.4.1.2: Interfaces (approved to EC) WBS 3.4.2.1: Operations Architecture (updated on...

«Previous   1  2  3  4  5  6  7  8  9  10  11   Next»

Show 10, 20, 50, 100, 500, 1000 results per page, or show all.

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map

Edit | Attach | Watch | Print version | History: r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions
Topic revision: r2 - 2005-03-28 - TWikiContributor
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback