Recent Changes in Keck/NGAO Web retrieved at 11:38 (GMT)

LGS pentagon asterism 20` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 10` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 60` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 50` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 40` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 30` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 60` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) GS triangle asterism...
LGS triangle asterism 50` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 40` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 30` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 20` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
Keck NGAO PD Team Meeting #4 10:00a 1:45p PST 8:00a 11:45a HST Friday, December 19, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
NGAO Observing Scenarios Information This page is used to summarize the work for the observing scenarios. The observing scenarios and example observations are used...
Keck NGAO PD Team Meeting #3 9:00a 6:00p PST on Sept. 11; 9:00a 5:00p on Sept. 12. 6:00a 3:00p HST on Sept. 11; 6:00a 2:00p on Sept. 12. Thursday and Friday...
Transmission and Background Budget pages Documents 501: NGAO Background and Transmission Budgets: AHB 8/28/07 Old versions: v1.0 (8/8/07) Modeling software...
This collection is for maintaining the Preliminary Design Phase Management Plan. Preliminary Design (PD) Phase Plan from System Design Review (SDR) Systems Engineering...
Keck NGAO PD Team Meeting #2 12:00p 3:00p PST 9:00a 12:00p HST Tuesday, August 19, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
NGAO Development Process Standards Posted below is some material that document the W. M. Keck Observatory Development Phases. The author of these documents is the...
NGAO Science Operations 0. Science Operations during the SD phase (up to April 2008) Follow link to access the Twiki page that presents the work studies performed...
NGAO Science Operations during the SD phase (approved by EC) WBS 3.4.1.2: Interfaces (approved to EC) WBS 3.4.2.1: Operations Architecture (updated on...
This collection is for supporting the development of a Plan for Phased Implementation and Descopes. 594 Plan to Address Phased Implementation and Descope Options...
NGAO Pre Project Proposal NGAO Proposal (225 pgs) NGAO Proposal Executive Summary (35 pgs)
Keck NGAO PD Team Meeting #1 12:00p 3:00p PST 9:00a 12:00p HST Friday, June 13, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference...
Links to PSF libraries from Chris Neyman and Ralf Flicker All on axis cases: FTP document with explanations to the PSF simulations. PSFs...
Extragalactic Astronomy Point Spread Functions MCAO (2 Deformable Mirror) PSFs for V,R,I,J,H,K http://lao.ucolick.org/psfs.html . The tip/tilt uncertainty is...
Science Simulations This page presents various simulations in progress or completed for the NGAO Science Cases: 1 PSF Libraries 1 PSF Simulation Parameters...
This collection is for producing the Systems Engineering Management Plan to be presented at the System Design Review. WBS 4.1.1 Work Breakdown Structure Task Definitions...
Acquisition Cameras (WBS 3.2.3.7.1 WBS 3.2.3.7.2) WSPS NGAO acq WBS 32371v2.doc: Draft plan for WBS report NGAO WBS32371 dlm.doc: DLM`s working draft...
AO System Diagnostics (WBS 3.2.3.9, WBS 3.2.3.10, WBS3.2.12) Integrated with AO (WBS 3.2.3.9) Proposed subsystems Radiometric calibration of instrument and...
NGAO LGS Object Selection Mechanism page Nomenclature LGS WFS assembly This is the entire LGS WFS package containing the 9 LGS WFS units, LGS OSM and all structure...
This collection is for System Design Phase Planning and Tracking Documents EC Telecon Dial in Number 877 280 4645 with passcode 540030 (via WMKO) Systems Engineering...
Keck NGAO Team Meeting #14 10:00a 3:00p PST (Tentative) 8:00a 1:00p HST (Tentative) Tuesday, February 19, 2008 Tele/Videoconference Dial in Number: 877...
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
Keck NGAO Team Meeting #13 10:00a 4:15p PST 8:00a 2:15p HST Friday, January 25, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030...
Keck NGAO Cost Estimation Assignments Links Team Meeting #13 Estimator Template Workbooks (MS Excel) https://www.oir.caltech.edu/twiki oir/pub/Keck...
Keck NGAO Team Meeting #12 10:00a 5:30p PST 8:00a 3:30p HST Thursday, December 13, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
NGAO LOWFS Object Selection Mechanism Nomenclature: NGAO LOWFS OSM This is a interim OSM for the NGAO system, likely required for first light before the d IFS is...
Keck NGAO Team Meeting #11 9:00a 6:00p PST (note change from PDT to PST on Nov. 4) 7:00a 4:00p HST Monday, November 5, 2007 Tele/Videoconference Dial in...
Meeting Minutes Team Meeting #9 Agenda AO and Laser System Design Kickoff, August 24, 2007 group meeting September 28, 2007 Keck NGAO opto mechanical...
Statistics for Keck/NGAO Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save...
Keck NGAO Team Meeting #8 9:00 a 6:00 p (Pacific Daylight Time) Mon, July 9 to Fri, July 13, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
NGAO Proposal PeterWizinowich 09 Jun 2006
test parent page ChrisNeyman 11 09 2006
Chris Neyman TestPage Where am I?
NGAO Proposal PeterWizinowich 09 Jun 2006
Keck NGAO Team Meeting #10 8:00a 6:00p Monday, September 17, 2007 012 Robinson Laboratory, Caltech Telecon attendees: 877 280 4645 passcode 540030 (video status...
Keck NGAO Team Meeting #9 10:00a 3:30p PDT Friday, August 24, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
WBS 3.3 LGS Facility (NGAO System Design Collection) Work Package Meetings Kick off meeting held on 4th Sept., 2007 (attendees: J. Bell, J. Chin, C. Neyman, Erik...
Keck NGAO Team Meeting #9 10:00a 3:30p PDT Friday, August 24, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...

«Previous   1  2  3  4  5   Next»

Show 10, 20, 50, 100, 500, 1000 results per page, or show all.

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map


This topic: Keck/NGAO > WebHome > WebChanges
Topic revision: r2 - 2005-03-28 - TWikiContributor
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback