Recent Changes in Keck/NGAO Web retrieved at 23:54 (GMT)

1 Project Scope: Enabling front page astronomical science by designing, building, and deploying the world`s most advanced astronomical adaptive optics instrumentation...
Software for Near Infrared Tip Tilt Sensor Operations Software System Including: Pre Observing Tools, Observation Setup, Calibration, User Interfaces, Observing...
Electronics Diagrams for Near Infrared Tip Tilt Sensor DavidHale 29 Jan 2013 TRICK 8 Sensor Test Cable.pdf: Dewar 8 Sensor Test Cable TRICK Thermal...
AO System Design Link to Opto Mechanical Mini Design Review 17, 2009 Opto Mechanical Design Meeting Minutes 21, 2009 5,2009 2, 2009...
NGAO NIR TTS Cryostat Pre Ship Review Working Area Documentation Preparation Lists and Schedules PSR Preparation Schedule (pdf) PSR Preparation Schedule...
NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
Near IR Tip Tilt Sensor Preliminary Design Review (PDR): Date: Monday, April 25, 2011 Time: 12:00pm 6:00pm PDT/ 9:00am 3:00pm HST Reviewers: Corinne...
PSF Reconstruction (PSF R) Project Scope: 1) Demonstrate NGS AO PSF Reconstruction with the Gemini Altair Keck AO systems (near term funded work). 2) Understand...
Notes on Keck AO for PSF Recovery Project AO General AO documentation can be found here Keck AO public Webpage AO Sign Conventions and Geometry Keck DM to WFS geometry...
This collection is for maintaining the Preliminary Design Phase Reports and tracked versions of the schedule. NGAO Project Schedules Tracked version of the Build...
Near IR Tip Tilt Sensor System Design Review (SDR): Date: Tuesday, December 7, 2010 Time: 10:30am 4:00pm HST / 12:30pm 6:00pm PST Reviewers: Corinne...
Reduced Focal Anisoplanatism Error Demonstration at Keck Team Lead: Chris Neyman Scientific Team: Peter Wizinowich, Rich Dekany, Don Gavel, Brent Ellerbroek...
NGWFC Parametric Oscillator for tip/tilt vibration reduction Project on hold as of Sept 9, 2010 Parametric Oscillator delayed for now.pdf: Chris` email regarding...
NGWFC Lab Environment MVME6100 Boot parameters Uses oneo (128.171.96.192) as the boot host instead of deprecated kuhio. Oneo is a solaris 8 container setup specifically...
NGWFC Lab Hardware 2010aug30 SciMeasure camera head and controller tip/tilt power supply (connect to MGAOS VME crate) VME VME6100 (processor...
NGAO Controls Systems Home Page NGAO Background Information Multi Systems Command Sequencer (MCS) SW Architecture Work (KCSF) Control Systems Software Preliminary...
NGAO Preliminary Design Phase Main.Jason Chin Originated 09 February 2009 Laser Guide Star Facility Preliminary Design Phase (WBS 3.5) and related summit activities...
DAVINCI Mini Review Final Reviewer Report 743 Final Report on the NGAO DAVINCI Instrument Mini Design Review Agenda and Scope/Objectives DAVINCI Mini review...
DAVINCI Preliminary Design Review Documents Review Presentation Preliminary Design Report 761 DAVINCI Overview and Optical Design Report v1 1.pdf: Updated...
Control Systems Software Mini Review: April 16, 2010 Review Schedule Material to web site: COB Tue April 6, 2010 Response from reviewers due: COB Tue...
This collection is for maintaining the Systems Engineering Management Plan (SEMP) documentation for the PDR. Breakdown Structure (PBS) (2/26/10) Work...
NGAO Wavefront Sensors Preliminary Design Phase Laser Guide Star (LGS) WFS Subsystem Consisting of the Fixed LGS asterism assembly and Patrolling LGS asterism assembly...
System Performance PD mini review 02:30p 06:30p PDT 11:30a 03:30p HST Thursday, May 13, 2010 Tele/Videoconference Conference Room direct #: TBD Videoconference...
NGAO Systems Engineering Group Twiki Page A. Mini Design Reviews Actions Lists This list tracks outstanding action items from the PD phase NGAO mini reviews...
NGAO Opto Mechanics Mini Design Review, November 17, 2009 NOTE CHANGE The review date has been changed to November 17 to allow more time for the reviewers to read...
SW Architecture Review, August 24, 2009 Review Documents: Charter Requirements Design on Middleware Supplementary Material: KAON 671: NGAO...
NGAO Laser Guide Star Facility Main.Jason Chin Originated 29 Oct 2009 Laser Launch Facility Mini Review Final Review Report: KAON 689 NGAO Laser Launch...
NGAO Real Time Controller Mini Design Review, December 2009 Telecon: 877 280 4645 room 540030 Video: 128.114.22.14 Review Schedule Design group posts material...
Keck NGAO PD Phase LGS WFS Mini Review 10:00a 02:00p PDT 08:00a 12:00p HST Monday, December 7, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode...
Design Standards: 484 Optical Design Practices for NGAO Exporting Zemax as a STEP file: Zemax Export Screen Snapshot Zemax files can be imported to Solidworks...
LO WFS PD mini review 11:00a 03:00p PDT 08:00a 12:00p HST Friday, April 2, 2010 Tele/Videoconference Conference Room direct #: 626 395 8884 or 626 395...
Alignment, Calibration Performance Monitoring PD mini review 11:00a 03:00p PDT 08:00a 12:00p HST Tuesday, April 20, 2010 Tele/Videoconference Conference...
NGAO Motion Control Architecture Mini Design Review, 11 March 2010 Review Schedule Material to web site: 4 Mar Response from reviewers due: end of day...
NGAO Electronics Architecture Mini Design Review, 26 January 2010 Review Schedule Material to web site: 15 Jan Response from reviewers due: end of day...
NGAO System Architecture WBS 3.1.3 Work Package Schedule Subsystem Evaluation Criteria Form.xls. Please use this form when performing your subsystem evaluations...
NGAO Performance Flowdown Worksheets A performance flowdown is the allocation of error terms to constituent subsystems or components Update (4/25/10): The performance...
NGAO Wavefront Error Budget Current Content WFE budget documentation WFE budget tool outline overview.pdf: Initial draft of outline form of spreadsheet...
Opto Mechanical Design LOWFS and HOWFS Design Real Time Control Design Supervisory Control Design Acquisition System Design Alignment, Calibration...
NGAO Alignment, Calibration, and Diagnostics mini review Questions and comments from Jim Lyke Responses from Peter in italics. KAON 719 Alignment Plan Sec....
Keck NGAO PD Phase NGS WFS Mini Review 11:00a 03:00p PDT 08:00a 12:00p HST April 1st, 2010 Tele/Videoconference Dial in Number:626 395 8884 Videoconference...
Control Systems Software Preliminary Design Work 2010apr16 Control Systems Software Mini Review
PD Phase Functional Requirements PD Requirements Review Phase II March 2010 Goals The NGAO project will finalize the System and Functional requirements over the...
Working files for 102018 interface meeting Slightly tweeked version of Reni`s layout v9 ZMX Output science fold mirror tilt opened by 5 degrees (from...
Enclosure to Elevation Ring Gap: Gowning Door: Elevation Wrap: Enclosure to Elevation Ring Gap2: Enclosure to Elevation...
This collection is for Opto Mechanical Graphics in support of design and interface control. Telescope: Note: WM Keck DSM team is working on a Solidworks 3D Model...
System Requirements Document Final Version for System Design Review 456 System Requirements Document (pdf) Draft Versions KAON456 NGAO SRD v1.14.doc...
HW Architecture Work 2010jan26: Controls Electronics Architecture Mini Review 2010mar11: Motion Controls Architecture Mini Review HW Architecture Work KAON...
NGAO Background Information From Controls Team Meetings Kickoff meeting, Aug 5, 2008 Slides Intro to AO, Aug 28, 2008 https://www.oir...
SW Architecture Work 2009aug24: SW Architecture Mini Review SW Architecture Work Jimmy`s presentation on SW frameworks Slides
B. Multi Systems Command Sequencer (MCS) Schedule The MCS portion excerpted from the main NGAO project plan (Excel spreadsheet) WBS interrelationships...
AO System Design Effort (WBS 3.2 3.3), System Design Phase PDR Phase Opto Mechanical Design page Opto Mechanical Mini Design Review, Nov 2009 Management...
Keck NGAO PD Team Meeting #8 11:00a 01:00p PDT 08:00a 10:00a HST Wednesday, September 2, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode...
Joint NGAO, IRIS, and Keck 1 LO WFS Summit 08:30a 01:00p PST 06:30a 11:00p HST Tuesday, December 15, 2009 Tele/Videoconference Conference Room direct #:...
Real Time Controller (RTC) Design, Preliminary Design Phase Link to mini Design Review Page Project Plan Project Plan Rebaseline (Revision 1, dated June...
NGAO Science Instrumentation This is the working area for NGAO science instrumentation development. It is access controlled as a private working area for the NGAO...
Keck/NGAO Web Preferences The following settings are web preferences of the Keck/NGAO web. These preferences overwrite the site level preferences in...
This is a subscription service to be automatically notified by e mail when topics change in this 1 web. This is a convenient service, so you do not have to come...
NGAO Performance Budgets Working Groups (updated Aug 25, 2009) Performance Budget Team Membership Modelling Tools and Validation Dekany, Gavel, Neyman...
Keck NGAO PD Team Meeting #7 11:30a 3:30p PDT 8:30a 12:30p HST Wednesday, May 27, 2009 (rescheduled from an original May 15 date) Tele/Videoconference Dial...
NGAO Team Meetings Collections PD Phase 090902 NGAO PD Meeting #8 (Tele/Video) 090527 NGAO PD Meeting #7 (Tele/Video) 090319 NGAO PD Meeting #6 (Tele...
NGAO Systems Engineering Analysis Point and shoot study and Shoot Trade Study propagration in LGS tomography (KAON 621) and Shoot SPIE paper (KAON...
1 This collection is for the NGAO Science Advisory Team SAT Members: Laird Close, George Djorgovski, Richard Ellis, James Graham, Michael Liu, Keith Matthews...
Keck NGAO PD Team Meeting #6 1:00p 5:00p PDT 10:00a 2:00p HST Thursday, March 19, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
LGS tetrad asterism 15` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
NGAO LGS Asterism Study Triangle Asterism Triangle 10` radius plots Triangle 20` radius plots Triangle 30` radius plots Triangle 40` radius plots...
LGS pentagon asterism 30` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS pentagon asterism 30` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 5` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
Accessing the Contour requirements database Contour Requirements Database Certificate error is normal Click `Continue to this website`...
NGAO Functional Requirements SD Phase (Old) This page presents various drafts and background information on the NGAO functional requirements: 1. Background information...
Keck NGAO PD Team Meeting #5 1:00p 5:00p PST 11:00a 3:00p HST Thursday, February 5, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
Irregular Asterisms Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman 05 Mar 2009...
LGS tetrad asterism 10` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS pentagon asterism 50` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 20` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS quincunx asterism 10` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS quincunx asterism 20` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS pentagon asterism 10` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS quincunx asterism 40` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS pentagon asterism 60` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS pentagon asterism 40` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS pentagon asterism 30` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS pentagon asterism 20` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 10` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 60` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 50` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 40` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS tetrad asterism 30` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 60` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) GS triangle asterism...
LGS triangle asterism 50` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 40` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 30` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
LGS triangle asterism 20` radius Plot key: Orange stars LGS location, Blue cross evaluation point (5` spacing on axis) (15` spacing off axis) ChrisNeyman...
Keck NGAO PD Team Meeting #4 10:00a 1:45p PST 8:00a 11:45a HST Friday, December 19, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
NGAO Observing Scenarios Information This page is used to summarize the work for the observing scenarios. The observing scenarios and example observations are used...
Keck NGAO PD Team Meeting #3 9:00a 6:00p PST on Sept. 11; 9:00a 5:00p on Sept. 12. 6:00a 3:00p HST on Sept. 11; 6:00a 2:00p on Sept. 12. Thursday and Friday...
Transmission and Background Budget pages Documents 501: NGAO Background and Transmission Budgets: AHB 8/28/07 Old versions: v1.0 (8/8/07) Modeling software...
This collection is for maintaining the Preliminary Design Phase Management Plan. Preliminary Design (PD) Phase Plan from System Design Review (SDR) Systems Engineering...
Keck NGAO PD Team Meeting #2 12:00p 3:00p PST 9:00a 12:00p HST Tuesday, August 19, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
NGAO Development Process Standards Posted below is some material that document the W. M. Keck Observatory Development Phases. The author of these documents is the...
NGAO Science Operations 0. Science Operations during the SD phase (up to April 2008) Follow link to access the Twiki page that presents the work studies performed...
NGAO Science Operations during the SD phase (approved by EC) WBS 3.4.1.2: Interfaces (approved to EC) WBS 3.4.2.1: Operations Architecture (updated on...
This collection is for supporting the development of a Plan for Phased Implementation and Descopes. 594 Plan to Address Phased Implementation and Descope Options...
NGAO Pre Project Proposal NGAO Proposal (225 pgs) NGAO Proposal Executive Summary (35 pgs)
Keck NGAO PD Team Meeting #1 12:00p 3:00p PST 9:00a 12:00p HST Friday, June 13, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference...
Links to PSF libraries from Chris Neyman and Ralf Flicker All on axis cases: FTP document with explanations to the PSF simulations. PSFs...
Extragalactic Astronomy Point Spread Functions MCAO (2 Deformable Mirror) PSFs for V,R,I,J,H,K http://lao.ucolick.org/psfs.html . The tip/tilt uncertainty is...
Science Simulations This page presents various simulations in progress or completed for the NGAO Science Cases: 1 PSF Libraries 1 PSF Simulation Parameters...
This collection is for producing the Systems Engineering Management Plan to be presented at the System Design Review. WBS 4.1.1 Work Breakdown Structure Task Definitions...
Acquisition Cameras (WBS 3.2.3.7.1 WBS 3.2.3.7.2) WSPS NGAO acq WBS 32371v2.doc: Draft plan for WBS report NGAO WBS32371 dlm.doc: DLM`s working draft...
AO System Diagnostics (WBS 3.2.3.9, WBS 3.2.3.10, WBS3.2.12) Integrated with AO (WBS 3.2.3.9) Proposed subsystems Radiometric calibration of instrument and...
NGAO LGS Object Selection Mechanism page Nomenclature LGS WFS assembly This is the entire LGS WFS package containing the 9 LGS WFS units, LGS OSM and all structure...
This collection is for System Design Phase Planning and Tracking Documents EC Telecon Dial in Number 877 280 4645 with passcode 540030 (via WMKO) Systems Engineering...
Keck NGAO Team Meeting #14 10:00a 3:00p PST (Tentative) 8:00a 1:00p HST (Tentative) Tuesday, February 19, 2008 Tele/Videoconference Dial in Number: 877...
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
Keck NGAO Team Meeting #13 10:00a 4:15p PST 8:00a 2:15p HST Friday, January 25, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030...
Keck NGAO Cost Estimation Assignments Links Team Meeting #13 Estimator Template Workbooks (MS Excel) https://www.oir.caltech.edu/twiki oir/pub/Keck...
Keck NGAO Team Meeting #12 10:00a 5:30p PST 8:00a 3:30p HST Thursday, December 13, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
NGAO LOWFS Object Selection Mechanism Nomenclature: NGAO LOWFS OSM This is a interim OSM for the NGAO system, likely required for first light before the d IFS is...
Keck NGAO Team Meeting #11 9:00a 6:00p PST (note change from PDT to PST on Nov. 4) 7:00a 4:00p HST Monday, November 5, 2007 Tele/Videoconference Dial in...
Meeting Minutes Team Meeting #9 Agenda AO and Laser System Design Kickoff, August 24, 2007 group meeting September 28, 2007 Keck NGAO opto mechanical...
Statistics for Keck/NGAO Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save...
Keck NGAO Team Meeting #8 9:00 a 6:00 p (Pacific Daylight Time) Mon, July 9 to Fri, July 13, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
NGAO Proposal PeterWizinowich 09 Jun 2006
test parent page ChrisNeyman 11 09 2006
Chris Neyman TestPage Where am I?
NGAO Proposal PeterWizinowich 09 Jun 2006
Keck NGAO Team Meeting #10 8:00a 6:00p Monday, September 17, 2007 012 Robinson Laboratory, Caltech Telecon attendees: 877 280 4645 passcode 540030 (video status...
Keck NGAO Team Meeting #9 10:00a 3:30p PDT Friday, August 24, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
WBS 3.3 LGS Facility (NGAO System Design Collection) Work Package Meetings Kick off meeting held on 4th Sept., 2007 (attendees: J. Bell, J. Chin, C. Neyman, Erik...
Keck NGAO Team Meeting #9 10:00a 3:30p PDT Friday, August 24, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
Keck NGAO Team Meeting #7 11:00a 5:00p PST Wednesday, May 30, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
NGAO Cascaded Relay Architecture to NGAO Architecture Retreat Notes on Cascade architecture
Adaptive Secondary Mirror architecture(s) to NGAO Architecture Retreat Two telescope AM2 Narrow FoV Relay Implementation Starting definitions https://www...
180` Technical FoV (TFoV) Relay Architecture to NGAO Architecture Retreat Starting definitions https://www.oir.caltech.edu/twiki oir/pub/Keck/NGAO/LargeRelay...
Keck I Upgrade Architecture to NGAO Architecture Retreat Starting definitions https://www.oir.caltech.edu/twiki oir/pub/Keck/NGAO/KeckOne/NGAO architecture...
Split 20` Narrow field instruments / 120` d NIRI relay architecture to NGAO Architecture Retreat Starting definitions https://www.oir.caltech.edu/twiki oir...
Summary MatthewBritton 08 July 2007
NGAO Proposal PeterWizinowich 09 Jun 2006
NGAO Systems Architecture Excel spreadsheets for Systems architecture pickoff options and dithering options K mirror versus instrument rotators Additional...
070705 NGAO WBS 3.1.3 Meeting 10:00a 5:30p PDT Thursday, July 5, 2007 In person with Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 (only...
NGAO related site for Anna Moore Welcome! Instrument re use trade study Systems Architecture This is a link to the studies relating to NGAo systems architecture...
NGAO Systems Architecture LOWFS and D NIRI pickoff study layout for P3k (Antonin Bouchez) Main.Anna Moore 5th July 2007
NGAO Systems Architecture Excel spreadsheets for LOWFS pickoffs, nodding and dithering and k mirror versus instrumet field de rotators PeterWizinowich...
NGAO High Contrast IPT Performance Budget Development Meeting Minutes 061121 NGAO high contrast minutes.pdf: Kickoff meeting 061212 NGAO high contrast...
WBS 3.1.3 Kickoff Meeting Meeting Materials NGAO Architecture Taxonomy.pdf: A shorthand nomenclature for discussion of potential NGAO architectures R. Dekany...
Keck NGAO Team Meeting #6 9:00 a 6:00 p (Pacific Daylight Time) Wed, April 25 and Thurs, April 26, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
NGAO Document Templates Work Scope Planning Sheet.doc: Work Scope Planning Sheet template for NGAO tasks (11/29/06 revised). This planning sheet should...
NGAO Model Validation Parameter and data file exchange for testing the disparate tomography codes. Don Gavel 24 Aug 2006 Draft plan: Code Comparison Tests Report...
Keck NGAO Team Meeting #5 9:50a 4:00p PST Wednesday, March 7, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
Optical Relay and Field Rotation Trade Study Working Optical Design Requirements See the corresponding Section on Optical Design Requirements in the latest SRD...
Keck NGAO Team Meeting #4 8:00a 5:30p (Hawaii Standard Time) Monday, January 22, 2007 Hualalai Conference Room, WMKO Headquarters, Waimea, HI Telecon attendees...
Keck NGAO Team Meeting #3 9:50a 2:30p PST Wednesday, December 13, 2006 Tele/Videoconference Dial in Number: 977 280 4645 Passcode: 540030 Videoconference...
Keck NGAO Team Meeting #2 8:30a 5:30p Tuesday, November 14, 2006 012 Robinson Laboratory, Caltech (moved to 023) Telecon attendees: 877 280 4645 passcode...
Photometric Precision Error Budget Development to Matthew Britton`s Photometric Precision page Includes first draft of Photometric Error Budget Technical...
Astrometric Accuracy Performance Budget Development to Matthew Britton`s astrometry page Telecons 061110 Initial Telecon Presentations 2006 12 Astrometry PPT...
Keck NGAO WFE and EE Error Budget Tools Review 9:30a 4:30p PST Tuesday, January 16, 2007 012 Robinson Laboratory Attendees: Dekany, Flicker, Gavel, Max, Neyman...
07 Dec. 2006 Observing efficiency Meeting notes Agenda: Quick intro on the NGAO and background info for this meeting Introduce WBS for Observing Efficiency...
Keck NGAO Wavefront Error and Encircled Energy Budget IPT Meeting 10:30a Noon PST Wednesday, January 3, 2007 Dial In Information: Toll free: 888 387 8686...
NGAO Trade Study Work Scopes WBS 3.1.2.3.3. LGS Asterism Geometry Size Trade Study LGSasterism.doc NGAO Trade Study Reports WBS 3.1.2.3.4. KAON...
NGAO Team Meeting #1 Directions: http://www.physics.uci.edu/~barth/ksm2006/NGAOdirections.html Status of Action Items from Meeting #1 as of 9/20/06: Items Goals:...
Telecon 11/10/06 Attendees: Jessica, Claire, Chris, Rich, Matthew and Brian Identify two goals for this project Technical report describing key factors for better...
Indian Wells NGAO Retreat Participants: Sean Adkins, Brian Bauman, Jim Bell, Antonin Bouchez, Matthew Britton, Jason Chin, Richard Dekany, Ralf Flicker, Don Gavel...
Keck NGAO Team Meeting #2 8:30a 5:30p Tuesday, November 14, 2006 012 Robinson Laboratory, Caltech Directions: to Caltech (.html) and campus map (.pdf) In propria...
NGAO Proposal WBS Dictionary (Goal is a dictionary entry for each line of the WBS; make no entries here, rather submit to Peter by email) 1 System Design Phase...
Star Lists for sky coverage calculations Low star density extragalactic fields: Goods North and South, GEMS, and COSMOS see also: http://lao.ucolick.org/tipTiltErrorMaps...
Welcome to the Extragalactic Science Pages, Keck Next Generation AO This is the place to put drafts of our NGAO proposal sections on extragalactic science; web links...
SSC Meeting on June 21, 2006 (Waimea, HI) Call in number 1 877 280 4645; Passcode (room number) 109022 NGAO Agenda Next Generation Adaptive Optics (All times are...
NGAO Proposal PeterWizinowich 09 Jun 2006
ClaireMax 03 Jun 2006
AO for Extragalactic Astronomy Stellar Populations in Crowded Fields This is the place for drafts, questions, comments, images, etc. To see how to upload files or...
AO for Extragalactic Astronomy High Redshift Galaxies This is the place to put drafts, questions, comments, images, etc. To see how to upload files or add topics...
AO for Extragalactic Astronomy Active Galactic Nuclei and Quasars To see how to upload files or add topics, go to TWikiTutorial ClaireMax 28 May 2006
AO for Extragalactic Astronomy Gravitational Lensing To see how to upload files or add topics, go to TWikiTutorial Below are fits files from Don Gavel: simulation...
AO for Extragalactic Astronomy Drafts of Extragalactic Science Section, NGAO Proposal This is the TWiki page where we will upload our draft extragalactic subsections...
Galactic Science This page may be used for sharing information by editing information on this page and/or attaching files. Pages and attachments are openly viewable...
Solar System Science This page may be used for sharing information by editing information on this page and/or attaching files. Pages and attachments are openly viewable...
Post retreat homework assignments Trade Study Possibilities v2.doc: Trade Study Possibilities v2.doc NGAO Risks v1.xls: Initial draft of risk matrix (from IW...
NGAO Proposal Template Document.doc: MS Word .doc template RichardDekany 16 May 2006
Systems Engineering Indian Wells charts Point Design chart Point design spitter farm v2 AntoninBouchez 28 Apr 2006 Indian Wells point design Point Design spread...
KNGAO GOODS N Science Case Reference paper: giavalisco04.pdf Field center (J2000): RA 12 36 55 Dec 62 14 15 Minimum zenith angle: 42.4 degrees AntoninBouchez...
KNGAO Science Case GOODS N sky coverage simulation AntoninBouchez 04 May 2006
Sean Adkins Request: Be prepared to discuss the current state of the art for low noise CCD detectors and the outlook for future performance improvements in this...
Agenda Indian Wells NGAO Point Design Retreat Tuesday, April 25: Noon 1pm Welcome/Lunch 1pm REQUIREMENTS CAPTURE Review science case requirements...
Here are the basic transmission factors for the NGAO point design (as currently envisioned): Telescope transmission (H band) # of mirrors (exposed)...
Optical transmission calculation RichardDekany 20 Apr 2006
Location: Indian Wells Resort Hotel 76 661 Hwy 111, Indian Wells, CA 92210 Phone: 760.345.6466 toll free:800.248.3220 Wireless internet access will be available...
NIRC 2 and OSIRIS Interfaces Message sent from R. Dekany to J. Larkin, and K. Matthews: Hi, James, Keith, In considering a point design for NGAO, we`ve been wondering...
Initial Twiki Page Placeholder RichardDekany 14 Apr 2006 SPIE Glasgow 04 final.doc: Glasgow Risk Assessment Paper
Initial Wiki Page Placeholder RichardDekany 14 Apr 2006 WBS example.xls: ROM costing spreadsheet example
Workshop Goals 1. Establish and document the flowdown from Science Case requirements to NGAO technical requirements, 1. Develop and document one feasible implementation...
See also the verbose 1 .
TWiki`s Keck/NGAO web /Keck/NGAO The 1 web of TWiki. TWiki is a Web Based Collaboration Platform for the Enterprise.
1 Web Create New Topic Index Search Changes Notifications Statistics Preferences
See also the faster 1

 

Show 10, 20, 50, 100, 500, 1000 results per page, or show all.

Related topics: RSS feed, rounded corners RSS feed, ATOM feed, WebNotify, site changes, site map


This topic: Keck/NGAO > WebHome > WebChanges
Topic revision: r2 - 2005-03-28 - TWikiContributor
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback