NGAO Proposal WBS Dictionary (Goal is a dictionary entry for each line of the WBS; make no entries here, rather submit to Peter by email) * 1 System Design Phase Management - done * 1.1 Planning & Contracting * 1.1.1 Planning - done * 1.1.2 Contracting - done * 1.2 Meetings - done * 1.2.1 Executive Committee Telecons - done * 1.2.2 Science Advisory Committee Telecons - done * 1.2.3 Team Meetings - done * 1.3 Tracking & Reporting - done * 1.4 Funding Proposal(s) - done * 1.5 System Design Review * 1.5.1 System Design Report -done * 1.5.2 System Design Review Activities - done * 2 System Requirements - done * 2.1 Science Requirements * 2.1.1 Solar System * 2.1.2 Galactic * 2.1.2.1 Galactic Center - done * 2.1.2.2 Debris Disks and Binary Brown Dwarfs - done * 2.1.3 Extragalactic * 2.1.3.1 Resolved Stellar Populations - done * 2.1.3.2 High Redshift Galaxies - done * 2.1.4 Science Requirements Summary * 2.2 Observatory Requirements * 2.3 System Requirements Document - done * 3 System Design Approach * 3.1 System Engineering * 3.1.1 Performance Budgets - done * 3.1.1.1 Model Assumptions - done * 3.1.1.1.1 TMT Site Monitoring Data Mining * 3.1.1.1.2 Telescope Dynamic Performance Data - done * 3.1.1.1.3 Telescope Static Wavefront Errors - done * 3.1.1.1.4 Sodium Return versus Laser Format - done * 3.1.1.2 Model/Tool Validation - done * 3.1.1.2.1 Agreement between Tomography Codes - done * 3.1.1.2.2 Agreement between Sky Coverage Codes * 3.1.1.2.3 Anchor to Keck II LGS AO PSFs - done * 3.1.1.2.4 Anchor to On-sky MGSU Experiments - done * 3.1.1.2.5 Anchor to LAO Lab Experiments - done * 3.1.1.3 Throughput - done * 3.1.1.4 Background - done * 3.1.1.5 Wavefront Error - done * 3.1.1.6 Encircled Energy - done * 3.1.1.7 Photometric Accuracy - done * 3.1.1.8 Astrometric Accuracy - done * 3.1.1.9 Polarimetric Accuracy * 3.1.1.10 Companion Sensitivity - done * 3.1.1.11 Point Source Sensitivity - done * 3.1.1.12 PSF Stability - done * 3.1.1.13 Observing Efficiency - done * 3.1.1.14 Observing Uptime - done * 3.1.1.15 Performance Budgets Summary * 3.1.2 System Architecture * 3.1.3 Trade Studies * 3.1.3.1 System Architecture Trade Studies * 3.1.3.1.1 NGAO versus Keck AO Upgrades - done * 3.1.3.1.2 Adaptive Secondary Mirror Option - done * 3.1.3.1.3 K & L-band Science - done * 3.1.3.1.4 Keck Interferometer Support - done * 3.1.3.1.5 Instrument Balance - done * 3.1.3.1.6 GLAO for non-NGAO Instruments - done * 3.1.3.1.7 Instrument Reuse - done * 3.1.3.1.8 Telescope Wavefront Errors - done * 3.1.3.2 Adaptive Optics System Trade Studies - done * 3.1.3.2.1 AO Enclosure Temperature - done * 3.1.3.2.2 Optical Relay Design - done * 3.1.3.2.3 Field Rotation Strategy - done * 3.1.3.2.4 Dichroics - done * 3.1.3.2.5 Rayleigh Rejection - done * 3.1.3.2.6 LGS Wavefront Sensor Type - done * 3.1.3.2.7 LGS Wavefront Sensor Number of Subapertures - done * 3.1.3.2.8 Slow Wavefront Sensor - done * 3.1.3.2.9 Low Order Wavefront Sensor Architecture - done * 3.1.3.2.10 Number and Type of Low Order Wavefront Sensors - done * 3.1.3.2.11 Centroid Anisoplanatism - done * 3.1.3.2.12 Deformable Mirror Stroke Requirement - done * 3.1.3.2.13 Stand-alone Tip/Tilt Mirror versus DM on Tip/Tilt Stage - done * 3.1.3.2.14 Correcting Fast Tip/Tilt with DM - done * 3.1.3.2.15 Focus Compensation - done * 3.1.3.3 Laser Facility Trade Studies * 3.1.3.3.1 Laser Pulse Format - done * 3.1.3.3.2 Free Space versus Fiber Relay - done * 3.1.3.3.3 LGS Asterism Geometry and Size - done * 3.1.3.3.4 Variable versus Fixed LGS Asterism Geometry - done * 3.1.4 Functional Requirements - done * 3.1.4.1 AO System * 3.1.4.2 Laser System * 3.1.4.3 Operations Tools * 3.1.4.4 Science Instruments * 3.1.5 Technology Drivers Summary * 3.1.6 Technical Risk Assessment * 3.2 AO System * 3.2.1 AO System Architecture - done * 3.2.2 AO Enclosure - done * 3.2.3 Opto-Mechanical Design - done * 3.2.3.1 Field Rotation - done * 3.2.3.2 Optical Relay - done * 3.2.3.3 Optical Switchyard - done * 3.2.3.4 Optical Support Structure - done * 3.2.3.5 Wavefront Sensors * 3.2.3.5.1 High Order LGS Wavefront Sensors * 3.2.3.5.2 High Order NGS Wavefront Sensors * 3.2.3.5.3 Low Order NGS Wavefront Sensors * 3.2.3.5.4 Calibration Wavefront Sensors * 3.2.3.6 Wavefront Correctors * 3.2.3.6.1 Tip/Tilt * 3.2.3.6.2 Deformable Mirror * 3.2.3.7 Atmospheric Dispersion Correction - done * 3.2.3.8 Acquisition Cameras * 3.2.3.8.1 NGS Acquisition Camera * 3.2.3.8.2 LGS Acquisition Camera * 3.2.3.9 Alignment, Calibration, Diagnostics, Metrology and Monitoring - done * 3.2.4 Non-Real-Time Control * 3.2.4.1 Non-RTC Software Design - done * 3.2.4.2 Non-RTC Electrical Design - done * 3.2.5 Real-time Control - done * 3.2.5.1 RTC Architecture Analysis and Design Study - done * 3.2.5.2 RTC Software Module Definition - done * 3.2.5.3 RTC Hardware Module Definition - done * 3.3 Laser Facility * 3.3.1 Laser System Architecture - done * 3.3.2 Laser Enclosure * 3.3.3 Laser - done * 3.3.4 Laser Launch - done * 3.3.4.1 Laser Beam Transport * 3.3.4.2 Laser Pointing and Diagnostics * 3.3.4.3 Laser Launch Telescope * 3.3.5 Laser Safety Systems * 3.3.5.1 Personnel and Equipment Safety Systems * 3.3.5.2 Aircraft and Satellite Safety Systems * 3.3.6 Laser Traffic Control - done * 3.3.7 Laser System Control * 3.3.7.1 Laser System Software * 3.3.7.2 Laser System Electronics * 3.4 Operations Tools * 3.4.1 Operations Architecture - done * 3.4.2 Observing Setup - done * 3.4.3 User Interface - done * 3.4.4 Astronomer Planning - done * 3.4.5 Science Instruments and Telescope Interfaces - done * 3.4.6 Performance Monitoring - done * 3.4.7 Automation and Optimization - done * 3.5 Science Instruments * 3.5.1 OSIRIS * 3.5.2 Interferometer * 3.5.3 OHANA * 3.5.4 Near-IR Imager * 3.5.5 Visible Imager * 3.5.6 Visible IFU * 3.5.7 Deployable Near-IR IFU * 3.5.8 Mid-IR IFU * 3.6 System Design Manual - done * 4 System Engineering Management Plan - done * 4.1 Project Plan - done * 4.2 Risk Assessment & Management Plan - done * 4.3 Preliminary Design Phase Plan - done * 4.4 Integration & Test Plans * 4.4.1 Subsystem Integration & Test Plans * 4.4.2 System Integration & Test Plans * 4.5 Configuration Management Plan * 4.6 Project Management Plan * 4.7 System Engineering Management Plan - done
This topic: Keck/NGAO
>
SystemDesignPhasePlanning
>
WBSDictionary
Topic revision: r1 - 2006-08-31 - RichardDekany
Copyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki?
Send feedback