NGAO System Architecture WBS 3.1.3

Please create a bookmark to this page now.

  • Draft Work Package Schedule
  • Subsystem Evaluation Criteria Form.xls. Please use this form when performing your subsystem evaluations. Note that there are three tabs: the evaluation criteria form, the definitions of the criteria and a sheet to list the performance requirements used in the evaluation.

Work Package Meetings

Useful Links

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf 070524_NGAO_System_Architecture_Minutes.pdf r1 manage 27.1 K 2007-05-26 - 01:17 RichardDekany  
Microsoft Word filedoc KNGAO_ArchitectureMeeting_Minutes.doc r1 manage 29.5 K 2007-05-31 - 01:23 UnknownUser Meeting Minutes 070530
PDFpdf NGAO_SD_schedule_v26_070518_3_1_3.pdf r1 manage 22.8 K 2007-05-22 - 04:53 RichardDekany Draft work package schedule
Microsoft Excel Spreadsheetxls Subsystem_evaluation_criteria_form.xls r1 manage 17.5 K 2007-05-31 - 01:12 PeterWizinowich Subsystem evaluation criteria form
Edit | Attach | Watch | Print version | History: r57 | r6 < r5 < r4 < r3 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r4 - 2007-05-31 - ChrisNeyman
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback