This collection is for producing the Systems Engineering Management Plan to be presented at the System Design Review.

WBS 4.1.1 Work Breakdown Structure & Task Definitions:

  • Product Structure from Proposal: Visio (6/19/06). The Product Structure starts at a high level and works itself progressively to more and more and more detail.
  • The above document includes a draft WBS chart that was used in the NGAO Proposal.

WBS 4.1.2 Cost Estimation:

  • The spreadsheet developed to produce a budget estimate for Chapter 6 of the NGAO proposal. See the "Budget" tab for the summary budget. This estimate was based on costs for each of the major subsystems developed in the tabs labelled "AO System", "Non-RT Control", "Laser System" and "Operations Tools".
  • The cost estimate from the system architecture phase and accompanying notes (9/6/07).
  • Initial thoughts on the cost estimation process from the 12/13/07 team telecon.
  • Initial draft cost estimation KAON from the 12/13/07 team telecon, containing proposed costing guidelines.

WBS 4.1.3 Major Project Milestones:

WBS 4.1.4 Full MS Project Plan:

WBS 4.2 Risk Assessment & Management Plan:

WBS 4.3 Preliminary Design Phase Plan:

WBS 4.4 Integration and Test Plans:

WBS 4.5 Configuration Management:

WBS 4.6 Project Management Plan:

WBS 4.7 Systems Engineering Management Plan (SEMP) Document:

Topic attachments
I Attachment History Action Size Date Who Comment
JPEGjpg AO_system_product_structure.jpg r1 manage 10.6 K 2007-12-19 - 19:32 PeterWizinowich AO system product structure
Microsoft Excel Spreadsheetxls NGAO_CostEstimate.xls r1 manage 34.5 K 2007-12-19 - 20:03 PeterWizinowich Cost estimate from Don (9/6/07)
Unknown file formatmpp NGAO_PD_schedule_v0.mpp r1 manage 184.0 K 2007-12-19 - 18:50 PeterWizinowich Plan used in TSIP proposal.
Visio documentvsd NGAO_Product_Structure_v2.vsd r1 manage 315.5 K 2007-12-19 - 19:15 PeterWizinowich Product Structure from Proposal
PDFpdf NGAO_TSIP_Proposal_2007.pdf r1 manage 2123.8 K 2007-12-19 - 18:55 PeterWizinowich TSIP proposal
JPEGjpg NGAO_WBS_Chart.jpg r1 manage 121.2 K 2007-12-19 - 19:24 PeterWizinowich WBS chart from Proposal
JPEGjpg NGAO_prod_structure.jpg r1 manage 21.7 K 2007-12-19 - 19:29 PeterWizinowich NGAO Product Structure - top level
Microsoft Excel Spreadsheetxls NGAO_proposal_point_design_v2.xls r1 manage 86.0 K 2007-12-19 - 20:11 PeterWizinowich Spreadsheet developed to produce budget for NGAO proposal
Unknown file formatmpp NGAO_schedule.mpp r1 manage 132.0 K 2007-12-19 - 19:52 PeterWizinowich NGAO project schedule used in Proposal
GIFgif NGAO_schedule_v2.gif r1 manage 46.5 K 2007-12-19 - 19:56 PeterWizinowich  
Microsoft Word filedoc Notes_on_costing_rev1.doc r1 manage 53.0 K 2007-12-19 - 20:04 PeterWizinowich Cost estimate notes from Don (9/6/07)
JPEGjpg Opto-mech_prod_structure.jpg r1 manage 31.4 K 2007-12-19 - 19:33 PeterWizinowich  
JPEGjpg Product_Structure_optical_relay.jpg r1 manage 20.1 K 2007-12-19 - 19:38 PeterWizinowich  
Edit | Attach | Watch | Print version | History: r48 | r4 < r3 < r2 < r1 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r1 - 2007-12-19 - PeterWizinowich
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback