This collection is for maintaining the Preliminary Design Phase Reports and tracked versions of the schedule.
NGAO Project Schedules
Tracked version of the Build-to-Cost Replan Schedule
- May/09 version (Build-to-Cost v8 tracked schedule in Project Report 13)
- Jun/09 version (Build-to-Cost v8 tracked schedule in Project Report 14)
- Jul/09 version (Build-to-Cost v8 tracked schedule in Project Report 15)
- Aug/09 version (Build-to-Cost v8 tracked schedule in Project Report 16)
- Sept/09 version (Build-to-Cost v8 tracked schedule in Project Report 17)
Tracked version of the NGAO Instrument Schedule
Tracked version of the SEMP Schedule (Obsoleted - no longer tracked)
External Reports
TSIP Reports
SSC Presentations
SAT Meeting Presentations