AO System Design

  • LOWFS and HOWFS Design
  • non-Real-Time Control Design
  • Acquisition System Design
  • Alignment, Calibration, and Diagnostics Design

NGAO Opto-Mechanical Design Work in Progress, PDR Phase

Meeting Minutes

Documents

Organized in chronological order as the design develops

Links to Conceputal Design Phase Materials (AKA system design phase)

Designs originating in Conceptual Design Phase

Single Relay concepts

  • KNGAO_168mmDM_wTT.ZMX: Single relay design, 168mm DM (48 actuators, 3.5mm pitch), separate tip/tilt
  • KNGAO_168mmDM.ppt: Powerpoint slide with layout of single relay with 168mm 48x48 piezo DM.

Cascaded Relay and Switchyard Concept that avoids the dichroics between relays
2-tier, 100 mm beam in 1st relay

1-tier, 140 mm beam in 1st relay

Pickoff switchyard details (valid for either 1st relay option)

1-tier, 100mm beam in 1st relay Passes 120 arcsecond tip/tilt star field.

Flipped the second relay around, per Chris' request. Added NGS WFS and assumed one science instrument, with ability to add more.

March 19, 2009: Expanded the second relay field to 40 arcseconds, first relay still 120 arcseconds. Also cleaned up some cooridinate breaks and folds.

March 30, 2009; Added acquisition camera pickoff for LOWFS and interferometer feed dichroic beamsplitter. Added FSM to NGS WFS feed.

Topic attachments
I Attachment History Action Size Date Who Comment
PNGpng 1-tier-champion-dec2007.png r1 manage 141.8 K 2009-01-08 - 21:34 UnknownUser Slide showing 1-tier, 140mm DM cascaded relay design carried over from conceptual design phase.
Unknown file formatZMX KNGAO_1-tier_100mm_120arcsec_straightthru_2nd-relay_wtelescope_v2.ZMX r2 r1 manage 59.3 K 2009-03-04 - 21:44 UnknownUser Cascaded-relay design, 1-tier, 100mm DM, avoiding dichroic changer, version 2
Unknown file formatZMX KNGAO_1-tier_100mm_120arcsec_straightthru_2nd-relay_wtelescope_v3.ZMX r1 manage 55.9 K 2009-03-19 - 18:58 UnknownUser Cascaded-relay design, 1-tier, 100mm DM, 2nd relay passes 40"
Unknown file formatZMX KNGAO_1-tier_100mm_120arcsec_straightthru_2nd-relay_wtelescope_v4.ZMX r1 manage 92.9 K 2009-03-30 - 19:34 UnknownUser  
Unknown file formatZMX KNGAO_1-tier_100mm_straightthru_2nd-relay_wtelescope.ZMX r1 manage 48.2 K 2009-02-23 - 17:19 UnknownUser Cascaded-relay design, 1-tier, 100mm DM, avoiding dichroic changer.
PowerPointppt KNGAO_168mmDM.ppt r1 manage 212.0 K 2009-01-08 - 21:12 UnknownUser Powerpoint slide with layout of single relay with 168mm 48x48 piezo DM.
Unknown file formatZMX KNGAO_168mmDM_wTT.ZMX r1 manage 36.1 K 2009-01-08 - 17:40 UnknownUser Single relay design, 168mm DM (48 actuators, 3.5mm pitch), separate tip/tilt
Unknown file formatZMX KNGAO_2-tier_folded-2nd-relay_v4_wtelescope.ZMX r1 manage 112.4 K 2009-01-08 - 17:43 UnknownUser Cascaded-relay, 2-tier design carried over from conceptual design phase
Unknown file formatZMX KNGAO_2-tier_straightthru_2nd-relay_v4_wtelescope.ZMX r3 r2 r1 manage 69.5 K 2009-01-29 - 21:47 UnknownUser Cascaded-relay design, 2-tier, 100mm DM, avoiding dichroic changer.
Unknown file formatZMX KNGAO_200mmDM.ZMX r1 manage 29.0 K 2009-01-08 - 17:38 UnknownUser Single relay design, 200mm DM (48 actuator, 5mm pitch)
PowerPointppt KNGAO_200mmDM.ppt r1 manage 121.5 K 2009-01-08 - 21:08 UnknownUser Powerpoint slide with layout of single relay with 200mm, 48x48, piezo DM.
PowerPointppt KNGAO_25mmMEMs.ppt r1 manage 170.0 K 2009-01-08 - 21:07 UnknownUser Powerpoint slide with layout of single relay with 25mm MEMs.
PowerPointppt KNGAO_OptoMechanicalLayout.ppt r1 manage 817.0 K 2009-02-07 - 00:17 UnknownUser  
PowerPointppt KNGAO_annotated_layout.ppt r1 manage 138.0 K 2009-01-08 - 21:01 UnknownUser Powerpoint slide showing layout of 2-tier cascaded relay from conceptual design phase.
Unknown file formatZMX KNGAO_cascade_140mmDM_straightthru_25mmMEM.ZMX r1 manage 48.8 K 2009-01-29 - 21:26 UnknownUser Cascaded-relay design, 1-tier, 140mm DM, avoiding dichroic changer.
PowerPointppt KNGAO_cascade_straightthru.ppt r1 manage 156.0 K 2009-01-08 - 21:10 UnknownUser Powerpoint slide of 100mm DM cascaded relay with no dichroic changer.
PowerPointppt KNGAO_cascade_straightthru_1tier.ppt r1 manage 121.5 K 2009-01-29 - 21:28 UnknownUser Powerpoint slide of 140mm DM cascaded relay with no dichroic changer.
PowerPointppt KNGAO_cascade_straightthru_1tier_100mm.ppt r1 manage 147.5 K 2009-02-23 - 17:22 UnknownUser Powerpoint slide of 1-tier, 100mm DM cascaded relay of 120" field with no dichroic changer.
PowerPointppt KNGAO_cascade_straightthru_1tier_100mm_v2.2.ppt r1 manage 124.0 K 2009-03-17 - 18:44 UnknownUser Powerpoint slide of 1-tier, 100mm DM cascaded relay of 120" FOV, no dichroic changer, proper orientation.
PowerPointppt KNGAO_cascade_straightthru_1tier_100mm_v2.ppt r1 manage 124.0 K 2009-03-17 - 18:40 UnknownUser Powerpoint slide of 1-tier, 100mm DM cascaded relay of 120" field with no dichroic changer.
PowerPointppt KNGAO_cascade_straightthru_1tier_100mm_v4.ppt r1 manage 252.0 K 2009-03-30 - 19:36 UnknownUser Powerpoint slide of 1-tier, 100mm DM cascaded relay of 120" field with no dichroic changer.
Unknown file formatZMX KNGAO_splitrelay_25mmDM_asphereLGSfeed_wtelescope_v4.ZMX r1 manage 55.2 K 2009-01-08 - 17:37 UnknownUser Single relay design, 25mm MEMs DM
Unknown file formatZMX NGAO-1-tier-champion-dec2007.ZMX r1 manage 51.1 K 2009-01-08 - 17:51 UnknownUser Cascaded-relay, 1-tier, 140mm DM carried over from conceptual design phase
JPEGjpg NGAO_OptoMech_SwithyardPickoffOption_Jan7,09.jpg r1 manage 265.4 K 2009-02-18 - 00:24 UnknownUser drawing of switchyard concept, with dimensions, on the white board Jan 7, 2009
Microsoft Word filedoc PDR_relay_design.doc r1 manage 1685.5 K 2009-03-31 - 21:08 UnknownUser draft document, preliminary optical design
Microsoft Word filertf Re__Opto-Mech_meeting_takeways.rtf r1 manage 5.9 K 2009-04-23 - 22:56 UnknownUser  
Unknown file formatEASM kngao_model_w_telescope.EASM r1 manage 934.3 K 2009-02-13 - 01:48 UnknownUser SolidWorks e-drawing of 2-tier layout and pickoff switchyard. (delete the enclosure to see the optics)
Edit | Attach | Watch | Print version | History: r71 | r21 < r20 < r19 < r18 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r19 - 2009-04-23 - DonaldGavel
 
  • Edit
  • Attach
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.