NGAO Preliminary Design Phase

-- Main.Jason Chin - Originated 09 February 2009

Laser System Design Effort (WBS 3.5 & 3.8), Preliminary Design Phase

Useful Information

WBS 3.3 System Engineering

WBS 3.3.5 External Interfaces

WBS 3.3.6 Internal Interfaces

WBS 3.5 Laser System Design

WBS 3.5.1 Laser Enclosure

WBS 3.5.1.1 Laser Enclosure Requirements

WBS 3.5.3 Laser Launch Facility (Includes Beam Transport System)

WBS 3.5.4 Safety System Design

WBS 3.5.5 Laser System Control

WBS 1.3.5.5.1 Laser System Control Software

WBS 3.8 Telescope integration & Test

WBS 3.8.1.2 K2 Laser Removal

WBS 3.10 Operations Handover

Others

Topic attachments
I Attachment History Action Size Date Who Comment
PDFpdf Environmental_and_Power_Control_Monitoring.pdf r2 r1 manage 131.0 K 2009-04-10 - 23:53 UnknownUser Environmental and Power Control and Monitoring System
Microsoft Excel Spreadsheetxls LGS_FacilityTrans_WFE_Budgets_V0.1.xls r1 manage 31.0 K 2009-05-06 - 00:17 UnknownUser Transmission and wavefront error budget
Microsoft Word filedoc NGAO_LGSF_Training.doc r1 manage 315.0 K 2009-05-08 - 20:10 UnknownUser Laser Guide Star Facility Training
Microsoft Word filedoc NGAO_Operations_Transition_Handover_Criteria.doc r1 manage 162.5 K 2009-05-08 - 20:12 UnknownUser Operations Transition Success Criteria
PDFpdf NGAO_Safety_System_Shutters.pdf r1 manage 166.8 K 2009-03-06 - 20:00 UnknownUser Description of Safety Shutter Layout for NGAO Safety System
Edit | Attach | Watch | Print version | History: r46 | r24 < r23 < r22 < r21 | Backlinks | Raw View | Raw edit | More topic actions...
Topic revision: r22 - 2009-05-15 - JasonChin
 