Line: 1 to 1 | ||||||||
---|---|---|---|---|---|---|---|---|
April 9, 2008 NGS EngineeringGoals | ||||||||
Line: 12 to 12 | ||||||||
| ||||||||
Changed: | ||||||||
< < | Personnel and engineering schedulesPlanning to be present: Angione, Baranec, Bouchez, Burruss, Roberts, Troy.Engineering schedules: | |||||||
> > | Personnel schedulePlanning to be present on 4/9/08 (local): Angione, Baranec, Bouchez, Burruss, Roberts, Troy.If night is clouded out, Bouchez will stay on for start of observing on 4/10/08. | |||||||
Procedures and test plansPlease post your test plans on the Test Plan Library page, and add a link below. | ||||||||
Line: 29 to 29 | ||||||||
| ||||||||
Changed: | ||||||||
< < |
| |||||||
> > |
| |||||||
|