April 9, 2008 NGS Engineering

Goals

Line: 27 to 27
 
Changed:
<
<
    • SSM motion and pupil registration (1 hr) - J. Roberts.
      • SSM range, pupil/image motion control, centroid to pupil motion gain)
>
>
 
    • Demonstrate new registration & flatmap routines (30 min) - J. Angione
    • Closed-loop performance (3 hr?) - A. Bouchez / J. Angione
      • Good seeing/Stable transmission.
      • V=6?, 8, 10, 12, 14
      • Test reconstructors?
Changed:
<
<
    • Predictive AO data (10-15 min per data collection, multiple times per night (3-4) if possible) - M. Troy.
    • Throughput (1 hr; clear) - R. Burruss.
    • Platescale (PHARO, ACAM, LOWFS) (1 hr) - A. Bouchez
      • Test Plan
>
>
 
Deleted:
<
<
    • Flexure (1 hr).
      • If daytime test shows significant flexure.
 