Difference: Eng_080409 (6 vs. 7)

Revision 72008-04-09 - AntoninBouchez

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

April 9, 2008 NGS Engineering

Goals

Line: 20 to 20
 Please post your test plans on the Test Plan Library page, and add a link below.
  • Daytime tests
    • AO bench setup and checkout (2 hrs) - J. Roberts
Added:
>
>
      • Align PHARO focus and pupil (DM and telescope).
 
      • Tune image on PHARO
      • Check centration of field stop.
Changed:
<
<
      • Check AO to telescope pupil alignment.
    • PHARO pupil motion (1 hr, telescope operator required) - A. Bouchez
    • Stimulus/AO system flexure (1 hr, telescope operator required) - R. Burruss
      • Demonstrate WL acquisition at all zenith angles.
      • Test Plan
>
>
 
  • Nighttime tests
    • SSM motion and pupil registration (1 hr) - J. Roberts.
      • SSM range, pupil/image motion control, centroid to pupil motion gain)
Line: 36 to 35
 
      • V=6?, 8, 10, 12, 14
      • Test reconstructors?
    • Predictive AO data (10-15 min per data collection, multiple times per night (3-4) if possible) - M. Troy.
Changed:
<
<
>
>
 
    • Throughput (1 hr; clear) - R. Burruss.
Changed:
<
<
>
>
 
 