Version 2 (5:15pm, 6/2/06) Monday 6/5 0800 AB arrives at Palomar 0800 1000 AB: Complete BTO breadboard setup and 660nm laser alignment. 1000 CS arrives at Palomar...
05/16/06 Experiments and Analysis Conclusions I suggest replacing the M2 mirror with an enhanced aluminum version, such as CVI part EAV PM 4050 C ($730). This will...
All, I just returned from a long day at Palomar. Here`s what I got done on the BtO: (I will also post this on the TWiki site BtO page...) 1. Checked stability and...
Palomar AO engineering run summary (2005 2006) Semester 06B UT Date Mode Conditions Seeing Log Comments 10/14/06 LGS rain link...
June 12 14, 2006 LGS Engineering Run Pre run engineering work 6/5 6/6 BTO work schedule laser sched 060606.pdf: CSFL tasks for 6/06 LGS engineering run...
September 5 7, 2006 LGS Engineering Run Project schedules and task lists laser upgrade schedule LGS IPT meeting minutes, with task list JPL AO meeting...
October 11 13, 2006 LGS Engineering Run Project schedules and task lists task schedule, v1 A. Bouchez 10/2/06 Oct. engineering run personnel schedule...
December 6 8, 2006 LGS engineering run Schedules and calendars Dec. engineering run personnel schedule (v3) A. Bouchez 12/05/06 (v2) Safety documents...
January 5 7, 2007 LGS engineering run Safety documents Cleared by FAA for laser projection 18:00 05:45 PST. Spotters scheduled to be on site 20:00 06:...
February 27 March 1, 2007 LGS engineering run Safety documents FAA documents: letter of non objection (0 45 deg. zenith angle). Securitas spotters...
April 2 6, 2007 LGS observing run Safety documents FAA documents: letter of non objection (0 45 deg. zenith angle). Securitas spotters are scheduled...
April 23 27, 2007 LGS observing run Night logs and results 4/24/07 UT Closed due to fog until 2:30am, then opened for NGS engineering due to low laser power...
May 23 26, 2007 LGS observing run Night logs and results 5/24/07 UT Laser and BTO setup until 10:00pm. Then checked LLT boresighting no adjustments necessary...
July 23 28, 2007 LGS observing run Night logs and results 7/24/07 UT Clear, excellent seeing. Completed laser and BTO setup for first 4 hrs. Then measured bright...
August 23 25, 2007 LGS observing run Night logs and results 8/24/07 UT Photometric. Completed BTO setup for 1 hr. Measured LLT imaging performance (1.9` stars...
September 18 21, 2007 LGS observing run Night logs and results 9/19/07 UT Never opened due to high humidity and AO dynamic aperture device (DAD) failure. Laser...
October 22 27, 2007 LGS Observing Run Night logs and results 10/23/07 UT Observing cancelled due to fire danger and high winds. 10/24/07 UT Observing cancelled...
June 14 20, 2008 LGS observing run Night logs and results 6/15/08 UT Photometric. Completed various calibrations and testing of the LGS system. Tested primary...
August 11 13, 2008 LGS observing run Night logs and results 8/12/08 UT Clear, seeing 0.8` in K. Aligned BTO, laser. Laser power 7.5 7.2 W. Canceled LGS operations...
September 15 22, 2008 LGS observing run Nightly Summaries 9/16/08 UT Scattered clouds, seeing 0.8` in K. Spent first half of the night on AO/PHARO/BTO setup after...
October 14 16, 2008 LGS observing run Nightly Summaries 10/15/08 UT Clear, seeing ~1.9` in V. Laser power 6.0 W. Attempted to diagnose BTO servo loop instability...
December 11 12, 2008 LGS observing run Nightly Summaries 12/12/08 UT Mostly cloudy, 1.0` seeing in R. Performed NGS observations with SWIFT most of night. Performance...
January 10 16, 2009 LGS observing run Nightly Summaries 1/11/09 UT (SWIFT LGS engineering) Clear and windy. Laser power 5.1 4.9 W. Seeing 4 6`. Opened for...
August 6 10, 2009 LGS SWIFT observing run Nightly Summaries Aug. 7, 2009 UT Clear, 2.0 3.0` seeing due to primary mirror 6 C hotter than dome air. Laser power...
October 8 13, 2009 LGS PHARO/SWIFT observing run Nightly Summaries 10/09/09 UT Closed due to ash until 2:20am. Observed LCROSS impact. 10/10/09 UT Closed due...
January 5 7, 2010 LGS SWIFT observing run Nightly Summaries 1/06/10 UT Ash and moderate to thick cirrus. Laser power 6.5 7.3 W. Closed until 22:00 due to ash...
Palomar LGS Test Plan Library Please list your test plans by observing run, and add a link from the observing run page. Test plan template: doc, pdf General AO setup...