Tags:
create new tag
view all tags

Backlinks to ViswaVelur in all Webs (Search Main Web only)

Results from Main web retrieved at 12:22 (GMT)

CooCampus Set GROUP AntoninBouchez, ErnestCroner, RichardDekany, AnnaMoore, ViswaVelur Set ALLOWTOPICCHANGE CooCampus Related topics: , TWikiGroups...
List of TWiki users Below is a list of users with accounts. If you want to edit topics or see protected areas of the site then you can get added to the list by...
Main Web Preferences The following settings are web preferences of the Main web. These preferences overwrite the site level preferences in ., and can...
Number of topics: 3

Results from Cahill web retrieved at 12:22 (GMT)

Statistics for Cahill Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save...
Number of topics: 1

Results from Keck/NGAO web retrieved at 12:22 (GMT)

Keck NGAO Team Meeting #2 8:30a 5:30p Tuesday, November 14, 2006 012 Robinson Laboratory, Caltech (moved to 023) Telecon attendees: 877 280 4645 passcode...
Keck NGAO Team Meeting #3 9:50a 2:30p PST Wednesday, December 13, 2006 Tele/Videoconference Dial in Number: 977 280 4645 Passcode: 540030 Videoconference...
Keck NGAO Team Meeting #4 8:00a 5:30p (Hawaii Standard Time) Monday, January 22, 2007 Hualalai Conference Room, WMKO Headquarters, Waimea, HI Telecon attendees...
Keck NGAO Team Meeting #5 9:50a 4:00p PST Wednesday, March 7, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
Keck NGAO Team Meeting #10 8:00a 6:00p Monday, September 17, 2007 012 Robinson Laboratory, Caltech Telecon attendees: 877 280 4645 passcode 540030 (video status...
Keck NGAO Team Meeting #11 9:00a 6:00p PST (note change from PDT to PST on Nov. 4) 7:00a 4:00p HST Monday, November 5, 2007 Tele/Videoconference Dial in...
Keck NGAO Team Meeting #12 10:00a 5:30p PST 8:00a 3:30p HST Thursday, December 13, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
Keck NGAO PD Team Meeting #5 1:00p 5:00p PST 11:00a 3:00p HST Thursday, February 5, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
Keck NGAO PD Team Meeting #6 1:00p 5:00p PDT 10:00a 2:00p HST Thursday, March 19, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
Keck NGAO PD Phase LGS WFS Mini Review 10:00a 02:00p PDT 08:00a 12:00p HST Monday, December 7, 2009 Tele/Videoconference Dial in Number: 877 280 4645 Passcode...
Working files for 102018 interface meeting Slightly tweeked version of Reni`s layout v9 ZMX Output science fold mirror tilt opened by 5 degrees (from...
Keck NGAO PD Phase NGS WFS Mini Review 11:00a 03:00p PDT 08:00a 12:00p HST April 1st, 2010 Tele/Videoconference Dial in Number:626 395 8884 Videoconference...
AO System Design Effort (WBS 3.2 3.3), System Design Phase PDR Phase Opto Mechanical Design page Opto Mechanical Mini Design Review, Nov 2009 Management...
NGAO Performance Flowdown Worksheets A performance flowdown is the allocation of error terms to constituent subsystems or components Update (4/25/10): The performance...
NGAO Functional Requirements SD Phase (Old) This page presents various drafts and background information on the NGAO functional requirements: 1. Background information...
Post retreat homework assignments Trade Study Possibilities v2.doc: Trade Study Possibilities v2.doc NGAO Risks v1.xls: Initial draft of risk matrix (from IW...
180` Technical FoV (TFoV) Relay Architecture to NGAO Architecture Retreat Starting definitions https://www.oir.caltech.edu/twiki oir/pub/Keck/NGAO/LargeRelay...
WBS 3.3 LGS Facility (NGAO System Design Collection) Work Package Meetings Kick off meeting held on 4th Sept., 2007 (attendees: J. Bell, J. Chin, C. Neyman, Erik...
NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
This collection is for Opto Mechanical Graphics in support of design and interface control. Telescope: Note: WM Keck DSM team is working on a Solidworks 3D Model...
This collection is for maintaining the Systems Engineering Management Plan (SEMP) documentation for the PDR. Breakdown Structure (PBS) (2/26/10) Work...
NGAO System Architecture WBS 3.1.3 Work Package Schedule Subsystem Evaluation Criteria Form.xls. Please use this form when performing your subsystem evaluations...
NGAO Wavefront Sensors Preliminary Design Phase Laser Guide Star (LGS) WFS Subsystem Consisting of the Fixed LGS asterism assembly and Patrolling LGS asterism assembly...
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
Number of topics: 24

Results from Palomar web retrieved at 12:22 (GMT)

Statistics for Palomar Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save...
Number of topics: 1

Results from Palomar/PTF web retrieved at 12:22 (GMT)

CFH12K MOSAIC lab Integration and testing page Lab tests on 12K CCD array profilometry measurements: profile measurements.pdf: Mosaic profilometry MOSAIC focal...
Optical design Original optical design: ZMX: Larry Scherr`s P48 Zemax file for QUEST camera Current Optical Design: Field flattener.pdf: Field Flattener design...
General telescope infrastructure notes for the MOSAIC project MOSAIC notes.pdf: MOSAIC notes (Velur, Petrie 10/19/2007) Vertex RSI P48 TCS.pdf: P48 TCS documentation...
Number of topics: 3

Results from Palomar/PalmLGS web retrieved at 12:22 (GMT)

Spie2006 Orlando, 24 31 May 2006 Presentations and posters spie06 palomarlgs.pdf: Bouchez et al., Laser Guide Star Adaptive Optics at Palomar Observatory,...
Chicago Sum Frequency Laser Upgrade Documents cooling schematic.pdf: CSFL cooling schematic laser.pdf: current CSFL schematic LGS inventory (LGS inventory...
Vendor list Non linear Crystal databaseDocument Actions last edited 3 months ago by abouchez Conex systems, Inc. San Ramon, CA Ph: 925 735 8825 Contact Ting...
ViswaVelur 13 May 2006 Optics.xls: Optics inventory EEC, VNV 5/12/06 Inventory.xls: General inventory (sans optics) EEC, VNV 5/12/06
August 2006 Laser Move from Coude to AO lab Laser move preparations Pictures taken at Palomar by VNV: JPG: ID of connector 0.155` (may need to be reamed...
Astronomical Telescopes and Instrumentation 2006 Advances in adaptive optics CSFL spie.pdf: preprint of paper on LGS testbed at Palomar observatory ViswaVelur...
Astronomical Telescopes and Instrumentation 2006 mgsu paper.pdf: Velur et al., Multiple Guide Star Unit: Palomar`s Tomograph, 6272 188 (preprint). MGSU poster...
Number of topics: 7

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback