Tags:
create new tag
view all tags

Backlinks to AntoninBouchez in all Webs (Search Main Web only)

Results from Main web retrieved at 09:21 (GMT)

080131 All Hands Meeting COO All Hands Meeting Thursday, January 31, 2008 1:30p to 2:30p 023 Rob (on campus) Video link to Palomar Agenda: Project Status Triplespec...
100127 COO All Hands Meeting Wednesday January 27, 2009 8:30a Noon 126 Cahill Video IP 131.215.193.38 Agenda: 0830 Overview Dekany 0835 CWI, KCWI, IRIS...
CooCampus Set GROUP AntoninBouchez, ErnestCroner, RichardDekany, AnnaMoore, ViswaVelur Set ALLOWTOPICCHANGE CooCampus Related topics: , TWikiGroups...
PalmLgsIPT Set GROUP OirAdmin,Main.RichardDekany, AntoninBouchez,Main.Others... Set ALLOWTOPICCHANGE PalmLgsIPT Related topics: , TWikiGroups,...
List of TWiki users Below is a list of users with accounts. If you want to edit topics or see protected areas of the site then you can get added to the list by...
Main Web Preferences The following settings are web preferences of the Main web. These preferences overwrite the site level preferences in ., and can...
Statistics for Main Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save and...
Number of topics: 7

Results from Keck/NGAO web retrieved at 09:21 (GMT)

SSC Meeting on June 21, 2006 (Waimea, HI) Call in number 1 877 280 4645; Passcode (room number) 109022 NGAO Agenda Next Generation Adaptive Optics (All times are...
NGAO Team Meeting #1 Directions: http://www.physics.uci.edu/~barth/ksm2006/NGAOdirections.html Status of Action Items from Meeting #1 as of 9/20/06: Items Goals:...
Keck NGAO Team Meeting #4 8:00a 5:30p (Hawaii Standard Time) Monday, January 22, 2007 Hualalai Conference Room, WMKO Headquarters, Waimea, HI Telecon attendees...
Keck NGAO Team Meeting #5 9:50a 4:00p PST Wednesday, March 7, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
NGAO Performance Flowdown Worksheets A performance flowdown is the allocation of error terms to constituent subsystems or components Update (4/25/10): The performance...
KNGAO GOODS N Science Case Reference paper: giavalisco04.pdf Field center (J2000): RA 12 36 55 Dec 62 14 15 Minimum zenith angle: 42.4 degrees AntoninBouchez...
Post retreat homework assignments Trade Study Possibilities v2.doc: Trade Study Possibilities v2.doc NGAO Risks v1.xls: Initial draft of risk matrix (from IW...
NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
KNGAO Science Case GOODS N sky coverage simulation AntoninBouchez 04 May 2006
Systems Engineering Indian Wells charts Point Design chart Point design spitter farm v2 AntoninBouchez 28 Apr 2006 Indian Wells point design Point Design spread...
Transmission and Background Budget pages Documents 501: NGAO Background and Transmission Budgets: AHB 8/28/07 Old versions: v1.0 (8/8/07) Modeling software...
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
Number of topics: 12

Results from Palomar web retrieved at 09:21 (GMT)

Statistics for Palomar Web Month: Topic views: Topic saves: File uploads: Most popular topic views: Top contributors for topic save...
Number of topics: 1

Results from Palomar/PalmLGS web retrieved at 09:21 (GMT)

Engineering Test Plan (v3) Testing 1, 2, 3. AntoninBouchez 11 Apr 2006
Version 2 (5:15pm, 6/2/06) Monday 6/5 0800 AB arrives at Palomar 0800 1000 AB: Complete BTO breadboard setup and 660nm laser alignment. 1000 CS arrives at Palomar...
Spie2006 Orlando, 24 31 May 2006 Presentations and posters spie06 palomarlgs.pdf: Bouchez et al., Laser Guide Star Adaptive Optics at Palomar Observatory,...
PALMAO bench The PALMAO optical bench is placed onto the Cassegrain focus of the 200` Hale telescope. The system contains (1) the AO science instrument; (2) the deformable...
Testing 1, 2, 3.... AntoninBouchez 02 Jun 2006
AO Acquistion Camera Pulnix LGS platescale: Acq LGS platescale.txt A. Bouchez 7/17/06
Palomar Automated Airspace Safety Systems Palomar`s multi tiered airspace safety system consists of an all sky visible camera (ASCAM), a narrow field mid infrared...
Beam Transfer Optics The beam transfer optics subsystem delivers the 589nm laser beam from the Coude lab to the laser launch telescope located behind the Hale telescope...
05/16/06 Experiments and Analysis Conclusions I suggest replacing the M2 mirror with an enhanced aluminum version, such as CVI part EAV PM 4050 C ($730). This will...
All, I just returned from a long day at Palomar. Here`s what I got done on the BtO: (I will also post this on the TWiki site BtO page...) 1. Checked stability and...
AO Cassegrain Cage Setup Wiring diagrams AO wiring diagram: DWG,PDF J. Hickey 6/22/06 Installation Documents AO bench setup and checkout: doc, Chopper...
Chicago Sum Frequency Laser Upgrade Documents cooling schematic.pdf: CSFL cooling schematic laser.pdf: current CSFL schematic LGS inventory (LGS inventory...
Palomar AO engineering run summary (2005 2006) Semester 06B UT Date Mode Conditions Seeing Log Comments 10/14/06 LGS rain link...
August 17 20, 2005 NGS Engineering Run Test schedule: 050818 engplan v2.pdf: NGS Engineering schedule v2 Test plans: Night logs: AntoninBouchez 13 May 2006
September 19 22, 2005 LGS Engineering Run Test schedule: 050920 engplan v2.pdf: LGS engineering test schedule v2 Test plans: Night logs: palm lgs log...
November 14 18, 2005 LGS Engineering Run Test schedule: lgs0511 schedule v2.xls: LGS Engineering schedule v2 Test plans: Night logs: palm lgs log 051116.txt...
December 12 13, 2005 NGS Engineering Run Test schedule: Test plans: Night logs: AntoninBouchez 12 May 2006
January 11 12, 2006 NGS Engineering Run Test schedule: lgs0601 schedule v4.xls: LGS Engineering test plan v4 Test plans: Night logs: AntoninBouchez 12 May...
February 9 11, 2006 NGS Engineering Run Test schedule: lgs0602 schedule v2.xls: Engineering test schedule, v2.1 Test plans: testplan 0602 lowfs perf.pdf: LOWFS...
April 13 15, 2006 LGS Engineering Run Test schedule: lgs0604 schedule v3.xls: lgs0604 schedule v3.xls Test plans: Night logs: https://www.oir.caltech.edu...
June 12 14, 2006 LGS Engineering Run Pre run engineering work 6/5 6/6 BTO work schedule laser sched 060606.pdf: CSFL tasks for 6/06 LGS engineering run...
July 11 13, 2006 LGS Engineering Run Project schedules and task lists plan for new CSFL etalons LGS IPT meeting minutes Safety documents letter of...
September 5 7, 2006 LGS Engineering Run Project schedules and task lists laser upgrade schedule LGS IPT meeting minutes, with task list JPL AO meeting...
October 11 13, 2006 LGS Engineering Run Project schedules and task lists task schedule, v1 A. Bouchez 10/2/06 Oct. engineering run personnel schedule...
December 6 8, 2006 LGS engineering run Schedules and calendars Dec. engineering run personnel schedule (v3) A. Bouchez 12/05/06 (v2) Safety documents...
January 5 7, 2007 LGS engineering run Safety documents Cleared by FAA for laser projection 18:00 05:45 PST. Spotters scheduled to be on site 20:00 06:...
February 27 March 1, 2007 LGS engineering run Safety documents FAA documents: letter of non objection (0 45 deg. zenith angle). Securitas spotters...
April 2 6, 2007 LGS observing run Safety documents FAA documents: letter of non objection (0 45 deg. zenith angle). Securitas spotters are scheduled...
April 23 27, 2007 LGS observing run Night logs and results 4/24/07 UT Closed due to fog until 2:30am, then opened for NGS engineering due to low laser power...
May 23 26, 2007 LGS observing run Night logs and results 5/24/07 UT Laser and BTO setup until 10:00pm. Then checked LLT boresighting no adjustments necessary...
July 23 28, 2007 LGS observing run Night logs and results 7/24/07 UT Clear, excellent seeing. Completed laser and BTO setup for first 4 hrs. Then measured bright...
August 23 25, 2007 LGS observing run Night logs and results 8/24/07 UT Photometric. Completed BTO setup for 1 hr. Measured LLT imaging performance (1.9` stars...
September 18 21, 2007 LGS observing run Night logs and results 9/19/07 UT Never opened due to high humidity and AO dynamic aperture device (DAD) failure. Laser...
October 22 27, 2007 LGS Observing Run Night logs and results 10/23/07 UT Observing cancelled due to fire danger and high winds. 10/24/07 UT Observing cancelled...
June 14 20, 2008 LGS observing run Night logs and results 6/15/08 UT Photometric. Completed various calibrations and testing of the LGS system. Tested primary...
August 11 13, 2008 LGS observing run Night logs and results 8/12/08 UT Clear, seeing 0.8` in K. Aligned BTO, laser. Laser power 7.5 7.2 W. Canceled LGS operations...
September 15 22, 2008 LGS observing run Nightly Summaries 9/16/08 UT Scattered clouds, seeing 0.8` in K. Spent first half of the night on AO/PHARO/BTO setup after...
October 14 16, 2008 LGS observing run Nightly Summaries 10/15/08 UT Clear, seeing ~1.9` in V. Laser power 6.0 W. Attempted to diagnose BTO servo loop instability...
December 11 12, 2008 LGS observing run Nightly Summaries 12/12/08 UT Mostly cloudy, 1.0` seeing in R. Performed NGS observations with SWIFT most of night. Performance...
January 10 16, 2009 LGS observing run Nightly Summaries 1/11/09 UT (SWIFT LGS engineering) Clear and windy. Laser power 5.1 4.9 W. Seeing 4 6`. Opened for...
August 6 10, 2009 LGS SWIFT observing run Nightly Summaries Aug. 7, 2009 UT Clear, 2.0 3.0` seeing due to primary mirror 6 C hotter than dome air. Laser power...
October 8 13, 2009 LGS PHARO/SWIFT observing run Nightly Summaries 10/09/09 UT Closed due to ash until 2:20am. Observed LCROSS impact. 10/10/09 UT Closed due...
January 5 7, 2010 LGS SWIFT observing run Nightly Summaries 1/06/10 UT Ash and moderate to thick cirrus. Laser power 6.5 7.3 W. Closed until 22:00 due to ash...
Error budgets and Performance Models LGS flux analysis v2.1 A. Bouchez Old versions: https://www.oir.caltech.edu/twiki oir/pub/Palomar/PalmLGS/ErrorBudget...
Laser IPT Meeting Minutes Laser integrated produce team meetings are held Mondays 9:00 10:00am in 012 Robinson. The call in number is: 866 674 1191 x8203140....
Laser Automation Computer Users Guide LGS computer How To 070518.txt S. Guiwits, 6/12/07 Requirements, etc. 617: Laser Automation Computer Requirements...
Laser Launch Telescope subsystem The laser launch telescope is a 45 cm Magnin reflecting telescope mounted on the optical axis of the Hale Telescope, behind the secondary...
Oct. 9, 2009 UT LCROSS Impact Imaging Preliminary Results Palomar AO image of Cabeus crater 10s after Centaur impact: ... and 15s after impact. No obvious detection...
LGS AO Library LGS AO system characterization Dam et al. 2006, The W.M. Keck Observatory laser guide star adaptive optics system: Performance characterization...
LGS Project Schedules FY07 lgs 0612 personnel shed v2.pdf: 12/06 Palomar LGS schedule v2 AB 11/29/06 FY06 laser 060510.pdf: Laser schedule May June...
Management IPT Meeting Minutes Management integrated produce team meetings are held biweekly, Wednesdays 8:00 10:00am, at JPL. Management Mtg. (v2, edited 6/...
Palomar Science Meeting 2006 Presentations PALAO LGS Science meeting CS.ppt: AO presentation part 1 C. Shelton PALAO LGS Science meeting AB.ppt: AO presentation...
Solidworks Models of the LLT bench LLT FULL ASSEMBLY 18 Inch Diagnostics.EASM: Edrawings file of full LLT model H. Petrie, 2/25/08. Externally supplied SW part...
Astronomical Telescopes and Instrumentation 2006 mgsu paper.pdf: Velur et al., Multiple Guide Star Unit: Palomar`s Tomograph, 6272 188 (preprint). MGSU poster...
LGS Team Meetings Team meetings are held once per month, on 3:30pm 5:00pm on Thursdays in 023 Robinson on the Caltech campus. A video conference system is available...
Palomar LGS Test Plan Library Please list your test plans by observing run, and add a link from the observing run page. Test plan template: doc, pdf General AO setup...
Zemax Models of the LLT bench Original models of LLT optical path by Chris Shelton (as designed): ZMX: telescope through the FSM, and a star camera. This has...
Number of topics: 57

Results from Palomar/SWIFT web retrieved at 09:21 (GMT)

Antonin, I`ve put a zemax file with matching OAP macro onto docushare, in Palomar AO, in a new folder called `Raytrace Files`. This has telescope, AO relay, and SSMs...
SWIFT performance predictions On axis wavefront error as a function of NGS magnitude in two different seeing conditions (median 1.1` and excellent 0.7`). The crossover...
SWIFT Project Web SWIFT is an I z band AO assisted integral field spectrograph designed and built by the University of Oxford (PI: Niranjan Thatte). It combines high...
Number of topics: 3

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback