Tags:
create new tag
view all tags

Backlinks to SystemsEngineering in Keck/NGAO Web (Search all webs)

Results from Keck/NGAO web retrieved at 16:53 (GMT)

Indian Wells NGAO Retreat Participants: Sean Adkins, Brian Bauman, Jim Bell, Antonin Bouchez, Matthew Britton, Jason Chin, Richard Dekany, Ralf Flicker, Don Gavel...
Keck NGAO Team Meeting #3 9:50a 2:30p PST Wednesday, December 13, 2006 Tele/Videoconference Dial in Number: 977 280 4645 Passcode: 540030 Videoconference...
Keck NGAO Team Meeting #4 8:00a 5:30p (Hawaii Standard Time) Monday, January 22, 2007 Hualalai Conference Room, WMKO Headquarters, Waimea, HI Telecon attendees...
Keck NGAO Team Meeting #5 9:50a 4:00p PST Wednesday, March 7, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
Keck NGAO Team Meeting #6 9:00 a 6:00 p (Pacific Daylight Time) Wed, April 25 and Thurs, April 26, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
Keck NGAO PD Team Meeting #3 9:00a 6:00p PST on Sept. 11; 9:00a 5:00p on Sept. 12. 6:00a 3:00p HST on Sept. 11; 6:00a 2:00p on Sept. 12. Thursday and Friday...
NIRC 2 and OSIRIS Interfaces Message sent from R. Dekany to J. Larkin, and K. Matthews: Hi, James, Keith, In considering a point design for NGAO, we`ve been wondering...
NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
This collection is for maintaining the Preliminary Design Phase Management Plan. Preliminary Design (PD) Phase Plan from System Design Review (SDR) Systems Engineering...
This collection is for maintaining the Systems Engineering Management Plan (SEMP) documentation for the PDR. Breakdown Structure (PBS) (2/26/10) Work...
PD Phase Functional Requirements PD Requirements Review Phase II March 2010 Goals The NGAO project will finalize the System and Functional requirements over the...
Near IR Tip Tilt Sensor Preliminary Design Review (PDR): Date: Monday, April 25, 2011 Time: 12:00pm 6:00pm PDT/ 9:00am 3:00pm HST Reviewers: Corinne...
This collection is for producing the Systems Engineering Management Plan to be presented at the System Design Review. WBS 4.1.1 Work Breakdown Structure Task Definitions...
This collection is for System Design Phase Planning and Tracking Documents EC Telecon Dial in Number 877 280 4645 with passcode 540030 (via WMKO) Systems Engineering...
Near IR Tip Tilt Sensor System Design Review (SDR): Date: Tuesday, December 7, 2010 Time: 10:30am 4:00pm HST / 12:30pm 6:00pm PST Reviewers: Corinne...
NGAO Systems Engineering Analysis Point and shoot study and Shoot Trade Study propagration in LGS tomography (KAON 621) and Shoot SPIE paper (KAON...
NGAO Systems Engineering Group Twiki Page A. Mini Design Reviews Actions Lists This list tracks outstanding action items from the PD phase NGAO mini reviews...
1 Project Scope: Enabling front page astronomical science by designing, building, and deploying the world`s most advanced astronomical adaptive optics instrumentation...
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
Number of topics: 19

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback