Tags:
create new tag
view all tags

Backlinks to SystemDesignPhasePlanning in Keck/NGAO Web (Search all webs)

Results from Keck/NGAO web retrieved at 03:50 (GMT)

Keck NGAO Team Meeting #6 9:00 a 6:00 p (Pacific Daylight Time) Wed, April 25 and Thurs, April 26, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
Keck NGAO Team Meeting #10 8:00a 6:00p Monday, September 17, 2007 012 Robinson Laboratory, Caltech Telecon attendees: 877 280 4645 passcode 540030 (video status...
Keck NGAO Team Meeting #11 9:00a 6:00p PST (note change from PDT to PST on Nov. 4) 7:00a 4:00p HST Monday, November 5, 2007 Tele/Videoconference Dial in...
Keck NGAO Team Meeting #12 10:00a 5:30p PST 8:00a 3:30p HST Thursday, December 13, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
NGAO Keck Adaptive Optics Notes Quick link to 2013 MSIP proposal page Complete List of Keck Adaptive Optics Notes KAON Summary by Category Technical...
NGAO Proposal WBS Dictionary (Goal is a dictionary entry for each line of the WBS; make no entries here, rather submit to Peter by email) 1 System Design Phase...
1 Project Scope: Enabling front page astronomical science by designing, building, and deploying the world`s most advanced astronomical adaptive optics instrumentation...
Number of topics: 7

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback