Tags:
create new tag
view all tags

Backlinks to NewKAONs in Keck/NGAO Web (Search all webs)

Results from Keck/NGAO web retrieved at 13:51 (GMT)

Keck NGAO Team Meeting #6 9:00 a 6:00 p (Pacific Daylight Time) Wed, April 25 and Thurs, April 26, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
WBS 3.1.3 Kickoff Meeting Meeting Materials NGAO Architecture Taxonomy.pdf: A shorthand nomenclature for discussion of potential NGAO architectures R. Dekany...
Keck NGAO Team Meeting #8 9:00 a 6:00 p (Pacific Daylight Time) Mon, July 9 to Fri, July 13, 2007 Center for Adaptive Optics, UC Santa Cruz Telecon attendees...
Keck NGAO Team Meeting #9 10:00a 3:30p PDT Friday, August 24, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode: 540030 Videoconference IP...
Keck NGAO Team Meeting #12 10:00a 5:30p PST 8:00a 3:30p HST Thursday, December 13, 2007 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
Keck NGAO PD Team Meeting #2 12:00p 3:00p PST 9:00a 12:00p HST Tuesday, August 19, 2008 Tele/Videoconference Dial in Number: 877 280 4645 Passcode:...
LO WFS PD mini review 11:00a 03:00p PDT 08:00a 12:00p HST Friday, April 2, 2010 Tele/Videoconference Conference Room direct #: 626 395 8884 or 626 395...
Alignment, Calibration Performance Monitoring PD mini review 11:00a 03:00p PDT 08:00a 12:00p HST Tuesday, April 20, 2010 Tele/Videoconference Conference...
AO System Design Effort (WBS 3.2 3.3), System Design Phase PDR Phase Opto Mechanical Design page Opto Mechanical Mini Design Review, Nov 2009 Management...
Control Systems Software Mini Review: April 16, 2010 Review Schedule Material to web site: COB Tue April 6, 2010 Response from reviewers due: COB Tue...
NGAO Controls Systems Home Page NGAO Background Information Multi Systems Command Sequencer (MCS) SW Architecture Work (KCSF) Control Systems Software Preliminary...
NGAO Background Information From Controls Team Meetings Kickoff meeting, Aug 5, 2008 Slides Intro to AO, Aug 28, 2008 https://www.oir...
DAVINCI Mini Review Final Reviewer Report 743 Final Report on the NGAO DAVINCI Instrument Mini Design Review Agenda and Scope/Objectives DAVINCI Mini review...
NGAO Electronics Architecture Mini Design Review, 26 January 2010 Review Schedule Material to web site: 15 Jan Response from reviewers due: end of day...
NGAO Functional Requirements SD Phase (Old) This page presents various drafts and background information on the NGAO functional requirements: 1. Background information...
NGAO Motion Control Architecture Mini Design Review, 11 March 2010 Review Schedule Material to web site: 4 Mar Response from reviewers due: end of day...
System Requirements Document Final Version for System Design Review 456 System Requirements Document (pdf) Draft Versions KAON456 NGAO SRD v1.14.doc...
1 This collection is for the NGAO Science Advisory Team SAT Members: Laird Close, George Djorgovski, Richard Ellis, James Graham, Michael Liu, Keith Matthews...
Notes on Keck AO for PSF Recovery Project AO General AO documentation can be found here Keck AO public Webpage AO Sign Conventions and Geometry Keck DM to WFS geometry...
NGAO Science Operations during the SD phase (approved by EC) WBS 3.4.1.2: Interfaces (approved to EC) WBS 3.4.2.1: Operations Architecture (updated on...
Design Standards: 484 Optical Design Practices for NGAO Exporting Zemax as a STEP file: Zemax Export Screen Snapshot Zemax files can be imported to Solidworks...
NGAO Opto Mechanics Mini Design Review, November 17, 2009 NOTE CHANGE The review date has been changed to November 17 to allow more time for the reviewers to read...
AO System Design Link to Opto Mechanical Mini Design Review 17, 2009 Opto Mechanical Design Meeting Minutes 21, 2009 5,2009 2, 2009...
This collection is for maintaining the Preliminary Design Phase Management Plan. Preliminary Design (PD) Phase Plan from System Design Review (SDR) Systems Engineering...
This collection is for maintaining the Preliminary Design Phase Reports and tracked versions of the schedule. NGAO Project Schedules Tracked version of the Build...
PSF Reconstruction (PSF R) Project Scope: 1) Demonstrate NGS AO PSF Reconstruction with the Gemini Altair Keck AO systems (near term funded work). 2) Understand...
This collection is for supporting the development of a Plan for Phased Implementation and Descopes. 594 Plan to Address Phased Implementation and Descope Options...
This collection is for producing the Systems Engineering Management Plan to be presented at the System Design Review. WBS 4.1.1 Work Breakdown Structure Task Definitions...
SW Architecture Review, August 24, 2009 Review Documents: Charter Requirements Design on Middleware Supplementary Material: KAON 671: NGAO...
NGAO System Architecture WBS 3.1.3 Work Package Schedule Subsystem Evaluation Criteria Form.xls. Please use this form when performing your subsystem evaluations...
This collection is for System Design Phase Planning and Tracking Documents EC Telecon Dial in Number 877 280 4645 with passcode 540030 (via WMKO) Systems Engineering...
NGAO Systems Engineering Analysis Point and shoot study and Shoot Trade Study propagration in LGS tomography (KAON 621) and Shoot SPIE paper (KAON...
Transmission and Background Budget pages Documents 501: NGAO Background and Transmission Budgets: AHB 8/28/07 Old versions: v1.0 (8/8/07) Modeling software...
1 Project Scope: Enabling front page astronomical science by designing, building, and deploying the world`s most advanced astronomical adaptive optics instrumentation...
NGAO System Design Phase Work Packages Link to all NGAO KAON`s All Work Packages listed here require a Scope Planning Sheet, unless otherwise noted WBS Work...
Number of topics: 35

 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback